LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Wednesday, 01 July 20
COLOMBIA'S COAL EXPORT VOLUMES HAVE STEADILY DECLINED IN RECENT YEARS - BANCHERO COSTA
Colombia is the world’s fifth largest seaborne exporter of coal, coming after Australia, Indonesia, Russia and the USA.   Export ...


Wednesday, 01 July 20
MARKET INSIGHT - INTERMODAL
It was beginning of 2020 – close to 6 months from now – when we first experienced the huge impact of the COVID 19 outbreak on Ship Repa ...


Monday, 29 June 20
INDONESIAN COAL AT THE MERCY OF THE DRAGON AND TIGER - GHEE PEH | IEEFA
Coal sector analysts have been busy in recent months mapping the negative impact of low coal prices from the COVID-19 pandemic on Indonesian coal c ...


Monday, 29 June 20
FALLING DEMAND IN CHINA AND INDIA SIGNAL TOUGH TIMES AHEAD FOR INDONESIAN EXPORTS - GHEE PEH | EEFA
Assessing the Impact on Indonesian Coal Companies   The bad news for Indonesia’s coal companies is that they are likely to have ...


Monday, 29 June 20
INDIA COAL IMPORT OUTLOOK: WEAK DEMAND, IMPORT SUBSTITUTION, EXPECT 20% YOY DECLINE - GHEE PEH | IEEFA
For India, the coal demand indicators have clearly turned negative.    According to Argus Media, since the government declared a ...


