COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Friday, 10 July 20
CHINA'S BENCHMARK POWER COAL PRICE EDGES UP - XINHUA
China’s benchmark power coal price rose slightly during the past week.   The Bohai-Rim Steam-Coal Price Index (BSPI), a gauge of ...


Friday, 10 July 20
GLOBAL SHIPPING EARNINGS FORECAST CUT AS SUPPLY SET TO OUTSTRIP DEMAND - MOODY'S
EBITDA forecast worsens, keeping outlook negative. We now expect the aggregate EBITDA of rated shipping companies to fall by around 16%-18% in 2020 ...


Friday, 10 July 20
SLOW RECOVERY IN TANKER RATES TO WEIGH ON BUANA LINTAS LAUTAN - FITCH RATINGS
Fitch Ratings believes that international tanker rates are likely improve after their sharp fall since May 2020, albeit at a slow pace. The weaknes ...


Wednesday, 08 July 20
MARKET INSIGHT - INTERMODAL
During the previous month, the dry bulk market witnessed an impressive increase in the BDI index that has reached 1800 points from 500 with a clear ...


Tuesday, 07 July 20
COAL INDIA WORKERS STRIKE CUTS OUTPUT BY 56%: OFFICIAL - REUTERS
A strike at Coal India Ltd cut production by 56% in the three days ending July 4 as workers oppose opening up coal mining to the private sector, a ...


