LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Tuesday, 03 March 20
COAL'S SHARE OF CHINA ENERGY MIX FALLS IN 2019 BUT CONSUMPTION STILL RISING - REUTERS
Coal accounted for 57.7% of China’s primary energy consumption in 2019, the National Bureau of Statistics said on Friday, down 1.5 percentage ...


Monday, 02 March 20
SHIPOWNERS AND OPERATORS COULD FACE DETENTION OF SHIPS FROM 1ST MARCH UNDER IMO RULE - ICS
Port state control authorities will begin to enforce the IMO’s Sulphur 2020 from 1st March, making it an offense for ships to carry fuel that ...


Saturday, 29 February 20
SUPRAMAX SENTIMENT WAS UP IN A FEW KEY AREAS OVER THE LAST WEEK - BALTIC BRIEFING
Capesize The Capesize market woes related to Coronavirus have now spread through the wider global markets like wildfire. The wider supply and d ...


Thursday, 27 February 20
FOREIGN COMPANIES LIKELY TO SKIP COMMERCIAL COAL BLOCK AUCTIONS - ECONOMIC TIMES
The Centre is in the process of inviting global players for commercial mining, following 100% foreign direct investment in the sector. However, giv ...


Wednesday, 26 February 20
SHIPPING MARKET INSIGHT - INTERMODAL
Coming from one of its busiest periods historically, with a list of scrubber and BWMS retrofits on a waiting list, the ship repair sector is witnes ...


   219 220 221 222 223   
Showing 1101 to 1105 news of total 6871
News by Category
Popular News
 
