LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Thursday, 05 March 20
INDONESIA'S BUKIT ASAM 2019 OUTPUT RISES 10.2% Y/Y - REUTERS
PT Bukit Asam, Indonesia’s state-owned coal miner, said on Wednesday its output in 2019 rose 10.2% to 29.1 million tonnes.   Coa ...


Thursday, 05 March 20
SEEING REMOTELY - IN SAFETY: BUREAU VERITAS PERFORMS FIRST SURVEY BY DRONE - BUREAU VERITAS
Bureau Veritas Marine & Offshore (BV), a world leader in testing, inspection and certification (TIC) services has completed its first survey by ...


Wednesday, 04 March 20
AN EPIDEMIC OF UNCERTAINTY - THE CORONAVIRUS AND FORCE MAJEURE - WFW
KNOWLEDGE TO ELEVATE Do the effects of the coronavirus give rise to legitimate force majeure claims in connection with shipbuilding contracts ...


Wednesday, 04 March 20
CHINA IMPORTED 76.8 MLN TONNES OF CRUDE OIL FOR JANUARY & FEBRUARY 2020; UP 3.4% YOY - REFINITIV | BC
The COVID-19 crisis has been gripping China already for almost two months now. It’s having a huge negative impact on the economy, and this is ...


Wednesday, 04 March 20
MARKET INSIGHT - INTERMODAL
As it was expected, the whole world has been focusing on the spread of the Coronavirus, with the fast outbreak being primarily a massive humanitari ...


   217 218 219 220 221   
Showing 1091 to 1095 news of total 6871
News by Category
Popular News
 
