COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Thursday, 21 May 20
KOMIPO INVITED BIDS FOR TOTAL 610000 MT OF LCV AND HCV COAL FOR 2H 2020
COALspot.com: South Korea’s Korea Midland Power Co. Ltd. (KOMIPO) has Issued an International Tender for 130,000 mt of 5700 NCV coal  an ...


Wednesday, 20 May 20
ADARO ENERGY BOOKED A 5% INCREASE IN COAL PRODUCTION VOLUME Y-O-Y IN 1Q2020
PT. Adaro Energy Tbk, Indonesia’s one of the largest coal miner, booked a 5% increase in coal production volume year-over-year in 1Q2020. The ...


Wednesday, 20 May 20
BRAZIL SOYBEAN EXPORTS HAVE BEEN SURGING THIS YEAR - BANCHERO COSTA
Brazil soybean exports have been surging this year, thanks to a combination of strong demand from China, a bumper crop, and favourable exchange rat ...


Wednesday, 20 May 20
MARKET INSIGHT
Seafarers keep maritime trade going so that the food, raw materials, energy and manufactured goods on which so many depend can continue moving arou ...


Tuesday, 19 May 20
AMENDMENT OF THE INDONESIAN MINING LAW: TYING UP LOOSE ENDS - UMBRA
KNOWLEDGE TO ELEVATE The finalized draft of Law on the amendment of the Mining Law (Bill) was publicly released on 11 May 2020 and was then ap ...


