COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Wednesday, 24 June 20
MARKET INSIGHT - INTERMODAL
The World Bank estimates that the global economy will fall by 5.2% this year, underlining that the Covid-19 pandemic has had rapid and massive cons ...


Tuesday, 23 June 20
COVID-19 COULD CAUSE A BOOM IN COAL POWER - RYSTAD ENERGY | OILPRICE
COVID-19 has not only impacted the energy industry’s revenues but also its infrastructure development. The delay of new natural gas ...


Tuesday, 23 June 20
CHINA'S COAL OUTPUT UP 0.9 PCT IN JANUARY-MAY: XINHUA
Output of raw coal in China rose 0.9 percent year on year to 1.47 billion tonnes in the first five months of this year, official data showed. & ...


Monday, 22 June 20
KAMSARMAX TYPES REGULARLY HIT THE $9,000 PER DAY LEVEL FOR INDONESIAN COAL RUN TO CHINA, BALTIC BRIEFING SAYS
Capesize The Capesize market trajectory this week has been one of the steepest rallies the sector has experienced. Opening at $12,410, the sect ...


Saturday, 20 June 20
WORLD OIL DEMAND IS PROJECTED TO DECREASE BY 9.1 MB/D IN 2020 - OPEC
Crude Oil Price Movements Spot crude oil prices rebounded in May from low levels registered a month earlier, as physical market fundamentals im ...


