COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Wednesday, 27 May 20
CHINA TAIYUAN COAL TRANSACTION PRICE INDEX UP 0.94 PCT - XINHUA
China Taiyuan coal transaction price index stood at 125.03 points Monday, up 0.94 percent week on week.   The index, released by China ...


Monday, 25 May 20
NON-OPEC OIL SUPPLY DEVELOPMENT - OPEC
Non-OPEC oil supply continued to increase by 2.0 mb/d in 2019, driven by US shale production, which rose by 1.7 mb/d, amounting to 84% of total non ...


Sunday, 24 May 20
A 63,000 FIXED DELIVERY VIETNAM TRIP VIA INDONESIA REDELIVERY KOSICHANG AT $8,500 - BALTIC BRIEFING
Capesize After a week of bounce momentum the market appears to have stalled out once again. The Capesize 5TC has more than doubled since last F ...


Saturday, 23 May 20
COLOMBIA COAL OUTPUT DOWN 7.2% IN Q1 ON LOW PRICES, CORONAVIRUS LOCKDOWN - REUTERS
Coal production in Colombia, the world’s fifth-largest coal exporter, fell 7.2% in the first quarter because of low prices and coronavirus qu ...


Saturday, 23 May 20
EWP INVITES BIDS FOR 840,000 METRIC TONS OF MIN 5700 NAR COAL
COALspot.com: South Korea’s Korea East-West Power Co. Ltd (EWP) has Issued an International Tender for total Max 840,000 Metric Tons of min 5 ...


   189 190 191 192 193   
Showing 951 to 955 news of total 6871
News by Category
Popular News
 