Total Members : 28,705
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • EMO - The Netherlands
  • Metalloyd Limited - United Kingdom
  • Global Business Power Corporation, Philippines
  • TGV SRAAC LIMITED, India
  • SASOL - South Africa
  • Noble Europe Ltd - UK
  • Enel Italy
  • ASAPP Information Group - India
  • Sinarmas Energy and Mining - Indonesia
  • Cigading International Bulk Terminal - Indonesia
  • TNPL - India
  • OCBC - Singapore
  • Mercuria Energy - Indonesia
  • Energy Link Ltd, New Zealand
  • South Luzon Thermal Energy Corporation
  • Aboitiz Power Corporation - Philippines
  • Mechel - Russia
  • Indian Oil Corporation Limited
  • Coal Orbis AG
  • PetroVietnam Power Coal Import and Supply Company
  • McKinsey & Co - India
  • GVK Power & Infra Limited - India
  • Clarksons - UK
  • SMG Consultants - Indonesia
  • JPower - Japan
  • Wilmar Investment Holdings
  • Bukit Asam (Persero) Tbk - Indonesia
  • Billiton Holdings Pty Ltd - Australia
  • The University of Queensland
  • Siam City Cement - Thailand
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Runge Indonesia
  • Indonesia Power. PT
  • Ceylon Electricity Board - Sri Lanka
  • Shree Cement - India
  • Wood Mackenzie - Singapore
  • Bayan Resources Tbk. - Indonesia
  • Straits Asia Resources Limited - Singapore
  • Infraline Energy - India
  • Inco-Indonesia
  • Vitol - Bahrain
  • Electricity Authority, New Zealand
  • Sical Logistics Limited - India
  • Shenhua Group - China
  • Pipit Mutiara Jaya. PT, Indonesia
  • Arch Coal - USA
  • DBS Bank - Singapore
  • International Coal Ventures Pvt Ltd - India
  • Posco Energy - South Korea
  • Iligan Light & Power Inc, Philippines
  • London Commodity Brokers - England
  • U S Energy Resources
  • J M Baxi & Co - India
  • Ernst & Young Pvt. Ltd.
  • Adaro Indonesia
  • Independent Power Producers Association of India
  • Maersk Broker
  • Larsen & Toubro Limited - India
  • Xstrata Coal
  • Thai Mozambique Logistica
  • Petrosea - Indonesia
  • Commonwealth Bank - Australia
  • CCIC - Indonesia
  • Bhushan Steel Limited - India
  • Bulk Trading Sa - Switzerland
  • KEPCO - South Korea
  • The India Cements Ltd
  • Mercator Lines Limited - India
  • Miang Besar Coal Terminal - Indonesia
  • Kapuas Tunggal Persada - Indonesia
  • Directorate General of MIneral and Coal - Indonesia
  • Qatrana Cement - Jordan
  • Central Electricity Authority - India
  • Mitra SK Pvt Ltd - India
  • Gujarat Electricity Regulatory Commission - India
  • Bahari Cakrawala Sebuku - Indonesia
  • Renaissance Capital - South Africa
  • Samtan Co., Ltd - South Korea
  • NTPC Limited - India
  • Timah Investasi Mineral - Indoneisa
  • Riau Bara Harum - Indonesia
  • Interocean Group of Companies - India
  • Pinang Coal Indonesia
  • Coal India Limited
  • Formosa Plastics Group - Taiwan
  • PLN - Indonesia
  • Cebu Energy, Philippines
  • Sucofindo - Indonesia
  • Maheswari Brothers Coal Limited - India
  • IOL Indonesia
  • Vizag Seaport Private Limited - India
  • The State Trading Corporation of India Ltd
  • Medco Energi Mining Internasional
  • Tanito Harum - Indonesia
  • India Bulls Power Limited - India
  • Simpson Spence & Young - Indonesia
  • BRS Brokers - Singapore
  • OPG Power Generation Pvt Ltd - India
  • Mjunction Services Limited - India
  • Bank of America
  • San Jose City I Power Corp, Philippines
  • Tata Power - India
  • GMR Energy Limited - India
  • Total Coal South Africa
  • Videocon Industries ltd - India
  • Bhoruka Overseas - Indonesia
  • Eastern Energy - Thailand
  • Indo Tambangraya Megah - Indonesia
  • Karbindo Abesyapradhi - Indoneisa
  • TANGEDCO India
  • Cargill India Pvt Ltd
  • UOB Asia (HK) Ltd
  • Globalindo Alam Lestari - Indonesia
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Latin American Coal - Colombia
  • Idemitsu - Japan
  • Indian Energy Exchange, India
  • Maharashtra Electricity Regulatory Commission - India
  • Samsung - South Korea
  • Jatenergy - Australia
  • Gresik Semen - Indonesia
  • Carbofer General Trading SA - India
  • The Treasury - Australian Government
  • Chamber of Mines of South Africa
  • Ince & co LLP
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Antam Resourcindo - Indonesia
  • Star Paper Mills Limited - India
  • MEC Coal - Indonesia
  • Port Waratah Coal Services - Australia
  • Madhucon Powers Ltd - India
  • Agrawal Coal Company - India
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Indonesian Coal Mining Association
  • Goldman Sachs - Singapore
  • Global Green Power PLC Corporation, Philippines
  • Inspectorate - India
  • Thailand Anthracite
  • Price Waterhouse Coopers - Russia
  • AsiaOL BioFuels Corp., Philippines
  • Merrill Lynch Bank
  • World Coal - UK
  • Australian Commodity Traders Exchange
  • Permata Bank - Indonesia
  • Central Java Power - Indonesia
  • Thiess Contractors Indonesia
  • Asmin Koalindo Tuhup - Indonesia
  • SMC Global Power, Philippines
  • Holcim Trading Pte Ltd - Singapore
  • Sojitz Corporation - Japan
  • IBC Asia (S) Pte Ltd
  • Heidelberg Cement - Germany
  • Cement Manufacturers Association - India
  • Meenaskhi Energy Private Limited - India
  • SGS (Thailand) Limited
  • Australian Coal Association
  • Kaltim Prima Coal - Indonesia
  • Trasteel International SA, Italy
  • European Bulk Services B.V. - Netherlands
  • Parliament of New Zealand
  • UBS Singapore
  • JPMorgan - India
  • Humpuss - Indonesia
  • GNFC Limited - India
  • Britmindo - Indonesia
  • GB Group - China
  • Russian Coal LLC
  • Freeport Indonesia
  • Core Mineral Indonesia
  • Bukit Baiduri Energy - Indonesia
  • Cemex - Philippines
