COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Thursday, 14 May 20
OPEC REVISES DOWN GLOBAL OIL DEMAND FORECAST AGAIN
Crude Oil Price Movements Crude oil prices recorded a second sharp monthly drop in April, amid an increasing oil surplus in the spot market. Th ...


Thursday, 14 May 20
NEW COVID-19 GUIDELINES FOCUS ON SAFE INTERFACE BETWEEN SHIP AND SHORE STAFF - GARD
At a time when the COVID-19 pandemic is affecting the global population, it is important that ships’ crew and port workers protect each other ...


Wednesday, 13 May 20
CHINA TAIYUAN COAL TRANSACTION PRICE INDEX DOWN 0.4 PCT - XINHUA
China Taiyuan coal transaction price index stood at 124.93 points Monday, down 0.4 percent week on week.   The index, released by Chin ...


Tuesday, 12 May 20
IN THE FIRST 4 MONTHS OF 2020, SOUTH KOREA IMPORTED 46.6 MLN TONNES OF CRUDE OIL BY SEA, A NET DECLINE OF 14.1% YOY - BC
South Korea is certainly one of the countries which has handled better the current Covid-19 crisis. In the first week of May 2020, new cases of ...


Tuesday, 12 May 20
OIL MARKET TURBULENCE PIVOTS FOCUS ON FLOATING STORAGE TECHNICAL NEEDS - LLOYD'S REGISTER
KNOWLEDGE TO ELEVATE Negative oil prices and off-the-scale volatility in crude markets are positive for floating storage, as the next chapter ...