   178 179 180 181 182   
Showing 896 to 900 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • GN Power Mariveles Coal Plant, Philippines
  • Fearnleys - India
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Eastern Coal Council - USA
  • KPCL - India
  • Maharashtra Electricity Regulatory Commission - India
  • Coal India Limited
  • Kobe Steel Ltd - Japan
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Deutsche Bank - India
  • TNPL - India
  • ACC Limited - India
  • Malabar Cements Ltd - India
  • European Bulk Services B.V. - Netherlands
  • Ince & co LLP
  • PTC India Limited - India
  • Minerals Council of Australia
  • GNFC Limited - India
  • Merrill Lynch Commodities Europe
  • Borneo Indobara - Indonesia
  • Mjunction Services Limited - India
  • Indogreen Group - Indonesia
  • Tata Power - India
  • Siam City Cement - Thailand
  • Planning Commission, India
  • J M Baxi & Co - India
  • Pipit Mutiara Jaya. PT, Indonesia
  • Riau Bara Harum - Indonesia
  • Romanian Commodities Exchange
  • Platou - Singapore
  • U S Energy Resources
  • Jorong Barutama Greston.PT - Indonesia
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Coalindo Energy - Indonesia
  • Adani Power Ltd - India
  • Energy Link Ltd, New Zealand
  • ING Bank NV - Singapore
  • Bahari Cakrawala Sebuku - Indonesia
  • Energy Development Corp, Philippines
  • IHS Mccloskey Coal Group - USA
  • Platts
  • Credit Suisse - India
  • Geoservices-GeoAssay Lab
  • CCIC - Indonesia
  • Agrawal Coal Company - India
  • Ministry of Finance - Indonesia
  • Sakthi Sugars Limited - India
  • Parliament of New Zealand
  • ETA - Dubai
  • SASOL - South Africa
  • SRK Consulting
  • White Energy Company Limited
  • Bukit Asam (Persero) Tbk - Indonesia
  • Karbindo Abesyapradhi - Indoneisa
  • CoalTek, United States
  • Heidelberg Cement - Germany
  • LBH Netherlands Bv - Netherlands
  • Central Java Power - Indonesia
  • TANGEDCO India
  • Malco - India
  • Power Finance Corporation Ltd., India
  • Intertek Mineral Services - Indonesia
  • Japan Coal Energy Center
  • BNP Paribas - Singapore
  • SGS (Thailand) Limited
  • Larsen & Toubro Limited - India
  • Coeclerici Indonesia
  • Electricity Generating Authority of Thailand
  • Dalmia Cement Bharat India
  • Global Coal Blending Company Limited - Australia
  • Tanito Harum - Indonesia
  • Leighton Contractors Pty Ltd - Australia
  • Sinarmas Energy and Mining - Indonesia
  • GAC Shipping (India) Pvt Ltd
  • Jaiprakash Power Ventures ltd
  • PNOC Exploration Corporation - Philippines
  • Krishnapatnam Port Company Ltd. - India
  • Total Coal South Africa
  • Latin American Coal - Colombia
  • Price Waterhouse Coopers - Russia
  • Miang Besar Coal Terminal - Indonesia
  • Kapuas Tunggal Persada - Indonesia
  • Vitol - Bahrain
  • Indonesia Power. PT
  • Timah Investasi Mineral - Indoneisa
  • KPMG - USA
  • RBS Sempra - UK
  • HSBC - Hong Kong
  • Carbofer General Trading SA - India
  • Inco-Indonesia
  • Cigading International Bulk Terminal - Indonesia
  • Xstrata Coal
  • OPG Power Generation Pvt Ltd - India
  • Rashtriya Ispat Nigam Limited - India
  • APGENCO India
  • The Treasury - Australian Government
  • IEA Clean Coal Centre - UK
  • Lanco Infratech Ltd - India
  • SMC Global Power, Philippines
  • AsiaOL BioFuels Corp., Philippines
  • Commonwealth Bank - Australia
  • Gresik Semen - Indonesia
  • Georgia Ports Authority, United States
  • TGV SRAAC LIMITED, India
  • Bank of China, Malaysia
  • Inspectorate - India
  • Salva Resources Pvt Ltd - India
  • South Luzon Thermal Energy Corporation
  • Panama Canal Authority
  • The University of Queensland
  • World Coal - UK
  • MS Steel International - UAE
  • Renaissance Capital - South Africa
  • The State Trading Corporation of India Ltd
  • Sindya Power Generating Company Private Ltd
  • Australian Coal Association
  • CNBM International Corporation - China
  • Indian Oil Corporation Limited
  • Oldendorff Carriers - Singapore
  • Britmindo - Indonesia
  • Makarim & Taira - Indonesia
  • CIMB Investment Bank - Malaysia
  • Maersk Broker
  • Wilmar Investment Holdings
  • Baramulti Group, Indonesia
  • Ministry of Transport, Egypt
  • New Zealand Coal & Carbon
  • Orica Australia Pty. Ltd.
  • VISA Power Limited - India
  • Semirara Mining Corp, Philippines
  • Sucofindo - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • Deloitte Consulting - India
  • Globalindo Alam Lestari - Indonesia
  • Arutmin Indonesia
  • GHCL Limited - India
  • GVK Power & Infra Limited - India
  • Therma Luzon, Inc, Philippines
  • Karaikal Port Pvt Ltd - India
  • Infraline Energy - India
  • Essar Steel Hazira Ltd - India
  • Port Waratah Coal Services - Australia
  • UOB Asia (HK) Ltd
  • Electricity Authority, New Zealand
  • Attock Cement Pakistan Limited
  • Cebu Energy, Philippines
  • Lafarge - France
  • International Coal Ventures Pvt Ltd - India
  • ANZ Bank - Australia
  • Madhucon Powers Ltd - India
  • PowerSource Philippines DevCo
  • Pendopo Energi Batubara - Indonesia
  • Glencore India Pvt. Ltd
  • Medco Energi Mining Internasional
  • World Bank
  • GMR Energy Limited - India
  • Binh Thuan Hamico - Vietnam
  • Mitsubishi Corporation
  • Moodys - Singapore
  • Thriveni
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Thiess Contractors Indonesia
  • Meenaskhi Energy Private Limited - India
  • Anglo American - United Kingdom
  • Metalloyd Limited - United Kingdom
  • Wood Mackenzie - Singapore
  • Rio Tinto Coal - Australia
  • OCBC - Singapore
  • EIA - United States
  • Surastha Cement
  • Russian Coal LLC
  • ICICI Bank Limited - India
  • MEC Coal - Indonesia
  • KEPCO - South Korea
  • Samsung - South Korea
  • Maruti Cements - India
  • Cement Manufacturers Association - India
  • Coaltrans Conferences