Total Members : 28,706
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Petrosea - Indonesia
  • Shree Cement - India
  • Kaltim Prima Coal - Indonesia
  • McKinsey & Co - India
  • KOWEPO - South Korea
  • International Coal Ventures Pvt Ltd - India
  • bp singapore
  • Coal and Oil Company - UAE
  • Kalimantan Lumbung Energi - Indonesia
  • Bukit Asam (Persero) Tbk - Indonesia
  • Runge Indonesia
  • The Treasury - Australian Government
  • Bhoruka Overseas - Indonesia
  • ANZ Bank - Australia
  • Mitsubishi Corporation
  • Sucofindo - Indonesia
  • Gujarat Electricity Regulatory Commission - India
  • Coastal Gujarat Power Limited - India
  • Ernst & Young Pvt. Ltd.
  • Globalindo Alam Lestari - Indonesia
  • Shenhua Group - China
  • Ceylon Electricity Board - Sri Lanka
  • GHCL Limited - India
  • Cardiff University - UK
  • Inspectorate - India
  • Aboitiz Power Corporation - Philippines
  • Indogreen Group - Indonesia
  • Salva Resources Pvt Ltd - India
  • Billiton Holdings Pty Ltd - Australia
  • Arutmin Indonesia
  • NTPC Limited - India
  • Videocon Industries ltd - India
  • Africa Commodities Group - South Africa
  • HSBC - Hong Kong
  • Fearnleys - India
  • globalCOAL - UK
  • Bulk Trading Sa - Switzerland
  • APGENCO India
  • Renaissance Capital - South Africa
  • Oldendorff Carriers - Singapore
  • Kumho Petrochemical, South Korea
  • KEPCO - South Korea
  • GB Group - China
  • Essar Steel Hazira Ltd - India
  • Platts
  • Sree Jayajothi Cements Limited - India
  • Asmin Koalindo Tuhup - Indonesia
  • The State Trading Corporation of India Ltd
  • Xstrata Coal
  • TNB Fuel Sdn Bhd - Malaysia
  • South Luzon Thermal Energy Corporation
  • Global Coal Blending Company Limited - Australia
  • WorleyParsons
  • San Jose City I Power Corp, Philippines
  • Central Java Power - Indonesia
  • GN Power Mariveles Coal Plant, Philippines
  • Bhushan Steel Limited - India
  • Vizag Seaport Private Limited - India
  • SGS (Thailand) Limited
  • Wood Mackenzie - Singapore
  • Posco Energy - South Korea
  • Sical Logistics Limited - India
  • Permata Bank - Indonesia
  • Deutsche Bank - India
  • GVK Power & Infra Limited - India
  • Maharashtra Electricity Regulatory Commission - India
  • Jorong Barutama Greston.PT - Indonesia
  • Cemex - Philippines
  • Makarim & Taira - Indonesia
  • Inco-Indonesia
  • Merrill Lynch Commodities Europe
  • Romanian Commodities Exchange
  • Sinarmas Energy and Mining - Indonesia
  • PTC India Limited - India
  • AsiaOL BioFuels Corp., Philippines
  • McConnell Dowell - Australia
  • Bukit Baiduri Energy - Indonesia
  • Indo Tambangraya Megah - Indonesia
  • ING Bank NV - Singapore
  • Ind-Barath Power Infra Limited - India
  • Rio Tinto Coal - Australia
  • Indian Energy Exchange, India
  • PLN - Indonesia
  • Orica Mining Services - Indonesia
  • Intertek Mineral Services - Indonesia
  • CESC Limited - India
  • TGV SRAAC LIMITED, India
  • Marubeni Corporation - India
  • Formosa Plastics Group - Taiwan
  • Freeport Indonesia
  • Bahari Cakrawala Sebuku - Indonesia
  • Mitsui
  • London Commodity Brokers - England
  • Argus Media - Singapore
  • Petron Corporation, Philippines
  • CoalTek, United States
  • Ministry of Mines - Canada
  • SASOL - South Africa
  • Malabar Cements Ltd - India
  • Riau Bara Harum - Indonesia
  • Bank of America
  • Cebu Energy, Philippines
  • Adani Power Ltd - India
  • Samsung - South Korea
  • IBC Asia (S) Pte Ltd
  • Australian Coal Association
  • Karbindo Abesyapradhi - Indoneisa
  • Iligan Light & Power Inc, Philippines
  • Bhatia International Limited - India
  • Vedanta Resources Plc - India
  • IOL Indonesia
  • Gupta Coal India Ltd
  • Bayan Resources Tbk. - Indonesia
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Rudhra Energy - India
  • Indonesia Power. PT
  • SN Aboitiz Power Inc, Philippines
  • Global Business Power Corporation, Philippines
  • Mjunction Services Limited - India
  • Planning Commission, India
  • Jindal Steel & Power Ltd - India
  • Mintek Dendrill Indonesia
  • Directorate General of MIneral and Coal - Indonesia
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Berau Coal - Indonesia
  • Pendopo Energi Batubara - Indonesia
  • SMC Global Power, Philippines
  • Borneo Indobara - Indonesia
  • Toyota Tsusho Corporation, Japan
  • UOB Asia (HK) Ltd
  • Altura Mining Limited, Indonesia
  • Indian School of Mines
  • Kobexindo Tractors - Indoneisa
  • Commonwealth Bank - Australia
  • Mercator Lines Limited - India
  • Siam City Cement - Thailand
  • World Coal - UK
  • ASAPP Information Group - India
  • Thailand Anthracite
  • Grasim Industreis Ltd - India
  • MEC Coal - Indonesia
  • CNBM International Corporation - China
  • Power Finance Corporation Ltd., India
  • Kohat Cement Company Ltd. - Pakistan
  • Global Green Power PLC Corporation, Philippines
  • Deloitte Consulting - India
  • Britmindo - Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • Samtan Co., Ltd - South Korea
  • Ministry of Finance - Indonesia
  • Barasentosa Lestari - Indonesia
  • Cosco
  • Bank of China, Malaysia
  • Attock Cement Pakistan Limited
  • Directorate Of Revenue Intelligence - India
  • LBH Netherlands Bv - Netherlands
  • Georgia Ports Authority, United States
  • JPower - Japan
  • CCIC - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • Goldman Sachs - Singapore
  • Neyveli Lignite Corporation Ltd, - India
  • Mercuria Energy - Indonesia
  • VISA Power Limited - India
  • Baramulti Group, Indonesia
  • Adaro Indonesia
  • Sindya Power Generating Company Private Ltd
  • Eastern Energy - Thailand
  • Coeclerici Indonesia
  • Siam City Cement PLC, Thailand
  • Kobe Steel Ltd - Japan
  • Aditya Birla Group - India
  • JPMorgan - India
  • Gujarat Sidhee Cement - India