   192 193 194 195 196   
Showing 966 to 970 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • BNP Paribas - Singapore
  • Mitra SK Pvt Ltd - India
  • Leighton Contractors Pty Ltd - Australia
  • TeaM Sual Corporation - Philippines
  • Aboitiz Power Corporation - Philippines
  • Indian Energy Exchange, India
  • Alfred C Toepfer International GmbH - Germany
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • IOL Indonesia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • CIMB Investment Bank - Malaysia
  • Neyveli Lignite Corporation Ltd, - India
  • Madhucon Powers Ltd - India
  • Kobexindo Tractors - Indoneisa
  • Romanian Commodities Exchange
  • PLN Batubara - Indonesia
  • Electricity Generating Authority of Thailand
  • Fearnleys - India
  • Star Paper Mills Limited - India
  • Directorate Of Revenue Intelligence - India
  • SMG Consultants - Indonesia
  • Parliament of New Zealand
  • Vitol - Bahrain
  • Indika Energy - Indonesia
  • Petrosea - Indonesia
  • Wilmar Investment Holdings
  • Planning Commission, India
  • Medco Energi Mining Internasional
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Ind-Barath Power Infra Limited - India
  • Cargill India Pvt Ltd
  • Kepco SPC Power Corporation, Philippines
  • AsiaOL BioFuels Corp., Philippines
  • McConnell Dowell - Australia
  • Infraline Energy - India
  • TRAFIGURA, South Korea
  • Asmin Koalindo Tuhup - Indonesia
  • Britmindo - Indonesia
  • SGS (Thailand) Limited
  • CoalTek, United States
  • The University of Queensland
  • Kalimantan Lumbung Energi - Indonesia
  • Runge Indonesia
  • Bulk Trading Sa - Switzerland
  • Bukit Asam (Persero) Tbk - Indonesia
  • Larsen & Toubro Limited - India
  • Merrill Lynch Bank
  • Freeport Indonesia
  • Reliance Power - India
  • World Bank
  • PowerSource Philippines DevCo
  • Rio Tinto Coal - Australia
  • Cosco
  • Noble Europe Ltd - UK
  • The India Cements Ltd
  • Energy Link Ltd, New Zealand
  • Bharathi Cement Corporation - India
  • Asia Cement - Taiwan
  • Toyota Tsusho Corporation, Japan
  • Glencore India Pvt. Ltd
  • London Commodity Brokers - England
  • Therma Luzon, Inc, Philippines
  • Dalmia Cement Bharat India
  • Bayan Resources Tbk. - Indonesia
  • Holcim Trading Pte Ltd - Singapore
  • Mjunction Services Limited - India
  • Bank of China, Malaysia
  • ICICI Bank Limited - India
  • SASOL - South Africa
  • Indo Tambangraya Megah - Indonesia
  • India Bulls Power Limited - India
  • IMC Shipping - Singapore
  • TANGEDCO India
  • Cigading International Bulk Terminal - Indonesia
  • ANZ Bank - Australia
  • Iligan Light & Power Inc, Philippines
  • Vizag Seaport Private Limited - India
  • Maharashtra Electricity Regulatory Commission - India
  • Bhatia International Limited - India
  • Indonesian Coal Mining Association
  • Orica Mining Services - Indonesia
  • Mitsubishi Corporation
  • GAC Shipping (India) Pvt Ltd
  • Sical Logistics Limited - India
  • Peabody Energy - USA
  • KPCL - India
  • Savvy Resources Ltd - HongKong
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Tamil Nadu electricity Board
  • Kumho Petrochemical, South Korea
  • Deloitte Consulting - India
  • Bangkok Bank PCL
  • globalCOAL - UK
  • Minerals Council of Australia
  • Global Green Power PLC Corporation, Philippines
  • Maruti Cements - India
  • Eastern Coal Council - USA
  • Siam City Cement PLC, Thailand
  • McKinsey & Co - India
  • LBH Netherlands Bv - Netherlands
  • Inspectorate - India
  • Coastal Gujarat Power Limited - India
  • Indogreen Group - Indonesia
  • Samtan Co., Ltd - South Korea
  • Port Waratah Coal Services - Australia
  • Gresik Semen - Indonesia
  • Price Waterhouse Coopers - Russia
  • APGENCO India
  • Baramulti Group, Indonesia
  • Thermax Limited - India
  • Aditya Birla Group - India
  • GMR Energy Limited - India
  • WorleyParsons
  • Energy Development Corp, Philippines
  • Surastha Cement
  • EMO - The Netherlands
  • Coalindo Energy - Indonesia
  • Ministry of Transport, Egypt
  • Mechel - Russia
  • Heidelberg Cement - Germany
  • UBS Singapore
  • Semirara Mining Corp, Philippines
  • Coal and Oil Company - UAE
  • Commonwealth Bank - Australia
  • Tata Chemicals Ltd - India
  • Global Business Power Corporation, Philippines
  • Humpuss - Indonesia
  • CNBM International Corporation - China
  • Bhushan Steel Limited - India
  • Uttam Galva Steels Limited - India
  • Banpu Public Company Limited - Thailand
  • Qatrana Cement - Jordan
  • NALCO India
  • Sucofindo - Indonesia
  • Africa Commodities Group - South Africa
  • Cardiff University - UK
  • Platou - Singapore
  • Ambuja Cements Ltd - India
  • HSBC - Hong Kong
  • Sarangani Energy Corporation, Philippines
  • New Zealand Coal & Carbon
  • bp singapore
  • CESC Limited - India
  • Kapuas Tunggal Persada - Indonesia
  • Mercator Lines Limited - India
  • Sojitz Corporation - Japan
  • J M Baxi & Co - India
  • OPG Power Generation Pvt Ltd - India
  • Adaro Indonesia
  • Vijayanagar Sugar Pvt Ltd - India
  • Siam City Cement - Thailand
  • IHS Mccloskey Coal Group - USA
  • Coaltrans Conferences
  • Krishnapatnam Port Company Ltd. - India
  • Trasteel International SA, Italy
  • Sinarmas Energy and Mining - Indonesia
  • TNB Fuel Sdn Bhd - Malaysia
  • Petron Corporation, Philippines
  • Economic Council, Georgia
  • Geoservices-GeoAssay Lab
  • Coeclerici Indonesia
  • Core Mineral Indonesia
  • Parry Sugars Refinery, India
  • Barasentosa Lestari - Indonesia
  • Bahari Cakrawala Sebuku - Indonesia
  • Malabar Cements Ltd - India
  • The Treasury - Australian Government
  • Wood Mackenzie - Singapore
  • ETA - Dubai
  • RBS Sempra - UK
  • Independent Power Producers Association of India
  • Formosa Plastics Group - Taiwan
  • Panama Canal Authority