Total Members : 28,705
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Malco - India
  • Trasteel International SA, Italy
  • McKinsey & Co - India
  • SMG Consultants - Indonesia
  • Sakthi Sugars Limited - India
  • Port Waratah Coal Services - Australia
  • Bukit Asam (Persero) Tbk - Indonesia
  • Essar Steel Hazira Ltd - India
  • OPG Power Generation Pvt Ltd - India
  • Pinang Coal Indonesia
  • Manunggal Multi Energi - Indonesia
  • Credit Suisse - India
  • Independent Power Producers Association of India
  • Singapore Mercantile Exchange
  • Gupta Coal India Ltd
  • Kumho Petrochemical, South Korea
  • Kaltim Prima Coal - Indonesia
  • Ambuja Cements Ltd - India
  • Idemitsu - Japan
  • Billiton Holdings Pty Ltd - Australia
  • Vale Mozambique
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Berau Coal - Indonesia
  • TNB Fuel Sdn Bhd - Malaysia
  • Wood Mackenzie - Singapore
  • Mechel - Russia
  • Jatenergy - Australia
  • Ministry of Mines - Canada
  • Lanco Infratech Ltd - India
  • Electricity Generating Authority of Thailand
  • Arutmin Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • GN Power Mariveles Coal Plant, Philippines
  • PetroVietnam
  • Miang Besar Coal Terminal - Indonesia
  • Pipit Mutiara Jaya. PT, Indonesia
  • Savvy Resources Ltd - HongKong
  • Wilmar Investment Holdings
  • Panama Canal Authority
  • Deloitte Consulting - India
  • Uttam Galva Steels Limited - India
  • IMC Shipping - Singapore
  • Reliance Power - India
  • KPCL - India
  • Deutsche Bank - India
  • Alfred C Toepfer International GmbH - Germany
  • TNPL - India
  • Indo Tambangraya Megah - Indonesia
  • VISA Power Limited - India
  • Eastern Energy - Thailand
  • Gujarat Mineral Development Corp Ltd - India
  • DBS Bank - Singapore
  • bp singapore
  • Indorama - Singapore
  • Mitra SK Pvt Ltd - India
  • Indonesian Coal Mining Association
  • RBS Sempra - UK
  • CoalTek, United States
  • Videocon Industries ltd - India
  • Globalindo Alam Lestari - Indonesia
  • Indian School of Mines
  • Inco-Indonesia
  • Japan Coal Energy Center
  • Vizag Seaport Private Limited - India
  • ASAPP Information Group - India
  • The State Trading Corporation of India Ltd
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • London Commodity Brokers - England
  • Energy Link Ltd, New Zealand
  • Arch Coal - USA
  • BRS Brokers - Singapore
  • World Bank
  • CNBM International Corporation - China
  • Kobexindo Tractors - Indoneisa
  • KPMG - USA
  • Sindya Power Generating Company Private Ltd
  • Maruti Cements - India
  • Cargill India Pvt Ltd
  • Shree Cement - India
  • Karaikal Port Pvt Ltd - India
  • JPower - Japan
  • Runge Indonesia
  • Coalindo Energy - Indonesia
  • Barclays Capital - USA
  • TGV SRAAC LIMITED, India
  • Tata Power - India
  • CESC Limited - India
  • Clarksons - UK
  • Attock Cement Pakistan Limited
  • India Bulls Power Limited - India
  • Asia Cement - Taiwan
  • Standard Chartered Bank - UAE
  • Merrill Lynch Bank
  • EIA - United States
  • Maersk Broker
  • Vijayanagar Sugar Pvt Ltd - India
  • SGS (Thailand) Limited
  • Baramulti Group, Indonesia
  • Kalimantan Lumbung Energi - Indonesia
  • SUEK AG - Indonesia
  • Aboitiz Power Corporation - Philippines
  • ANZ Bank - Australia
  • Orica Australia Pty. Ltd.
  • Coal and Oil Company - UAE
  • Chettinad Cement Corporation Ltd - India
  • White Energy Company Limited
  • Planning Commission, India
  • Neyveli Lignite Corporation Ltd, - India
  • Interocean Group of Companies - India
  • EMO - The Netherlands
  • Parry Sugars Refinery, India
  • Jaiprakash Power Ventures ltd
  • San Jose City I Power Corp, Philippines
  • Eastern Coal Council - USA
  • Siam City Cement - Thailand
  • Thailand Anthracite
  • UOB Asia (HK) Ltd
  • Tamil Nadu electricity Board
  • The University of Queensland
  • Therma Luzon, Inc, Philippines
  • globalCOAL - UK
  • Price Waterhouse Coopers - Russia
  • Australian Coal Association
  • KEPCO - South Korea
  • Metalloyd Limited - United Kingdom
  • Indian Oil Corporation Limited
  • Indian Energy Exchange, India
  • OCBC - Singapore
  • Peabody Energy - USA
  • South Luzon Thermal Energy Corporation
  • Riau Bara Harum - Indonesia
  • Agrawal Coal Company - India
  • Ind-Barath Power Infra Limited - India
  • ING Bank NV - Singapore
  • MS Steel International - UAE
  • Moodys - Singapore
  • Mjunction Services Limited - India
  • NTPC Limited - India
  • CCIC - Indonesia
  • Shenhua Group - China
  • Romanian Commodities Exchange
  • PLN Batubara - Indonesia
  • Merrill Lynch Commodities Europe
  • Glencore India Pvt. Ltd
  • Bulk Trading Sa - Switzerland
  • Platou - Singapore
  • Tata Chemicals Ltd - India
  • Sarangani Energy Corporation, Philippines
  • International Coal Ventures Pvt Ltd - India
  • Samtan Co., Ltd - South Korea
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Antam Resourcindo - Indonesia
  • Tanito Harum - Indonesia
  • Timah Investasi Mineral - Indoneisa
  • Kohat Cement Company Ltd. - Pakistan
  • ACC Limited - India
  • Petrochimia International Co. Ltd.- Taiwan
  • Mitsubishi Corporation
  • Russian Coal LLC
  • GHCL Limited - India
  • UBS Singapore
  • Jorong Barutama Greston.PT - Indonesia
  • Sojitz Corporation - Japan
  • WorleyParsons
  • Bhoruka Overseas - Indonesia
  • Total Coal South Africa
  • IOL Indonesia
  • Petrosea - Indonesia
  • Minerals Council of Australia
  • Ernst & Young Pvt. Ltd.
  • KOWEPO - South Korea
  • Carbofer General Trading SA - India
  • IEA Clean Coal Centre - UK
  • Iligan Light & Power Inc, Philippines
  • Kapuas Tunggal Persada - Indonesia
  • Xindia Steels Limited - India
  • Bukit Baiduri Energy - Indonesia
  • Coeclerici Indonesia
  • Gresik Semen - Indonesia
  • Salva Resources Pvt Ltd - India
  • World Coal - UK
  • Global Coal Blending Company Limited - Australia
  • TANGEDCO India
  • PetroVietnam Power Coal Import and Supply Company
  • Noble Europe Ltd - UK
  • IHS Mccloskey Coal Group - USA
  • ETA - Dubai
  • Thai Mozambique Logistica
  • AsiaOL BioFuels Corp., Philippines
  • Rio Tinto Coal - Australia
  • Asian Development Bank
  • Bayan Resources Tbk. - Indonesia
  • Australian Commodity Traders Exchange
  • Inspectorate - India
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Intertek Mineral Services - Indonesia
  • Simpson Spence & Young - Indonesia
  • Indika Energy - Indonesia
  • Ince & co LLP
  • Directorate Of Revenue Intelligence - India
  • Kepco SPC Power Corporation, Philippines
  • Maybank - Singapore
  • Freeport Indonesia
  • Cebu Energy, Philippines
  • Petron Corporation, Philippines
  • Altura Mining Limited, Indonesia
  • Rudhra Energy - India
  • Adaro Indonesia
  • Humpuss - Indonesia
  • GVK Power & Infra Limited - India
  • Argus Media - Singapore
  • Directorate General of MIneral and Coal - Indonesia
  • Vitol - Bahrain
  • Leighton Contractors Pty Ltd - Australia
  • TRAFIGURA, South Korea
  • Mintek Dendrill Indonesia
  • BNP Paribas - Singapore
  • Lafarge - France
  • Mercuria Energy - Indonesia
  • Grasim Industreis Ltd - India
  • ICICI Bank Limited - India
  • Oldendorff Carriers - Singapore
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Energy Development Corp, Philippines
  • Thomson Reuters GRC
  • SMC Global Power, Philippines
  • PTC India Limited - India
  • Infraline Energy - India
  • Larsen & Toubro Limited - India
  • Goldman Sachs - Singapore
  • Krishnapatnam Port Company Ltd. - India
  • Central Java Power - Indonesia
  • Economic Council, Georgia
  • Bukit Makmur.PT - Indonesia
  • Commonwealth Bank - Australia
  • Bangkok Bank PCL
  • Sucofindo - Indonesia
  • Ministry of Transport, Egypt
  • Malabar Cements Ltd - India
  • Maharashtra Electricity Regulatory Commission - India
  • Cemex - Philippines
  • Straits Asia Resources Limited - Singapore
  • Indogreen Group - Indonesia
  • IBC Asia (S) Pte Ltd
  • Xstrata Coal
  • CIMB Investment Bank - Malaysia
  • Holcim Trading Pte Ltd - Singapore
  • Ministry of Finance - Indonesia
  • European Bulk Services B.V. - Netherlands
  • Coaltrans Conferences
  • SASOL - South Africa
  • Adani Power Ltd - India
  • Semirara Mining Corp, Philippines
  • Maheswari Brothers Coal Limited - India
  • Cigading International Bulk Terminal - Indonesia
  • Global Green Power PLC Corporation, Philippines
  • SRK Consulting
  • Parliament of New Zealand
  • Karbindo Abesyapradhi - Indoneisa
  • NALCO India
  • Electricity Authority, New Zealand
  • Posco Energy - South Korea
  • J M Baxi & Co - India
  • Orica Mining Services - Indonesia
  • Aditya Birla Group - India
  • Thermax Limited - India
  • New Zealand Coal & Carbon
  • Madhucon Powers Ltd - India
  • Power Finance Corporation Ltd., India
  • HSBC - Hong Kong
  • Anglo American - United Kingdom
  • Binh Thuan Hamico - Vietnam
  • Cement Manufacturers Association - India
  • The Treasury - Australian Government
  • Renaissance Capital - South Africa
  • Kobe Steel Ltd - Japan
  • Sinarmas Energy and Mining - Indonesia
  • Georgia Ports Authority, United States
  • Makarim & Taira - Indonesia
  • Meenaskhi Energy Private Limited - India
  • Jindal Steel & Power Ltd - India
  • Bangladesh Power Developement Board
  • Core Mineral Indonesia
  • Bhatia International Limited - India
  • Edison Trading Spa - Italy
  • Samsung - South Korea
  • The India Cements Ltd
  • PowerSource Philippines DevCo
  • Heidelberg Cement - Germany
  • Platts
  • Bharathi Cement Corporation - India
  • Pendopo Energi Batubara - Indonesia
  • Cardiff University - UK
  • Meralco Power Generation, Philippines
  • GB Group - China
  • Coal India Limited
  • Britmindo - Indonesia
  • Geoservices-GeoAssay Lab
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Marubeni Corporation - India
  • Mitsui
  • Bank of America
  • APGENCO India
  • Barasentosa Lestari - Indonesia
  • GNFC Limited - India
  • PLN - Indonesia
  • Semirara Mining and Power Corporation, Philippines
  • Kartika Selabumi Mining - Indonesia
  • GMR Energy Limited - India
  • Thriveni
  • Bank of China, Malaysia
  • Star Paper Mills Limited - India
  • Mercator Lines Limited - India
  • U S Energy Resources
  • Dalmia Cement Bharat India
  • Enel Italy
  • GAC Shipping (India) Pvt Ltd
  • Sical Logistics Limited - India
  • LBH Netherlands Bv - Netherlands
  • SN Aboitiz Power Inc, Philippines
  • Permata Bank - Indonesia
  • Gujarat Sidhee Cement - India
  • Latin American Coal - Colombia
  • Bahari Cakrawala Sebuku - Indonesia
  • Ceylon Electricity Board - Sri Lanka
  • Africa Commodities Group - South Africa
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Asmin Koalindo Tuhup - Indonesia
  • Sree Jayajothi Cements Limited - India
  • Global Business Power Corporation, Philippines
  • Vedanta Resources Plc - India
  • Banpu Public Company Limited - Thailand
  • McConnell Dowell - Australia
  • Coal Orbis AG
  • Gujarat Electricity Regulatory Commission - India
  • PNOC Exploration Corporation - Philippines
  • Fearnleys - India
  • Toyota Tsusho Corporation, Japan
  • MEC Coal - Indonesia
  • Kideco Jaya Agung - Indonesia
  • Coastal Gujarat Power Limited - India
  • Medco Energi Mining Internasional
  • Qatrana Cement - Jordan
  • Siam City Cement PLC, Thailand
  • Indonesia Power. PT
  • Formosa Plastics Group - Taiwan
  • Surastha Cement
  • JPMorgan - India
  • Cosco
  • TeaM Sual Corporation - Philippines
  • Chamber of Mines of South Africa
  • Central Electricity Authority - India
  • Thiess Contractors Indonesia
  • Bhushan Steel Limited - India
  • Borneo Indobara - Indonesia