  • Orica Australia Pty. Ltd.
  • PLN Batubara - Indonesia
  • ICICI Bank Limited - India
  • Leighton Contractors Pty Ltd - Australia
  • PetroVietnam
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Lanco Infratech Ltd - India
  • Medco Energi Mining Internasional
  • PowerSource Philippines DevCo
  • SUEK AG - Indonesia
  • Infraline Energy - India
  • Straits Asia Resources Limited - Singapore
  • European Bulk Services B.V. - Netherlands
  • Thriveni
  • KPMG - USA
  • Miang Besar Coal Terminal - Indonesia
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Platou - Singapore
  • Bangladesh Power Developement Board
  • Indian Oil Corporation Limited
  • Meenaskhi Energy Private Limited - India
  • White Energy Company Limited
  • Maheswari Brothers Coal Limited - India
  • Latin American Coal - Colombia
  • Maruti Cements - India
  • Tata Power - India
  • Geoservices-GeoAssay Lab
  • ETA - Dubai
  • Core Mineral Indonesia
  • Star Paper Mills Limited - India
  • Ambuja Cements Ltd - India
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • GAC Shipping (India) Pvt Ltd
  • Madhucon Powers Ltd - India
  • Eastern Coal Council - USA
  • Kideco Jaya Agung - Indonesia
  • Karaikal Port Pvt Ltd - India
  • TNPL - India
  • Ministry of Transport, Egypt
  • Larsen & Toubro Limited - India
  • India Bulls Power Limited - India
  • Energy Development Corp, Philippines
  • Japan Coal Energy Center
  • IEA Clean Coal Centre - UK
  • BRS Brokers - Singapore
  • Singapore Mercantile Exchange
  • Total Coal South Africa
  • Tanito Harum - Indonesia
  • Qatrana Cement - Jordan
  • TRAFIGURA, South Korea
  • Thomson Reuters GRC
  • Wilmar Investment Holdings
  • Vitol - Bahrain
  • RBS Sempra - UK
  • Simpson Spence & Young - Indonesia
  • Banpu Public Company Limited - Thailand
  • GNFC Limited - India
  • Krishnapatnam Port Company Ltd. - India
  • U S Energy Resources
  • Sakthi Sugars Limited - India
  • Dalmia Cement Bharat India
  • Cigading International Bulk Terminal - Indonesia
  • NALCO India
  • Economic Council, Georgia
  • Idemitsu - Japan
  • Panama Canal Authority
  • Binh Thuan Hamico - Vietnam
  • Semirara Mining Corp, Philippines
  • DBS Bank - Singapore
  • Petrochimia International Co. Ltd.- Taiwan
  • Lafarge - France
  • Edison Trading Spa - Italy
  • KPCL - India
  • Timah Investasi Mineral - Indoneisa
  • Humpuss - Indonesia
  • Mitra SK Pvt Ltd - India
  • Indonesian Coal Mining Association
  • Ince & co LLP
  • Independent Power Producers Association of India
  • Tata Chemicals Ltd - India
  • TANGEDCO India
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Pipit Mutiara Jaya. PT, Indonesia
  • Clarksons - UK
  • UBS Singapore
  • Thai Mozambique Logistica
  • SRK Consulting
  • Antam Resourcindo - Indonesia
  • New Zealand Coal & Carbon
  • Bukit Makmur.PT - Indonesia
  • Thermax Limited - India
  • Peabody Energy - USA
  • Reliance Power - India
  • SMG Consultants - Indonesia
  • CIMB Investment Bank - Malaysia
  • Gujarat Mineral Development Corp Ltd - India
  • Electricity Generating Authority of Thailand
  • Electricity Authority, New Zealand
  • Coal India Limited
  • Cement Manufacturers Association - India
  • Meralco Power Generation, Philippines
  • BNP Paribas - Singapore
  • ACC Limited - India
  • Sarangani Energy Corporation, Philippines
  • Price Waterhouse Coopers - Russia
  • EMO - The Netherlands
  • Standard Chartered Bank - UAE
  • Sojitz Corporation - Japan
  • Parry Sugars Refinery, India
  • Asia Cement - Taiwan
  • Pinang Coal Indonesia
  • Surastha Cement
  • Savvy Resources Ltd - HongKong
  • Chamber of Mines of South Africa
  • Bangkok Bank PCL
  • Enel Italy
  • Coal Orbis AG
  • Thiess Contractors Indonesia
  • Kepco SPC Power Corporation, Philippines
  • Jaiprakash Power Ventures ltd
  • Coaltrans Conferences
  • Energy Link Ltd, New Zealand
  • Coalindo Energy - Indonesia
  • PetroVietnam Power Coal Import and Supply Company
  • Carbofer General Trading SA - India
  • Merrill Lynch Bank
  • Vale Mozambique
  • Central Electricity Authority - India
  • The University of Queensland
  • IHS Mccloskey Coal Group - USA
  • IMC Shipping - Singapore
  • Trasteel International SA, Italy
  • Noble Europe Ltd - UK
  • Barclays Capital - USA
  • OCBC - Singapore
  • The India Cements Ltd
  • Uttam Galva Steels Limited - India
  • Kartika Selabumi Mining - Indonesia
  • Interocean Group of Companies - India
  • Manunggal Multi Energi - Indonesia
  • Maersk Broker
  • Xindia Steels Limited - India
  • Bharathi Cement Corporation - India
  • Chettinad Cement Corporation Ltd - India
  • World Bank
  • Metalloyd Limited - United Kingdom
  • Russian Coal LLC
  • Glencore India Pvt. Ltd
  • Anglo American - United Kingdom
  • Therma Luzon, Inc, Philippines
  • Parliament of New Zealand
  • Kapuas Tunggal Persada - Indonesia
  • Port Waratah Coal Services - Australia
  • EIA - United States
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • J M Baxi & Co - India
  • Holcim Trading Pte Ltd - Singapore
  • Australian Commodity Traders Exchange
  • Moodys - Singapore
  • Indika Energy - Indonesia
  • Indorama - Singapore
  • PNOC Exploration Corporation - Philippines
  • Heidelberg Cement - Germany
  • Semirara Mining and Power Corporation, Philippines
  • Cargill India Pvt Ltd
  • Credit Suisse - India
  • Mechel - Russia
  • Maybank - Singapore
  • Malco - India
  • Vijayanagar Sugar Pvt Ltd - India
  • GMR Energy Limited - India
  • Arch Coal - USA
  • MS Steel International - UAE
  • TeaM Sual Corporation - Philippines
  • Asian Development Bank
  • Minerals Council of Australia
  • OPG Power Generation Pvt Ltd - India
  • Jatenergy - Australia
  • Agrawal Coal Company - India
  • Gresik Semen - Indonesia
  • Tamil Nadu electricity Board