  • ING Bank NV - Singapore
  • Thai Mozambique Logistica
  • Semirara Mining and Power Corporation, Philippines
  • PetroVietnam Power Coal Import and Supply Company
  • Clarksons - UK
  • Gujarat Sidhee Cement - India
  • JPower - Japan
  • White Energy Company Limited
  • VISA Power Limited - India
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • GVK Power & Infra Limited - India
  • Enel Italy
  • Permata Bank - Indonesia
  • Eastern Energy - Thailand
  • SRK Consulting
  • Kartika Selabumi Mining - Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • Berau Coal - Indonesia
  • Xstrata Coal
  • Miang Besar Coal Terminal - Indonesia
  • Jatenergy - Australia
  • Binh Thuan Hamico - Vietnam
  • Karbindo Abesyapradhi - Indoneisa
  • Global Coal Blending Company Limited - Australia
  • Credit Suisse - India
  • DBS Bank - Singapore
  • Merrill Lynch Commodities Europe
  • Thomson Reuters GRC
  • Intertek Mineral Services - Indonesia
  • Cement Manufacturers Association - India
  • BRS Brokers - Singapore
  • Vale Mozambique
  • Mintek Dendrill Indonesia
  • Pipit Mutiara Jaya. PT, Indonesia
  • Kohat Cement Company Ltd. - Pakistan
  • Pinang Coal Indonesia
  • Attock Cement Pakistan Limited
  • MS Steel International - UAE
  • Ince & co LLP
  • Sakthi Sugars Limited - India
  • Tanito Harum - Indonesia
  • Jindal Steel & Power Ltd - India
  • Arch Coal - USA
  • PTC India Limited - India
  • Metalloyd Limited - United Kingdom
  • Bhoruka Overseas - Indonesia
  • World Coal - UK
  • Deutsche Bank - India
  • Lafarge - France
  • Directorate General of MIneral and Coal - Indonesia
  • Globalindo Alam Lestari - Indonesia
  • Meralco Power Generation, Philippines
  • CCIC - Indonesia
  • Electricity Authority, New Zealand
  • Cebu Energy, Philippines
  • NTPC Limited - India
  • Grasim Industreis Ltd - India
  • Australian Commodity Traders Exchange
  • Power Finance Corporation Ltd., India
  • Jorong Barutama Greston.PT - Indonesia
  • European Bulk Services B.V. - Netherlands
  • Chamber of Mines of South Africa
  • IBC Asia (S) Pte Ltd
  • Ernst & Young Pvt. Ltd.
  • Anglo American - United Kingdom
  • Russian Coal LLC
  • Coal Orbis AG
  • MEC Coal - Indonesia
  • Chettinad Cement Corporation Ltd - India
  • Coal India Limited
  • Argus Media - Singapore
  • Shenhua Group - China
  • Gujarat Electricity Regulatory Commission - India
  • GHCL Limited - India
  • Sindya Power Generating Company Private Ltd
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Straits Asia Resources Limited - Singapore
  • Platts
  • Indorama - Singapore
  • Marubeni Corporation - India
  • IEA Clean Coal Centre - UK
  • PNOC Exploration Corporation - Philippines
  • Oldendorff Carriers - Singapore
  • Essar Steel Hazira Ltd - India
  • OCBC - Singapore
  • Posco Energy - South Korea
  • Australian Coal Association
  • SUEK AG - Indonesia
  • Kaltim Prima Coal - Indonesia
  • Samsung - South Korea
  • GNFC Limited - India
  • Interocean Group of Companies - India
  • Karaikal Port Pvt Ltd - India
  • Manunggal Multi Energi - Indonesia
  • Mercuria Energy - Indonesia
  • Tata Power - India
  • KEPCO - South Korea
  • Videocon Industries ltd - India
  • Central Java Power - Indonesia
  • Indian School of Mines
  • PLN - Indonesia
  • Singapore Mercantile Exchange
  • The State Trading Corporation of India Ltd
  • Vedanta Resources Plc - India
  • Ceylon Electricity Board - Sri Lanka
  • Pendopo Energi Batubara - Indonesia
  • GB Group - China
  • Timah Investasi Mineral - Indoneisa
  • Goldman Sachs - Singapore
  • Georgia Ports Authority, United States
  • Mitsui
  • Lanco Infratech Ltd - India
  • Gupta Coal India Ltd
  • Jaiprakash Power Ventures ltd
  • KOWEPO - South Korea
  • Antam Resourcindo - Indonesia
  • Cemex - Philippines
  • Altura Mining Limited, Indonesia
  • TGV SRAAC LIMITED, India
  • U S Energy Resources
  • Thiess Contractors Indonesia
  • Salva Resources Pvt Ltd - India
  • ACC Limited - India
  • SN Aboitiz Power Inc, Philippines
  • San Jose City I Power Corp, Philippines
  • Bank of America
  • Inco-Indonesia
  • Malco - India
  • Moodys - Singapore
  • Makarim & Taira - Indonesia
  • KPMG - USA
  • Thriveni
  • TNPL - India
  • EIA - United States
  • Edison Trading Spa - Italy
  • Standard Chartered Bank - UAE
  • JPMorgan - India
  • Kobe Steel Ltd - Japan
  • Bangladesh Power Developement Board
  • Latin American Coal - Colombia
  • Renaissance Capital - South Africa
  • Maybank - Singapore
  • Meenaskhi Energy Private Limited - India
  • Gujarat Mineral Development Corp Ltd - India
  • PetroVietnam
  • GN Power Mariveles Coal Plant, Philippines
  • Maersk Broker
  • Sree Jayajothi Cements Limited - India
  • Carbofer General Trading SA - India
  • Orica Australia Pty. Ltd.
  • Bukit Baiduri Energy - Indonesia
  • Maheswari Brothers Coal Limited - India
  • Agrawal Coal Company - India
  • Total Coal South Africa
  • Indonesia Power. PT
  • Xindia Steels Limited - India
  • Adani Power Ltd - India
  • Bukit Makmur.PT - Indonesia
  • Billiton Holdings Pty Ltd - Australia
  • Borneo Indobara - Indonesia
  • Rudhra Energy - India
  • ASAPP Information Group - India
  • Petrochimia International Co. Ltd.- Taiwan
  • Central Electricity Authority - India
  • International Coal Ventures Pvt Ltd - India
  • Thailand Anthracite
  • SMC Global Power, Philippines
  • Shree Cement - India
  • Asian Development Bank
  • Barclays Capital - USA
  • UOB Asia (HK) Ltd
  • Simpson Spence & Young - Indonesia
  • Riau Bara Harum - Indonesia
  • Japan Coal Energy Center
  • Indian Oil Corporation Limited
  • South Luzon Thermal Energy Corporation
  • Arutmin Indonesia
  • Ministry of Mines - Canada
  • Ministry of Finance - Indonesia
  • Kideco Jaya Agung - Indonesia
  • Idemitsu - Japan