   190 191 192 193 194   
Showing 956 to 960 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • KEPCO - South Korea
  • Jatenergy - Australia
  • Semirara Mining Corp, Philippines
  • Minerals Council of Australia
  • Aditya Birla Group - India
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Edison Trading Spa - Italy
  • Tata Chemicals Ltd - India
  • Anglo American - United Kingdom
  • Mercator Lines Limited - India
  • Berau Coal - Indonesia
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • VISA Power Limited - India
  • Permata Bank - Indonesia
  • Bukit Makmur.PT - Indonesia
  • HSBC - Hong Kong
  • GAC Shipping (India) Pvt Ltd
  • Glencore India Pvt. Ltd
  • Humpuss - Indonesia
  • PLN Batubara - Indonesia
  • Kepco SPC Power Corporation, Philippines
  • Thermax Limited - India
  • PetroVietnam
  • Price Waterhouse Coopers - Russia
  • Holcim Trading Pte Ltd - Singapore
  • Bulk Trading Sa - Switzerland
  • Samsung - South Korea
  • Latin American Coal - Colombia
  • Gujarat Mineral Development Corp Ltd - India
  • Inspectorate - India
  • Qatrana Cement - Jordan
  • Vale Mozambique
  • Vizag Seaport Private Limited - India
  • Independent Power Producers Association of India
  • GVK Power & Infra Limited - India
  • Karbindo Abesyapradhi - Indoneisa
  • Tata Power - India
  • Bahari Cakrawala Sebuku - Indonesia
  • TNPL - India
  • Ince & co LLP
  • Goldman Sachs - Singapore
  • Peabody Energy - USA
  • DBS Bank - Singapore
  • UOB Asia (HK) Ltd
  • Directorate Of Revenue Intelligence - India
  • IEA Clean Coal Centre - UK
  • Simpson Spence & Young - Indonesia
  • IBC Asia (S) Pte Ltd
  • LBH Netherlands Bv - Netherlands
  • Indian Energy Exchange, India
  • Parliament of New Zealand
  • Kohat Cement Company Ltd. - Pakistan
  • UBS Singapore
  • U S Energy Resources
  • Indian School of Mines
  • Core Mineral Indonesia
  • Ministry of Transport, Egypt
  • Renaissance Capital - South Africa
  • Argus Media - Singapore
  • Carbofer General Trading SA - India
  • Sucofindo - Indonesia
  • International Coal Ventures Pvt Ltd - India
  • Asian Development Bank
  • Manunggal Multi Energi - Indonesia
  • Indogreen Group - Indonesia
  • Lafarge - France
  • BNP Paribas - Singapore
  • Electricity Generating Authority of Thailand
  • Coeclerici Indonesia
  • Salva Resources Pvt Ltd - India
  • Sarangani Energy Corporation, Philippines
  • Wilmar Investment Holdings
  • WorleyParsons
  • Siam City Cement - Thailand
  • Georgia Ports Authority, United States
  • GNFC Limited - India
  • Tamil Nadu electricity Board
  • TNB Fuel Sdn Bhd - Malaysia
  • Thriveni
  • ANZ Bank - Australia
  • Pinang Coal Indonesia
  • Indian Oil Corporation Limited
  • CNBM International Corporation - China
  • Ind-Barath Power Infra Limited - India
  • JPower - Japan
  • CESC Limited - India
  • Oldendorff Carriers - Singapore
  • Credit Suisse - India
  • Sakthi Sugars Limited - India
  • OCBC - Singapore
  • Thai Mozambique Logistica
  • Maersk Broker
  • World Coal - UK
  • Fearnleys - India
  • IHS Mccloskey Coal Group - USA
  • Freeport Indonesia
  • Vedanta Resources Plc - India
  • Adani Power Ltd - India
  • European Bulk Services B.V. - Netherlands
  • CoalTek, United States
  • BRS Brokers - Singapore
  • Central Java Power - Indonesia
  • Malco - India
  • Rudhra Energy - India
  • KPCL - India
  • Cardiff University - UK
  • Ceylon Electricity Board - Sri Lanka
  • McKinsey & Co - India
  • Kalimantan Lumbung Energi - Indonesia
  • GMR Energy Limited - India
  • Siam City Cement PLC, Thailand
  • Marubeni Corporation - India
  • Indika Energy - Indonesia
  • Japan Coal Energy Center
  • Ministry of Finance - Indonesia
  • Therma Luzon, Inc, Philippines
  • Chettinad Cement Corporation Ltd - India
  • World Bank
  • PTC India Limited - India
  • Pendopo Energi Batubara - Indonesia
  • Trasteel International SA, Italy
  • NTPC Limited - India
  • The India Cements Ltd
  • Kumho Petrochemical, South Korea
  • McConnell Dowell - Australia
  • Krishnapatnam Port Company Ltd. - India
  • Surastha Cement
  • ETA - Dubai
  • Miang Besar Coal Terminal - Indonesia
  • ACC Limited - India
  • SRK Consulting
  • Geoservices-GeoAssay Lab
  • Kideco Jaya Agung - Indonesia
  • Metalloyd Limited - United Kingdom
  • Leighton Contractors Pty Ltd - Australia
  • Sojitz Corporation - Japan
  • India Bulls Power Limited - India
  • Videocon Industries ltd - India
  • SN Aboitiz Power Inc, Philippines
  • Parry Sugars Refinery, India
  • Petrosea - Indonesia
  • Eastern Energy - Thailand
  • SGS (Thailand) Limited
  • Sindya Power Generating Company Private Ltd
  • Bank of China, Malaysia
  • Rashtriya Ispat Nigam Limited - India
  • Antam Resourcindo - Indonesia
  • Maharashtra Electricity Regulatory Commission - India
  • SMC Global Power, Philippines
  • bp singapore
  • Cemex - Philippines
  • Energy Development Corp, Philippines
  • ICICI Bank Limited - India
  • TeaM Sual Corporation - Philippines
  • Reliance Power - India
  • Malabar Cements Ltd - India
  • CIMB Investment Bank - Malaysia
  • SUEK AG - Indonesia
  • Australian Coal Association
  • OPG Power Generation Pvt Ltd - India
  • GB Group - China
  • Indonesian Coal Mining Association
  • Wood Mackenzie - Singapore
  • Gupta Coal India Ltd
  • Billiton Holdings Pty Ltd - Australia
  • London Commodity Brokers - England
  • Noble Europe Ltd - UK
  • Bayan Resources Tbk. - Indonesia
  • Coal India Limited
  • Riau Bara Harum - Indonesia
  • Orica Australia Pty. Ltd.
  • Economic Council, Georgia
  • Coalindo Energy - Indonesia
  • Enel Italy
  • Clarksons - UK
  • Mjunction Services Limited - India
  • IOL Indonesia
  • Bukit Asam (Persero) Tbk - Indonesia
  • globalCOAL - UK
  • Interocean Group of Companies - India