   174 175 176 177 178   
Showing 876 to 880 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • JPower - Japan
  • PetroVietnam Power Coal Import and Supply Company
  • Sojitz Corporation - Japan
  • Eastern Coal Council - USA
  • Runge Indonesia
  • Sucofindo - Indonesia
  • Grasim Industreis Ltd - India
  • Orica Mining Services - Indonesia
  • ICICI Bank Limited - India
  • PetroVietnam
  • Goldman Sachs - Singapore
  • Gujarat Mineral Development Corp Ltd - India
  • Platou - Singapore
  • Semirara Mining and Power Corporation, Philippines
  • Bhushan Steel Limited - India
  • Timah Investasi Mineral - Indoneisa
  • Thomson Reuters GRC
  • GN Power Mariveles Coal Plant, Philippines
  • Parry Sugars Refinery, India
  • ANZ Bank - Australia
  • Jatenergy - Australia
  • Commonwealth Bank - Australia
  • Infraline Energy - India
  • Maharashtra Electricity Regulatory Commission - India
  • Bangladesh Power Developement Board
  • Romanian Commodities Exchange
  • Indonesia Power. PT
  • Inco-Indonesia
  • Gujarat Sidhee Cement - India
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Marubeni Corporation - India
  • NTPC Limited - India
  • SN Aboitiz Power Inc, Philippines
  • Rudhra Energy - India
  • Maersk Broker
  • Gresik Semen - Indonesia
  • Vijayanagar Sugar Pvt Ltd - India
  • Bangkok Bank PCL
  • Binh Thuan Hamico - Vietnam
  • globalCOAL - UK
  • PLN Batubara - Indonesia
  • IEA Clean Coal Centre - UK
  • Trasteel International SA, Italy
  • South Luzon Thermal Energy Corporation
  • Moodys - Singapore
  • Petrosea - Indonesia
  • The India Cements Ltd
  • Karaikal Port Pvt Ltd - India
  • Bhoruka Overseas - Indonesia
  • Russian Coal LLC
  • Anglo American - United Kingdom
  • Aboitiz Power Corporation - Philippines
  • Britmindo - Indonesia
  • Videocon Industries ltd - India
  • Planning Commission, India
  • LBH Netherlands Bv - Netherlands
  • Clarksons - UK
  • Maheswari Brothers Coal Limited - India
  • Tanito Harum - Indonesia
  • Savvy Resources Ltd - HongKong
  • Larsen & Toubro Limited - India
  • Siam City Cement PLC, Thailand
  • GMR Energy Limited - India
  • GHCL Limited - India
  • Jaiprakash Power Ventures ltd
  • VISA Power Limited - India
  • Panama Canal Authority
  • Kalimantan Lumbung Energi - Indonesia
  • Australian Coal Association
  • Xstrata Coal
  • Price Waterhouse Coopers - Russia
  • Samsung - South Korea
  • The University of Queensland
  • ACC Limited - India
  • Indonesian Coal Mining Association
  • KPCL - India
  • Madhucon Powers Ltd - India
  • Freeport Indonesia
  • KEPCO - South Korea
  • Thriveni
  • Maybank - Singapore
  • IOL Indonesia
  • PTC India Limited - India
  • Economic Council, Georgia
  • Ministry of Mines - Canada
  • JPMorgan - India
  • Global Green Power PLC Corporation, Philippines
  • Thermax Limited - India
  • Port Waratah Coal Services - Australia
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Kobexindo Tractors - Indoneisa
  • Latin American Coal - Colombia
  • Therma Luzon, Inc, Philippines
  • Gupta Coal India Ltd
  • Kobe Steel Ltd - Japan
  • Mercator Lines Limited - India
  • Electricity Generating Authority of Thailand
  • SMG Consultants - Indonesia
  • Sinarmas Energy and Mining - Indonesia
  • Bukit Asam (Persero) Tbk - Indonesia
  • Karbindo Abesyapradhi - Indoneisa
  • Indian Energy Exchange, India
  • Leighton Contractors Pty Ltd - Australia
  • The State Trading Corporation of India Ltd
  • TANGEDCO India
  • Deutsche Bank - India
  • Maruti Cements - India
  • UBS Singapore
  • DBS Bank - Singapore
  • Sarangani Energy Corporation, Philippines
  • bp singapore
  • KPMG - USA
  • Samtan Co., Ltd - South Korea
  • NALCO India
  • European Bulk Services B.V. - Netherlands
  • Formosa Plastics Group - Taiwan
  • Independent Power Producers Association of India
  • J M Baxi & Co - India
  • Directorate Of Revenue Intelligence - India
  • Manunggal Multi Energi - Indonesia
  • SRK Consulting
  • Ministry of Transport, Egypt
  • White Energy Company Limited
  • Mercuria Energy - Indonesia
  • Eastern Energy - Thailand
  • CCIC - Indonesia
  • Adani Power Ltd - India
  • ASAPP Information Group - India
  • Jorong Barutama Greston.PT - Indonesia
  • Argus Media - Singapore
  • McConnell Dowell - Australia
  • Essar Steel Hazira Ltd - India
  • Siam City Cement - Thailand
  • Pendopo Energi Batubara - Indonesia
  • Cardiff University - UK
  • Ceylon Electricity Board - Sri Lanka
  • Shenhua Group - China
  • Coastal Gujarat Power Limited - India
  • Antam Resourcindo - Indonesia
  • Australian Commodity Traders Exchange
  • Energy Development Corp, Philippines
  • Indorama - Singapore
  • Metalloyd Limited - United Kingdom
  • Ind-Barath Power Infra Limited - India
  • Standard Chartered Bank - UAE
  • Baramulti Group, Indonesia
  • Xindia Steels Limited - India
  • Vizag Seaport Private Limited - India
  • McKinsey & Co - India
  • Simpson Spence & Young - Indonesia
  • GB Group - China
  • Meralco Power Generation, Philippines
  • Tata Power - India
  • Credit Suisse - India
  • Kaltim Prima Coal - Indonesia
  • MS Steel International - UAE
  • Alfred C Toepfer International GmbH - Germany
  • World Coal - UK
  • International Coal Ventures Pvt Ltd - India
  • Merrill Lynch Bank
  • Deloitte Consulting - India
  • New Zealand Coal & Carbon
  • Inspectorate - India
  • Sakthi Sugars Limited - India
  • HSBC - Hong Kong
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Coalindo Energy - Indonesia
  • Asian Development Bank
  • Total Coal South Africa
  • Pipit Mutiara Jaya. PT, Indonesia
  • Coeclerici Indonesia
  • TNPL - India
  • Indika Energy - Indonesia
  • APGENCO India
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Tata Chemicals Ltd - India
  • Asmin Koalindo Tuhup - Indonesia
  • Mechel - Russia
  • AsiaOL BioFuels Corp., Philippines
  • Georgia Ports Authority, United States
  • SUEK AG - Indonesia
  • Reliance Power - India
  • Bank of China, Malaysia
  • Makarim & Taira - Indonesia
  • Aditya Birla Group - India
  • Kapuas Tunggal Persada - Indonesia
  • Kumho Petrochemical, South Korea
  • World Bank
  • Thailand Anthracite
  • Fearnleys - India
  • PowerSource Philippines DevCo
  • Indo Tambangraya Megah - Indonesia
  • TeaM Sual Corporation - Philippines
  • Arutmin Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • Power Finance Corporation Ltd., India
  • Vedanta Resources Plc - India
  • Neyveli Lignite Corporation Ltd, - India
  • Thai Mozambique Logistica
  • Platts
  • Sree Jayajothi Cements Limited - India
  • Ince & co LLP
  • Energy Link Ltd, New Zealand
  • Petron Corporation, Philippines
  • Gujarat Electricity Regulatory Commission - India
  • San Jose City I Power Corp, Philippines
  • Coaltrans Conferences
  • Kepco SPC Power Corporation, Philippines
  • Bank of America
  • Edison Trading Spa - Italy
  • Miang Besar Coal Terminal - Indonesia
  • UOB Asia (HK) Ltd
  • Meenaskhi Energy Private Limited - India
  • SMC Global Power, Philippines
  • Vale Mozambique
  • Cemex - Philippines
  • Berau Coal - Indonesia
  • Parliament of New Zealand
  • Global Coal Blending Company Limited - Australia
  • Barclays Capital - USA
  • CoalTek, United States
  • EIA - United States
  • Bahari Cakrawala Sebuku - Indonesia
  • Medco Energi Mining Internasional
  • Humpuss - Indonesia
  • Shree Cement - India
  • EMO - The Netherlands
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Asia Cement - Taiwan
  • Africa Commodities Group - South Africa
  • Tamil Nadu electricity Board
  • Coal and Oil Company - UAE
  • Ministry of Finance - Indonesia
  • PNOC Exploration Corporation - Philippines
  • Mintek Dendrill Indonesia
  • Ambuja Cements Ltd - India
  • Dalmia Cement Bharat India
  • CIMB Investment Bank - Malaysia
  • PLN - Indonesia
  • Semirara Mining Corp, Philippines
  • TGV SRAAC LIMITED, India
  • Cargill India Pvt Ltd
  • Coal India Limited
  • Renaissance Capital - South Africa
  • Coal Orbis AG
  • IMC Shipping - Singapore
  • Posco Energy - South Korea
  • Singapore Mercantile Exchange
  • Cigading International Bulk Terminal - Indonesia
  • Oldendorff Carriers - Singapore
  • Indian School of Mines
  • Barasentosa Lestari - Indonesia
  • Globalindo Alam Lestari - Indonesia
  • Agrawal Coal Company - India
  • GNFC Limited - India
  • Kohat Cement Company Ltd. - Pakistan
  • Interocean Group of Companies - India
  • RBS Sempra - UK
  • Bharathi Cement Corporation - India
  • Lafarge - France
  • Bayan Resources Tbk. - Indonesia
  • Cebu Energy, Philippines
  • Iligan Light & Power Inc, Philippines
  • Attock Cement Pakistan Limited
  • BRS Brokers - Singapore
  • Permata Bank - Indonesia
  • Indian Oil Corporation Limited
  • Cosco
  • Thiess Contractors Indonesia
  • Vitol - Bahrain
  • Altura Mining Limited, Indonesia
  • Malco - India
  • Mitra SK Pvt Ltd - India
  • Billiton Holdings Pty Ltd - Australia
  • London Commodity Brokers - England
  • Central Electricity Authority - India
  • Surastha Cement
  • IBC Asia (S) Pte Ltd
  • Bukit Makmur.PT - Indonesia
  • OCBC - Singapore
  • Kartika Selabumi Mining - Indonesia
  • BNP Paribas - Singapore
  • Uttam Galva Steels Limited - India
  • Rio Tinto Coal - Australia
  • Chamber of Mines of South Africa
  • Enel Italy
  • Directorate General of MIneral and Coal - Indonesia
  • Jindal Steel & Power Ltd - India
  • Star Paper Mills Limited - India
  • Ernst & Young Pvt. Ltd.
  • Geoservices-GeoAssay Lab
  • Minerals Council of Australia
  • Idemitsu - Japan
  • CNBM International Corporation - China
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Borneo Indobara - Indonesia
  • Holcim Trading Pte Ltd - Singapore
  • Malabar Cements Ltd - India
  • WorleyParsons
  • Salva Resources Pvt Ltd - India
  • Mjunction Services Limited - India
  • Qatrana Cement - Jordan
  • KOWEPO - South Korea
  • ING Bank NV - Singapore
  • Bhatia International Limited - India
  • Noble Europe Ltd - UK
  • ETA - Dubai
  • Lanco Infratech Ltd - India
  • Petrochimia International Co. Ltd.- Taiwan
  • Toyota Tsusho Corporation, Japan
  • Intertek Mineral Services - Indonesia
  • Sical Logistics Limited - India
  • Straits Asia Resources Limited - Singapore
  • Adaro Indonesia
  • Cement Manufacturers Association - India
  • Carbofer General Trading SA - India
  • GVK Power & Infra Limited - India
  • SGS (Thailand) Limited
  • Banpu Public Company Limited - Thailand
  • Electricity Authority, New Zealand
  • Chettinad Cement Corporation Ltd - India
  • Merrill Lynch Commodities Europe
  • TNB Fuel Sdn Bhd - Malaysia
  • TRAFIGURA, South Korea
  • U S Energy Resources
  • Krishnapatnam Port Company Ltd. - India
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • MEC Coal - Indonesia
  • Global Business Power Corporation, Philippines
  • Bukit Baiduri Energy - Indonesia
  • Bulk Trading Sa - Switzerland
  • Kideco Jaya Agung - Indonesia
  • Central Java Power - Indonesia
  • Japan Coal Energy Center
  • Heidelberg Cement - Germany
  • Peabody Energy - USA
  • The Treasury - Australian Government
  • CESC Limited - India
  • Wood Mackenzie - Singapore
  • Mitsui
  • Glencore India Pvt. Ltd
  • Riau Bara Harum - Indonesia
  • India Bulls Power Limited - India
  • SASOL - South Africa
  • Core Mineral Indonesia
  • IHS Mccloskey Coal Group - USA
  • Sindya Power Generating Company Private Ltd
  • Indogreen Group - Indonesia
  • Wilmar Investment Holdings
  • Pinang Coal Indonesia
  • Arch Coal - USA
  • GAC Shipping (India) Pvt Ltd
  • Orica Australia Pty. Ltd.
  • Mitsubishi Corporation
  • OPG Power Generation Pvt Ltd - India