  • IBC Asia (S) Pte Ltd
  • Reliance Power - India
  • SMG Consultants - Indonesia
  • Cosco
  • Samtan Co., Ltd - South Korea
  • EMO - The Netherlands
  • Interocean Group of Companies - India
  • Barasentosa Lestari - Indonesia
  • McKinsey & Co - India
  • Grasim Industreis Ltd - India
  • Vijayanagar Sugar Pvt Ltd - India
  • Shree Cement - India
  • Bulk Trading Sa - Switzerland
  • Kideco Jaya Agung - Indonesia
  • Sree Jayajothi Cements Limited - India
  • Mitra SK Pvt Ltd - India
  • JPMorgan - India
  • Simpson Spence & Young - Indonesia
  • Petron Corporation, Philippines
  • Siam City Cement PLC, Thailand
  • Kumho Petrochemical, South Korea
  • Petrosea - Indonesia
  • Pinang Coal Indonesia
  • Independent Power Producers Association of India
  • Parry Sugars Refinery, India
  • Vedanta Resources Plc - India
  • DBS Bank - Singapore
  • London Commodity Brokers - England
  • Indorama - Singapore
  • KOWEPO - South Korea
  • Gujarat Electricity Regulatory Commission - India
  • Iligan Light & Power Inc, Philippines
  • Kaltim Prima Coal - Indonesia
  • GB Group - China
  • Cardiff University - UK
  • Videocon Industries ltd - India
  • Ernst & Young Pvt. Ltd.
  • Shenhua Group - China
  • Antam Resourcindo - Indonesia
  • Thermax Limited - India
  • Gujarat Sidhee Cement - India
  • Standard Chartered Bank - UAE
  • Cemex - Philippines
  • Mintek Dendrill Indonesia
  • Mercator Lines Limited - India
  • Humpuss - Indonesia
  • Kartika Selabumi Mining - Indonesia
  • SUEK AG - Indonesia
  • Runge Indonesia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Gupta Coal India Ltd
  • BRS Brokers - Singapore
  • NALCO India
  • Cargill India Pvt Ltd
  • Orica Mining Services - Indonesia
  • Central Electricity Authority - India
  • Tamil Nadu electricity Board
  • Jindal Steel & Power Ltd - India
  • Asmin Koalindo Tuhup - Indonesia
  • Jatenergy - Australia
  • Xindia Steels Limited - India
  • TeaM Sual Corporation - Philippines
  • Straits Asia Resources Limited - Singapore
  • Bayan Resources Tbk. - Indonesia
  • ASAPP Information Group - India
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Permata Bank - Indonesia
  • Barclays Capital - USA
  • Kepco SPC Power Corporation, Philippines
  • IOL Indonesia
  • Star Paper Mills Limited - India
  • Petrochimia International Co. Ltd.- Taiwan
  • Aboitiz Power Corporation - Philippines
  • SN Aboitiz Power Inc, Philippines
  • Sical Logistics Limited - India
  • Bharathi Cement Corporation - India
  • Ambuja Cements Ltd - India
  • Coal Orbis AG
  • Mechel - Russia
  • bp singapore
  • Uttam Galva Steels Limited - India
  • Neyveli Lignite Corporation Ltd, - India
  • Bank of America
  • San Jose City I Power Corp, Philippines
  • Kobexindo Tractors - Indoneisa
  • Bukit Makmur.PT - Indonesia
  • Thai Mozambique Logistica
  • PetroVietnam
  • globalCOAL - UK
  • Indika Energy - Indonesia
  • Noble Europe Ltd - UK
  • Bukit Baiduri Energy - Indonesia
  • Manunggal Multi Energi - Indonesia
  • Indian Energy Exchange, India
  • Core Mineral Indonesia
  • Ministry of Mines - Canada
  • TRAFIGURA, South Korea
  • Ceylon Electricity Board - Sri Lanka
  • Economic Council, Georgia
  • Sojitz Corporation - Japan
  • Freeport Indonesia
  • Bhatia International Limited - India
  • Bangkok Bank PCL
  • Maybank - Singapore
  • Adaro Indonesia
  • Singapore Mercantile Exchange
  • IMC Shipping - Singapore
  • Gujarat Mineral Development Corp Ltd - India
  • Ind-Barath Power Infra Limited - India
  • Toyota Tsusho Corporation, Japan
  • Australian Commodity Traders Exchange
  • Argus Media - Singapore
  • Global Green Power PLC Corporation, Philippines
  • Clarksons - UK
  • Indo Tambangraya Megah - Indonesia
  • Maheswari Brothers Coal Limited - India
  • Thailand Anthracite
  • Vizag Seaport Private Limited - India
  • Asian Development Bank
  • Holcim Trading Pte Ltd - Singapore
  • PLN Batubara - Indonesia
  • Bangladesh Power Developement Board
  • India Bulls Power Limited - India
  • The India Cements Ltd
  • PetroVietnam Power Coal Import and Supply Company
  • Merrill Lynch Bank
  • Bhoruka Overseas - Indonesia
  • Trasteel International SA, Italy
  • Aditya Birla Group - India
  • UBS Singapore
  • Thomson Reuters GRC
  • CESC Limited - India
  • Coastal Gujarat Power Limited - India
  • Idemitsu - Japan
  • Indian School of Mines
  • Marubeni Corporation - India
  • Enel Italy
  • Meralco Power Generation, Philippines
  • Qatrana Cement - Jordan
  • PLN - Indonesia
  • Edison Trading Spa - Italy
  • Arch Coal - USA
  • Directorate Of Revenue Intelligence - India
  • Global Business Power Corporation, Philippines
  • Goldman Sachs - Singapore
  • Billiton Holdings Pty Ltd - Australia
  • Savvy Resources Ltd - HongKong
  • Kalimantan Lumbung Energi - Indonesia
  • Peabody Energy - USA
  • TNB Fuel Sdn Bhd - Malaysia
  • Directorate General of MIneral and Coal - Indonesia
  • Africa Commodities Group - South Africa
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • WorleyParsons
  • NTPC Limited - India
  • Banpu Public Company Limited - Thailand
  • Vale Mozambique
  • Asia Cement - Taiwan
  • Sarangani Energy Corporation, Philippines
  • Bhushan Steel Limited - India
  • Formosa Plastics Group - Taiwan
  • Berau Coal - Indonesia
  • Semirara Mining and Power Corporation, Philippines
  • McConnell Dowell - Australia
  • Chamber of Mines of South Africa
  • Posco Energy - South Korea
  • Tata Chemicals Ltd - India
  • Indonesian Coal Mining Association
  • Eastern Energy - Thailand
  • Chettinad Cement Corporation Ltd - India
  • Coal and Oil Company - UAE
  • Altura Mining Limited, Indonesia
  • Kohat Cement Company Ltd. - Pakistan
  • Rudhra Energy - India
  • Mercuria Energy - Indonesia
  • JPower - Japan
  • Mitsui