   176 177 178 179 180   
Showing 886 to 890 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • CoalTek, United States
  • Ministry of Finance - Indonesia
  • SN Aboitiz Power Inc, Philippines
  • The Treasury - Australian Government
  • Cigading International Bulk Terminal - Indonesia
  • Aboitiz Power Corporation - Philippines
  • Gujarat Mineral Development Corp Ltd - India
  • Sarangani Energy Corporation, Philippines
  • Coal India Limited
  • ANZ Bank - Australia
  • ASAPP Information Group - India
  • Orica Australia Pty. Ltd.
  • Indorama - Singapore
  • PNOC Exploration Corporation - Philippines
  • Gresik Semen - Indonesia
  • Planning Commission, India
  • Singapore Mercantile Exchange
  • SMG Consultants - Indonesia
  • Ernst & Young Pvt. Ltd.
  • PowerSource Philippines DevCo
  • OCBC - Singapore
  • Deutsche Bank - India
  • CNBM International Corporation - China
  • Port Waratah Coal Services - Australia
  • Arutmin Indonesia
  • Asian Development Bank
  • Malco - India
  • Kepco SPC Power Corporation, Philippines
  • Shenhua Group - China
  • TeaM Sual Corporation - Philippines
  • Sinarmas Energy and Mining - Indonesia
  • Petron Corporation, Philippines
  • Oldendorff Carriers - Singapore
  • Antam Resourcindo - Indonesia
  • Attock Cement Pakistan Limited
  • Videocon Industries ltd - India
  • Surastha Cement
  • McKinsey & Co - India
  • Timah Investasi Mineral - Indoneisa
  • Georgia Ports Authority, United States
  • GB Group - China
  • Indian Energy Exchange, India
  • Jaiprakash Power Ventures ltd
  • Grasim Industreis Ltd - India
  • Kohat Cement Company Ltd. - Pakistan
  • Wilmar Investment Holdings
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Sical Logistics Limited - India
  • Core Mineral Indonesia
  • TGV SRAAC LIMITED, India
  • Energy Link Ltd, New Zealand
  • Baramulti Group, Indonesia
  • Cement Manufacturers Association - India
  • Vedanta Resources Plc - India
  • Coalindo Energy - Indonesia
  • Krishnapatnam Port Company Ltd. - India
  • Economic Council, Georgia
  • Mitsui
  • Maybank - Singapore
  • Orica Mining Services - Indonesia
  • U S Energy Resources
  • HSBC - Hong Kong
  • Formosa Plastics Group - Taiwan
  • J M Baxi & Co - India
  • BRS Brokers - Singapore
  • India Bulls Power Limited - India
  • Lanco Infratech Ltd - India
  • Globalindo Alam Lestari - Indonesia
  • KOWEPO - South Korea
  • SRK Consulting
  • Bahari Cakrawala Sebuku - Indonesia
  • Price Waterhouse Coopers - Russia
  • Carbofer General Trading SA - India
  • Neyveli Lignite Corporation Ltd, - India
  • PetroVietnam Power Coal Import and Supply Company
  • EIA - United States
  • DBS Bank - Singapore
  • World Coal - UK
  • Indian Oil Corporation Limited
  • Ceylon Electricity Board - Sri Lanka
  • Renaissance Capital - South Africa
  • Qatrana Cement - Jordan
  • The State Trading Corporation of India Ltd
  • Eastern Energy - Thailand
  • Bukit Asam (Persero) Tbk - Indonesia
  • GN Power Mariveles Coal Plant, Philippines
  • Uttam Galva Steels Limited - India
  • Thomson Reuters GRC
  • Borneo Indobara - Indonesia
  • Toyota Tsusho Corporation, Japan
  • OPG Power Generation Pvt Ltd - India
  • Asmin Koalindo Tuhup - Indonesia
  • Thriveni
  • Semirara Mining and Power Corporation, Philippines
  • Enel Italy
  • Binh Thuan Hamico - Vietnam
  • Indo Tambangraya Megah - Indonesia
  • Mitsubishi Corporation
  • Independent Power Producers Association of India
  • Bangkok Bank PCL
  • Asia Cement - Taiwan
  • Chamber of Mines of South Africa
  • Barasentosa Lestari - Indonesia
  • Jorong Barutama Greston.PT - Indonesia
  • Platts
  • LBH Netherlands Bv - Netherlands
  • EMO - The Netherlands
  • Salva Resources Pvt Ltd - India
  • Cardiff University - UK
  • Iligan Light & Power Inc, Philippines
  • SMC Global Power, Philippines
  • Metalloyd Limited - United Kingdom
  • Electricity Authority, New Zealand
  • Medco Energi Mining Internasional
  • Marubeni Corporation - India
  • Parry Sugars Refinery, India
  • Maruti Cements - India
  • Sucofindo - Indonesia
  • Maheswari Brothers Coal Limited - India
  • Platou - Singapore
  • TANGEDCO India
  • Lafarge - France
  • Global Green Power PLC Corporation, Philippines
  • BNP Paribas - Singapore
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Indonesian Coal Mining Association
  • Siam City Cement PLC, Thailand
  • Aditya Birla Group - India
  • Peabody Energy - USA
  • Infraline Energy - India
  • International Coal Ventures Pvt Ltd - India
  • Cosco
  • Petrosea - Indonesia
  • GAC Shipping (India) Pvt Ltd
  • PLN - Indonesia
  • TRAFIGURA, South Korea
  • Geoservices-GeoAssay Lab
  • MS Steel International - UAE
  • Tata Power - India
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • SASOL - South Africa
  • Berau Coal - Indonesia
  • Siam City Cement - Thailand
  • Interocean Group of Companies - India
  • Coal Orbis AG
  • Meenaskhi Energy Private Limited - India
  • World Bank
  • KEPCO - South Korea
  • Kapuas Tunggal Persada - Indonesia
  • NTPC Limited - India
  • Semirara Mining Corp, Philippines
  • Ind-Barath Power Infra Limited - India
  • Kobe Steel Ltd - Japan
  • Pipit Mutiara Jaya. PT, Indonesia
  • UBS Singapore
  • Bulk Trading Sa - Switzerland
  • ACC Limited - India
  • Glencore India Pvt. Ltd
  • Tata Chemicals Ltd - India
  • Savvy Resources Ltd - HongKong
  • Sakthi Sugars Limited - India
  • Mercuria Energy - Indonesia
  • Barclays Capital - USA
  • Xstrata Coal
  • Directorate General of MIneral and Coal - Indonesia
  • San Jose City I Power Corp, Philippines
  • Karbindo Abesyapradhi - Indoneisa
  • Bayan Resources Tbk. - Indonesia
  • GVK Power & Infra Limited - India
  • Cemex - Philippines
  • ETA - Dubai
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Merrill Lynch Bank