  • Petrochimia International Co. Ltd.- Taiwan
  • Asia Cement - Taiwan
  • Orica Mining Services - Indonesia
  • Oldendorff Carriers - Singapore
  • NALCO India
  • Sarangani Energy Corporation, Philippines
  • Coal and Oil Company - UAE
  • GHCL Limited - India
  • EIA - United States
  • Kohat Cement Company Ltd. - Pakistan
  • Global Coal Blending Company Limited - Australia
  • KPCL - India
  • Salva Resources Pvt Ltd - India
  • Barasentosa Lestari - Indonesia
  • Therma Luzon, Inc, Philippines
  • IHS Mccloskey Coal Group - USA
  • Semirara Mining and Power Corporation, Philippines
  • Coastal Gujarat Power Limited - India
  • Binh Thuan Hamico - Vietnam
  • Rio Tinto Coal - Australia
  • Marubeni Corporation - India
  • McConnell Dowell - Australia
  • Energy Development Corp, Philippines
  • Alfred C Toepfer International GmbH - Germany
  • Surastha Cement
  • Fearnleys - India
  • Mitsui
  • Thomson Reuters GRC
  • Karaikal Port Pvt Ltd - India
  • Ind-Barath Power Infra Limited - India
  • GAC Shipping (India) Pvt Ltd
  • Panama Canal Authority
  • Glencore India Pvt. Ltd
  • Cardiff University - UK
  • Grasim Industreis Ltd - India
  • Singapore Mercantile Exchange
  • Gupta Coal India Ltd
  • PowerSource Philippines DevCo
  • Deutsche Bank - India
  • CESC Limited - India
  • Aditya Birla Group - India
  • Indorama - Singapore
  • WorleyParsons
  • Edison Trading Spa - Italy
  • Semirara Mining Corp, Philippines
  • KOWEPO - South Korea
  • Georgia Ports Authority, United States
  • Indogreen Group - Indonesia
  • Jindal Steel & Power Ltd - India
  • Eastern Coal Council - USA
  • SRK Consulting
  • SN Aboitiz Power Inc, Philippines
  • Indian School of Mines
  • New Zealand Coal & Carbon
  • TeaM Sual Corporation - Philippines
  • VISA Power Limited - India
  • LBH Netherlands Bv - Netherlands
  • Africa Commodities Group - South Africa
  • Mitsubishi Corporation
  • Ministry of Transport, Egypt
  • Kalimantan Lumbung Energi - Indonesia
  • Lanco Infratech Ltd - India
  • Merrill Lynch Commodities Europe
  • Minerals Council of Australia
  • GN Power Mariveles Coal Plant, Philippines
  • ACC Limited - India
  • Platou - Singapore
  • Toyota Tsusho Corporation, Japan
  • Maybank - Singapore
  • Economic Council, Georgia
  • APGENCO India
  • ETA - Dubai
  • MS Steel International - UAE
  • Arutmin Indonesia
  • KPMG - USA
  • Savvy Resources Ltd - HongKong
  • Cosco
  • Lafarge - France
  • Bukit Makmur.PT - Indonesia
  • Asian Development Bank
  • Intertek Mineral Services - Indonesia
  • Directorate Of Revenue Intelligence - India
  • CoalTek, United States
  • ICICI Bank Limited - India
  • Bangladesh Power Developement Board
  • CNBM International Corporation - China
  • Jaiprakash Power Ventures ltd
  • Jorong Barutama Greston.PT - Indonesia
  • Vijayanagar Sugar Pvt Ltd - India
  • Coalindo Energy - Indonesia
  • Coeclerici Indonesia
  • Malabar Cements Ltd - India
  • Ministry of Mines - Canada
  • Barclays Capital - USA
  • Gujarat Mineral Development Corp Ltd - India
  • Pendopo Energi Batubara - Indonesia
  • Manunggal Multi Energi - Indonesia
  • Planning Commission, India
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Essar Steel Hazira Ltd - India
  • Borneo Indobara - Indonesia
  • Maruti Cements - India
  • Tamil Nadu electricity Board
  • Chettinad Cement Corporation Ltd - India
  • Bhatia International Limited - India
  • globalCOAL - UK
  • Kartika Selabumi Mining - Indonesia
  • Siam City Cement PLC, Thailand
  • Meralco Power Generation, Philippines
  • Deloitte Consulting - India
  • Uttam Galva Steels Limited - India
  • Japan Coal Energy Center
  • Baramulti Group, Indonesia
  • Platts
  • Ministry of Finance - Indonesia
  • ANZ Bank - Australia
  • Leighton Contractors Pty Ltd - Australia
  • Geoservices-GeoAssay Lab
  • ING Bank NV - Singapore
  • Berau Coal - Indonesia
  • Kumho Petrochemical, South Korea
  • Sree Jayajothi Cements Limited - India
  • Bangkok Bank PCL
  • PNOC Exploration Corporation - Philippines
  • bp singapore
  • PTC India Limited - India
  • CIMB Investment Bank - Malaysia
  • Banpu Public Company Limited - Thailand
  • Rashtriya Ispat Nigam Limited - India
  • Electricity Generating Authority of Thailand
  • Mintek Dendrill Indonesia
  • BNP Paribas - Singapore
  • Peabody Energy - USA
  • Bharathi Cement Corporation - India
  • Sindya Power Generating Company Private Ltd
  • Petron Corporation, Philippines
  • Power Finance Corporation Ltd., India
  • Romanian Commodities Exchange
  • IMC Shipping - Singapore
  • Thriveni
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • RBS Sempra - UK
  • TRAFIGURA, South Korea
  • Vale Mozambique
  • Dalmia Cement Bharat India
  • Makarim & Taira - Indonesia
  • Xindia Steels Limited - India
  • Parry Sugars Refinery, India
  • IEA Clean Coal Centre - UK
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • World Bank
  • Argus Media - Singapore
  • Kepco SPC Power Corporation, Philippines
  • Attock Cement Pakistan Limited
  • Standard Chartered Bank - UAE
  • Moodys - Singapore
  • Vedanta Resources Plc - India
  • Rudhra Energy - India
  • Orica Australia Pty. Ltd.
  • Reliance Power - India
  • HSBC - Hong Kong
  • Anglo American - United Kingdom
  • TNB Fuel Sdn Bhd - Malaysia
  • Bank of China, Malaysia
  • Indika Energy - Indonesia
  • Krishnapatnam Port Company Ltd. - India
  • Thermax Limited - India
  • Neyveli Lignite Corporation Ltd, - India
  • Kobexindo Tractors - Indoneisa
  • Coaltrans Conferences
  • Gujarat Sidhee Cement - India
  • Kobe Steel Ltd - Japan
  • Altura Mining Limited, Indonesia
  • Credit Suisse - India
  • