COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Tuesday, 07 July 20
WHAT DOES THE PATHWAY TO A NET-ZERO ECONOMY LOOK LIKE FOR MINERS? - WOOD MACKENZIE
Wind, solar, electric vehicles, stationary storage and transmission are all central to achieving the Paris Agreement decarbonisation goals. &nb ...


Monday, 06 July 20
INDONESIAN COAL PRICE REFERENCE IN FREE FALL
COALspot.com: The Ministry of Energy and Mineral Resources of the Republic of Indonesia has revised down again the benchmark price of Indonesian th ...


Monday, 06 July 20
SUPRAMAX: A 58,000-DWT FIXING DELIVERY VIETNAM TRIP VIA INDONESIA RE-DELIVERY WEST INDIA IN THE LOW $4,000S
Capesize The Capesize market continues to go from strength to strength, as rates reach highs not seen since September last year. The rally is p ...


Thursday, 02 July 20
PRIVATE COAL MINING MAY SEE WEAK INVESTOR SENTIMENT: ICRA - LIVEMINT
The prospects of commercial coal mining in India may be dimmer than initially expected because of the expected shift in India’s energy mix fr ...


Wednesday, 01 July 20
THERMAL COAL OPTIONS TRADING LAUNCHED IN CHINA'S ZHENGZHOU - XINHUA
Thermal coal options started trading on the Zhengzhou Commodity Exchange (ZCE) in central China’s Henan Province Tuesday.   It i ...