  • Rio Tinto Coal - Australia
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • AsiaOL BioFuels Corp., Philippines
  • Eastern Coal Council - USA
  • Agrawal Coal Company - India
  • Simpson Spence & Young - Indonesia
  • Leighton Contractors Pty Ltd - Australia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Indika Energy - Indonesia
  • Vale Mozambique
  • Global Business Power Corporation, Philippines
  • McConnell Dowell - Australia
  • Thermax Limited - India
  • Gupta Coal India Ltd
  • Miang Besar Coal Terminal - Indonesia
  • Indogreen Group - Indonesia
  • Goldman Sachs - Singapore
  • Thai Mozambique Logistica
  • Argus Media - Singapore
  • Karaikal Port Pvt Ltd - India
  • Samsung - South Korea
  • SGS (Thailand) Limited
  • Clarksons - UK
  • Merrill Lynch Commodities Europe
  • MEC Coal - Indonesia
  • Australian Coal Association
  • Maharashtra Electricity Regulatory Commission - India
  • PLN Batubara - Indonesia
  • UOB Asia (HK) Ltd
  • Freeport Indonesia
  • Trasteel International SA, Italy
  • ING Bank NV - Singapore
  • Star Paper Mills Limited - India
  • Inspectorate - India
  • Shree Cement - India
  • Sindya Power Generating Company Private Ltd
  • Wood Mackenzie - Singapore
  • Kartika Selabumi Mining - Indonesia
  • London Commodity Brokers - England
  • Straits Asia Resources Limited - Singapore
  • Bharathi Cement Corporation - India
  • Bukit Baiduri Energy - Indonesia
  • Vizag Seaport Private Limited - India
  • Adaro Indonesia
  • Coal and Oil Company - UAE
  • Maersk Broker
  • Coastal Gujarat Power Limited - India
  • APGENCO India
  • Bukit Makmur.PT - Indonesia
  • Noble Europe Ltd - UK
  • Commonwealth Bank - Australia
  • TNB Fuel Sdn Bhd - Malaysia
  • Fearnleys - India
  • Vitol - Bahrain
  • The University of Queensland
  • Pendopo Energi Batubara - Indonesia
  • Thailand Anthracite
  • Pinang Coal Indonesia
  • JPMorgan - India
  • Minerals Council of Australia
  • South Luzon Thermal Energy Corporation
  • IOL Indonesia
  • Ambuja Cements Ltd - India
  • KPCL - India
  • Sree Jayajothi Cements Limited - India
  • Cebu Energy, Philippines
  • Australian Commodity Traders Exchange
  • IMC Shipping - Singapore
  • Ministry of Transport, Egypt
  • IEA Clean Coal Centre - UK
  • Manunggal Multi Energi - Indonesia
  • Therma Luzon, Inc, Philippines
  • Holcim Trading Pte Ltd - Singapore
  • Gujarat Sidhee Cement - India
  • Chettinad Cement Corporation Ltd - India
  • IBC Asia (S) Pte Ltd
  • PetroVietnam
  • Coeclerici Indonesia
  • Jatenergy - Australia
  • Power Finance Corporation Ltd., India
  • globalCOAL - UK
  • NALCO India
  • Dalmia Cement Bharat India
  • Petrochimia International Co. Ltd.- Taiwan
  • WorleyParsons
  • Arch Coal - USA
  • White Energy Company Limited
  • Kumho Petrochemical, South Korea
  • Edison Trading Spa - Italy
  • Intertek Mineral Services - Indonesia
  • Parliament of New Zealand
  • Permata Bank - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • Mechel - Russia
  • Indian School of Mines
  • Britmindo - Indonesia
  • Reliance Power - India
  • Idemitsu - Japan
  • Indonesia Power. PT
  • Electricity Generating Authority of Thailand
  • Makarim & Taira - Indonesia
  • Mitra SK Pvt Ltd - India
  • Ince & co LLP
  • Sojitz Corporation - Japan
  • SUEK AG - Indonesia
  • Standard Chartered Bank - UAE
  • Madhucon Powers Ltd - India
  • Coaltrans Conferences
  • Kobexindo Tractors - Indoneisa
  • Global Coal Blending Company Limited - Australia
  • Samtan Co., Ltd - South Korea
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Central Electricity Authority - India
  • Panama Canal Authority
  • Energy Development Corp, Philippines
  • Cargill India Pvt Ltd
  • European Bulk Services B.V. - Netherlands
  • Moodys - Singapore
  • Credit Suisse - India
  • Kaltim Prima Coal - Indonesia
  • Riau Bara Harum - Indonesia
  • Anglo American - United Kingdom
  • JPower - Japan
  • Bhushan Steel Limited - India
  • GHCL Limited - India
  • Posco Energy - South Korea
  • GNFC Limited - India
  • Central Java Power - Indonesia
  • Heidelberg Cement - Germany
  • CESC Limited - India
  • The India Cements Ltd
  • Total Coal South Africa
  • Kideco Jaya Agung - Indonesia
  • KPMG - USA
  • Humpuss - Indonesia
  • Tamil Nadu electricity Board
  • Mercator Lines Limited - India
  • Bank of America
  • Directorate Of Revenue Intelligence - India
  • Billiton Holdings Pty Ltd - Australia
  • Malabar Cements Ltd - India
  • Rudhra Energy - India
  • bp singapore
  • PTC India Limited - India
  • Ministry of Mines - Canada
  • GMR Energy Limited - India
  • Japan Coal Energy Center
  • Romanian Commodities Exchange
  • Africa Commodities Group - South Africa
  • CIMB Investment Bank - Malaysia
  • Latin American Coal - Colombia
  • Kalimantan Lumbung Energi - Indonesia
  • Jindal Steel & Power Ltd - India
  • CCIC - Indonesia
  • Meralco Power Generation, Philippines
  • Inco-Indonesia
  • Adani Power Ltd - India
  • RBS Sempra - UK
  • Bhoruka Overseas - Indonesia
  • IHS Mccloskey Coal Group - USA
  • Deloitte Consulting - India
  • Vijayanagar Sugar Pvt Ltd - India
  • Tanito Harum - Indonesia
  • Bangladesh Power Developement Board
  • Xindia Steels Limited - India
  • New Zealand Coal & Carbon
  • TNPL - India
  • Thiess Contractors Indonesia
  • Bhatia International Limited - India
  • Altura Mining Limited, Indonesia
  • Larsen & Toubro Limited - India
  • Mintek Dendrill Indonesia
  • ICICI Bank Limited - India
  • Gujarat Electricity Regulatory Commission - India
  • Banpu Public Company Limited - Thailand
  • VISA Power Limited - India
  • Rashtriya Ispat Nigam Limited - India
  • Mjunction Services Limited - India
  • Bank of China, Malaysia
  • Runge Indonesia
  • Russian Coal LLC
  • Essar Steel Hazira Ltd - India