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • EIA - United States
  • Shenhua Group - China
  • Coal Orbis AG
  • Sinarmas Energy and Mining - Indonesia
  • KOWEPO - South Korea
  • Mercuria Energy - Indonesia
  • Mechel - Russia
  • Karaikal Port Pvt Ltd - India
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Electricity Authority, New Zealand
  • J M Baxi & Co - India
  • Thomson Reuters GRC
  • Cargill India Pvt Ltd
  • Savvy Resources Ltd - HongKong
  • Bhatia International Limited - India
  • Gresik Semen - Indonesia
  • Toyota Tsusho Corporation, Japan
  • Singapore Mercantile Exchange
  • Indonesia Power. PT
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Merrill Lynch Commodities Europe
  • EMO - The Netherlands
  • Indorama - Singapore
  • Deutsche Bank - India
  • Moodys - Singapore
  • Jaiprakash Power Ventures ltd
  • Standard Chartered Bank - UAE
  • Indo Tambangraya Megah - Indonesia
  • Runge Indonesia
  • Makarim & Taira - Indonesia
  • Mitsubishi Corporation
  • Essar Steel Hazira Ltd - India
  • Posco Energy - South Korea
  • RBS Sempra - UK
  • Merrill Lynch Bank
  • Panama Canal Authority
  • Coal and Oil Company - UAE
  • Eastern Coal Council - USA
  • Bhushan Steel Limited - India
  • MS Steel International - UAE
  • GN Power Mariveles Coal Plant, Philippines
  • Cosco
  • Coastal Gujarat Power Limited - India
  • Alfred C Toepfer International GmbH - Germany
  • APGENCO India
  • Binh Thuan Hamico - Vietnam
  • Aboitiz Power Corporation - Philippines
  • Infraline Energy - India
  • Central Electricity Authority - India
  • Shree Cement - India
  • AsiaOL BioFuels Corp., Philippines
  • Bhoruka Overseas - Indonesia
  • Tanito Harum - Indonesia
  • New Zealand Coal & Carbon
  • JPMorgan - India
  • Power Finance Corporation Ltd., India
  • Idemitsu - Japan
  • The Treasury - Australian Government
  • Mitra SK Pvt Ltd - India
  • Kobexindo Tractors - Indoneisa
  • PowerSource Philippines DevCo
  • San Jose City I Power Corp, Philippines
  • White Energy Company Limited
  • Chamber of Mines of South Africa
  • Asia Cement - Taiwan
  • Bangkok Bank PCL
  • Platou - Singapore
  • ING Bank NV - Singapore
  • Arutmin Indonesia
  • Bukit Baiduri Energy - Indonesia
  • Planning Commission, India
  • Semirara Mining and Power Corporation, Philippines
  • Ambuja Cements Ltd - India
  • Xindia Steels Limited - India
  • Thailand Anthracite
  • TRAFIGURA, South Korea
  • Cebu Energy, Philippines
  • Gujarat Sidhee Cement - India
  • Larsen & Toubro Limited - India
  • Bharathi Cement Corporation - India
  • Global Business Power Corporation, Philippines
  • SMG Consultants - Indonesia
  • Britmindo - Indonesia
  • CCIC - Indonesia
  • Barclays Capital - USA
  • Orica Mining Services - Indonesia
  • SASOL - South Africa
  • Inco-Indonesia
  • Formosa Plastics Group - Taiwan
  • PetroVietnam Power Coal Import and Supply Company
  • Adaro Indonesia
  • Attock Cement Pakistan Limited
  • Globalindo Alam Lestari - Indonesia
  • The University of Queensland
  • Africa Commodities Group - South Africa
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Mintek Dendrill Indonesia
  • MEC Coal - Indonesia
  • Deloitte Consulting - India
  • Barasentosa Lestari - Indonesia
  • Straits Asia Resources Limited - Singapore
  • Samtan Co., Ltd - South Korea
  • Kartika Selabumi Mining - Indonesia
  • Sree Jayajothi Cements Limited - India
  • Vitol - Bahrain
  • Meralco Power Generation, Philippines
  • Coaltrans Conferences
  • Jorong Barutama Greston.PT - Indonesia
  • Agrawal Coal Company - India
  • Banpu Public Company Limited - Thailand
  • Neyveli Lignite Corporation Ltd, - India
  • The State Trading Corporation of India Ltd
  • Total Coal South Africa
  • Xstrata Coal
  • Altura Mining Limited, Indonesia
  • Ministry of Mines - Canada
  • KPMG - USA
  • Jindal Steel & Power Ltd - India
  • IMC Shipping - Singapore
  • Lanco Infratech Ltd - India
  • NALCO India
  • Kobe Steel Ltd - Japan
  • Iligan Light & Power Inc, Philippines
  • Energy Link Ltd, New Zealand
  • Maybank - Singapore
  • Bangladesh Power Developement Board
  • Bank of America
  • ASAPP Information Group - India
  • Heidelberg Cement - Germany
  • Grasim Industreis Ltd - India
  • Medco Energi Mining Internasional
  • Cement Manufacturers Association - India
  • Cigading International Bulk Terminal - Indonesia
  • Maheswari Brothers Coal Limited - India
  • Arch Coal - USA
  • Australian Commodity Traders Exchange
  • Kapuas Tunggal Persada - Indonesia
  • Baramulti Group, Indonesia
  • South Luzon Thermal Energy Corporation
  • Thiess Contractors Indonesia
  • TGV SRAAC LIMITED, India
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Petrochimia International Co. Ltd.- Taiwan
  • Dalmia Cement Bharat India
  • Platts
  • Star Paper Mills Limited - India
  • Madhucon Powers Ltd - India
  • Russian Coal LLC
  • Ernst & Young Pvt. Ltd.
  • Global Coal Blending Company Limited - Australia
  • Sical Logistics Limited - India
  • Commonwealth Bank - Australia
  • PLN - Indonesia
  • Rio Tinto Coal - Australia
  • Gujarat Electricity Regulatory Commission - India
  • Directorate General of MIneral and Coal - Indonesia
  • Kaltim Prima Coal - Indonesia
  • Borneo Indobara - Indonesia
  • Romanian Commodities Exchange
  • Mitsui
  • PNOC Exploration Corporation - Philippines
  • Maruti Cements - India
  • Meenaskhi Energy Private Limited - India
  • Global Green Power PLC Corporation, Philippines
  • Vijayanagar Sugar Pvt Ltd - India
  • Timah Investasi Mineral - Indoneisa
  • Asmin Koalindo Tuhup - Indonesia
  • Petron Corporation, Philippines
  • Port Waratah Coal Services - Australia
  • GHCL Limited - India
  • Uttam Galva Steels Limited - India
  • Intertek Mineral Services - Indonesia
  • TANGEDCO India
  • Pipit Mutiara Jaya. PT, Indonesia