   175 176 177 178 179   
Showing 881 to 885 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • EMO - The Netherlands
  • Gujarat Electricity Regulatory Commission - India
  • Alfred C Toepfer International GmbH - Germany
  • NALCO India
  • TGV SRAAC LIMITED, India
  • Larsen & Toubro Limited - India
  • Britmindo - Indonesia
  • Surastha Cement
  • PetroVietnam
  • Carbofer General Trading SA - India
  • Global Business Power Corporation, Philippines
  • NTPC Limited - India
  • AsiaOL BioFuels Corp., Philippines
  • Energy Development Corp, Philippines
  • Bank of America
  • European Bulk Services B.V. - Netherlands
  • EIA - United States
  • Gujarat Sidhee Cement - India
  • Holcim Trading Pte Ltd - Singapore
  • Argus Media - Singapore
  • ETA - Dubai
  • Electricity Authority, New Zealand
  • UOB Asia (HK) Ltd
  • Karaikal Port Pvt Ltd - India
  • BNP Paribas - Singapore
  • GAC Shipping (India) Pvt Ltd
  • Bukit Makmur.PT - Indonesia
  • SRK Consulting
  • Coalindo Energy - Indonesia
  • Bank of China, Malaysia
  • World Coal - UK
  • Arutmin Indonesia
  • PowerSource Philippines DevCo
  • Bayan Resources Tbk. - Indonesia
  • Bhoruka Overseas - Indonesia
  • White Energy Company Limited
  • Bukit Baiduri Energy - Indonesia
  • Essar Steel Hazira Ltd - India
  • Thriveni
  • Kaltim Prima Coal - Indonesia
  • Bangladesh Power Developement Board
  • Noble Europe Ltd - UK
  • MEC Coal - Indonesia
  • Deloitte Consulting - India
  • Cebu Energy, Philippines
  • Tanito Harum - Indonesia
  • Parliament of New Zealand
  • GB Group - China
  • Aboitiz Power Corporation - Philippines
  • GMR Energy Limited - India
  • Clarksons - UK
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Indian Oil Corporation Limited
  • Core Mineral Indonesia
  • APGENCO India
  • Star Paper Mills Limited - India
  • Goldman Sachs - Singapore
  • Malabar Cements Ltd - India
  • Oldendorff Carriers - Singapore
  • Sinarmas Energy and Mining - Indonesia
  • Port Waratah Coal Services - Australia
  • Jatenergy - Australia
  • ANZ Bank - Australia
  • Marubeni Corporation - India
  • Xindia Steels Limited - India
  • Vale Mozambique
  • Inco-Indonesia
  • Panama Canal Authority
  • Global Green Power PLC Corporation, Philippines
  • Moodys - Singapore
  • Siam City Cement - Thailand
  • Thomson Reuters GRC
  • TNB Fuel Sdn Bhd - Malaysia
  • Mitra SK Pvt Ltd - India
  • Altura Mining Limited, Indonesia
  • OPG Power Generation Pvt Ltd - India
  • Vijayanagar Sugar Pvt Ltd - India
  • UBS Singapore
  • Berau Coal - Indonesia
  • Vedanta Resources Plc - India
  • Mercuria Energy - Indonesia
  • Sindya Power Generating Company Private Ltd
  • IHS Mccloskey Coal Group - USA
  • Shree Cement - India
  • TANGEDCO India
  • Coaltrans Conferences
  • Russian Coal LLC
  • globalCOAL - UK
  • Shenhua Group - China
  • Heidelberg Cement - Germany
  • Indian School of Mines
  • KPMG - USA
  • Central Electricity Authority - India
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Orica Mining Services - Indonesia
  • Wood Mackenzie - Singapore
  • Idemitsu - Japan
  • IOL Indonesia
  • Semirara Mining Corp, Philippines
  • Intertek Mineral Services - Indonesia
  • Petrosea - Indonesia
  • Kartika Selabumi Mining - Indonesia
  • Iligan Light & Power Inc, Philippines
  • Krishnapatnam Port Company Ltd. - India
  • ING Bank NV - Singapore
  • Karbindo Abesyapradhi - Indoneisa
  • Sical Logistics Limited - India
  • RBS Sempra - UK
  • GNFC Limited - India
  • Ind-Barath Power Infra Limited - India
  • Ministry of Transport, Egypt
  • Binh Thuan Hamico - Vietnam
  • McKinsey & Co - India
  • Peabody Energy - USA
  • Thermax Limited - India
  • IMC Shipping - Singapore
  • MS Steel International - UAE
  • Coal Orbis AG
  • TeaM Sual Corporation - Philippines
  • Sarangani Energy Corporation, Philippines
  • Makarim & Taira - Indonesia
  • SN Aboitiz Power Inc, Philippines
  • Kepco SPC Power Corporation, Philippines
  • Asian Development Bank
  • KEPCO - South Korea
  • ACC Limited - India
  • Glencore India Pvt. Ltd
  • Anglo American - United Kingdom
  • VISA Power Limited - India
  • PLN - Indonesia
  • Australian Coal Association
  • SMC Global Power, Philippines
  • CESC Limited - India
  • CNBM International Corporation - China
  • Platou - Singapore
  • BRS Brokers - Singapore
  • Videocon Industries ltd - India
  • Meenaskhi Energy Private Limited - India
  • Freeport Indonesia
  • Edison Trading Spa - Italy
  • Mintek Dendrill Indonesia
  • Electricity Generating Authority of Thailand
  • Trasteel International SA, Italy
  • IEA Clean Coal Centre - UK
  • PetroVietnam Power Coal Import and Supply Company
  • Price Waterhouse Coopers - Russia
  • Billiton Holdings Pty Ltd - Australia
  • Thiess Contractors Indonesia
  • Xstrata Coal
  • Straits Asia Resources Limited - Singapore
  • TRAFIGURA, South Korea
  • PNOC Exploration Corporation - Philippines
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Leighton Contractors Pty Ltd - Australia
  • Global Coal Blending Company Limited - Australia
  • Ernst & Young Pvt. Ltd.
  • bp singapore
  • Qatrana Cement - Jordan
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Gujarat Mineral Development Corp Ltd - India
  • Platts
  • Mitsubishi Corporation
  • Infraline Energy - India
  • Asia Cement - Taiwan
  • Latin American Coal - Colombia
  • Renaissance Capital - South Africa
  • The State Trading Corporation of India Ltd
  • SMG Consultants - Indonesia
  • Baramulti Group, Indonesia
  • Ministry of Mines - Canada
  • LBH Netherlands Bv - Netherlands
  • Geoservices-GeoAssay Lab
  • Cigading International Bulk Terminal - Indonesia
  • Planning Commission, India
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Bhatia International Limited - India
  • Banpu Public Company Limited - Thailand
  • Meralco Power Generation, Philippines
  • Aditya Birla Group - India
  • J M Baxi & Co - India
  • Cosco
  • Rudhra Energy - India
  • Kobexindo Tractors - Indoneisa
  • Commonwealth Bank - Australia
  • Bangkok Bank PCL
  • Cargill India Pvt Ltd
  • Jorong Barutama Greston.PT - Indonesia
  • Interocean Group of Companies - India
  • Siam City Cement PLC, Thailand
  • Uttam Galva Steels Limited - India
  • Arch Coal - USA
  • McConnell Dowell - Australia
  • HSBC - Hong Kong
  • Mitsui
  • Ministry of Finance - Indonesia
  • Agrawal Coal Company - India
  • Kobe Steel Ltd - Japan
  • Orica Australia Pty. Ltd.
  • The Treasury - Australian Government
  • Coastal Gujarat Power Limited - India
  • Posco Energy - South Korea
  • Kalimantan Lumbung Energi - Indonesia
  • Rio Tinto Coal - Australia
  • Economic Council, Georgia
  • Fearnleys - India
  • Gresik Semen - Indonesia
  • Mjunction Services Limited - India
  • DBS Bank - Singapore
  • Semirara Mining and Power Corporation, Philippines
  • GHCL Limited - India
  • Indonesian Coal Mining Association
  • Jindal Steel & Power Ltd - India
  • PTC India Limited - India
  • Africa Commodities Group - South Africa
  • KPCL - India
  • Thailand Anthracite
  • Asmin Koalindo Tuhup - Indonesia
  • KOWEPO - South Korea
  • Vizag Seaport Private Limited - India
  • Coal and Oil Company - UAE
  • Sakthi Sugars Limited - India
  • Barclays Capital - USA
  • The India Cements Ltd
  • Energy Link Ltd, New Zealand
  • SGS (Thailand) Limited
  • Deutsche Bank - India
  • Formosa Plastics Group - Taiwan
  • Maersk Broker
  • Adaro Indonesia
  • Cemex - Philippines
  • Pinang Coal Indonesia
  • Power Finance Corporation Ltd., India
  • Kapuas Tunggal Persada - Indonesia
  • SASOL - South Africa
  • Minerals Council of Australia
  • Directorate Of Revenue Intelligence - India
  • Central Java Power - Indonesia
  • Malco - India
  • The University of Queensland
  • Indo Tambangraya Megah - Indonesia
  • Humpuss - Indonesia
  • Pendopo Energi Batubara - Indonesia
  • Timah Investasi Mineral - Indoneisa
  • Wilmar Investment Holdings
  • ICICI Bank Limited - India
  • International Coal Ventures Pvt Ltd - India
  • Cement Manufacturers Association - India
  • Borneo Indobara - Indonesia
  • Thai Mozambique Logistica
  • Barasentosa Lestari - Indonesia
  • Mercator Lines Limited - India
  • CIMB Investment Bank - Malaysia
  • Standard Chartered Bank - UAE
  • Tata Power - India
  • JPower - Japan
  • Lafarge - France
  • Indogreen Group - Indonesia
  • Australian Commodity Traders Exchange
  • Chamber of Mines of South Africa
  • Indorama - Singapore
  • IBC Asia (S) Pte Ltd
  • Globalindo Alam Lestari - Indonesia
  • Tata Chemicals Ltd - India
  • Permata Bank - Indonesia
  • Grasim Industreis Ltd - India
  • Pipit Mutiara Jaya. PT, Indonesia
  • Georgia Ports Authority, United States
  • Jaiprakash Power Ventures ltd
  • Independent Power Producers Association of India
  • Ceylon Electricity Board - Sri Lanka
  • CCIC - Indonesia
  • Medco Energi Mining Internasional
  • Gupta Coal India Ltd
  • London Commodity Brokers - England
  • Riau Bara Harum - Indonesia
  • New Zealand Coal & Carbon
  • U S Energy Resources
  • India Bulls Power Limited - India
  • Maybank - Singapore
  • Metalloyd Limited - United Kingdom
  • Toyota Tsusho Corporation, Japan
  • Rashtriya Ispat Nigam Limited - India
  • Parry Sugars Refinery, India
  • Bharathi Cement Corporation - India
  • Romanian Commodities Exchange
  • Petron Corporation, Philippines
  • GN Power Mariveles Coal Plant, Philippines
  • Sojitz Corporation - Japan
  • OCBC - Singapore
  • Japan Coal Energy Center
  • Lanco Infratech Ltd - India
  • Savvy Resources Ltd - HongKong
  • Tamil Nadu electricity Board
  • Mechel - Russia
  • Indian Energy Exchange, India
  • Kohat Cement Company Ltd. - Pakistan
  • Sucofindo - Indonesia
  • Bulk Trading Sa - Switzerland
  • Bukit Asam (Persero) Tbk - Indonesia
  • Indika Energy - Indonesia
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Bhushan Steel Limited - India
  • Eastern Energy - Thailand
  • Coeclerici Indonesia
  • Maheswari Brothers Coal Limited - India
  • Simpson Spence & Young - Indonesia
  • Reliance Power - India
  • San Jose City I Power Corp, Philippines
  • Credit Suisse - India
  • Directorate General of MIneral and Coal - Indonesia
  • Vitol - Bahrain
  • Kideco Jaya Agung - Indonesia
  • GVK Power & Infra Limited - India
  • Neyveli Lignite Corporation Ltd, - India
  • Samtan Co., Ltd - South Korea
  • TNPL - India
  • Maruti Cements - India
  • Runge Indonesia
  • Total Coal South Africa
  • Merrill Lynch Commodities Europe
  • Miang Besar Coal Terminal - Indonesia
  • Petrochimia International Co. Ltd.- Taiwan
  • ASAPP Information Group - India
  • Therma Luzon, Inc, Philippines
  • Adani Power Ltd - India
  • Attock Cement Pakistan Limited
  • South Luzon Thermal Energy Corporation
  • Salva Resources Pvt Ltd - India
  • SUEK AG - Indonesia
  • Inspectorate - India
  • Chettinad Cement Corporation Ltd - India
  • Maharashtra Electricity Regulatory Commission - India
  • Samsung - South Korea
  • Enel Italy
  • Indonesia Power. PT
  • Merrill Lynch Bank
  • Cardiff University - UK
  • Bahari Cakrawala Sebuku - Indonesia
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • CoalTek, United States
  • Madhucon Powers Ltd - India
  • Sree Jayajothi Cements Limited - India
  • Eastern Coal Council - USA
  • Singapore Mercantile Exchange
  • PLN Batubara - Indonesia
  • Antam Resourcindo - Indonesia
  • Ambuja Cements Ltd - India
  • World Bank
  • Kumho Petrochemical, South Korea
  • Ince & co LLP
  • Manunggal Multi Energi - Indonesia
  • Coal India Limited
  • JPMorgan - India
  • Dalmia Cement Bharat India
  • WorleyParsons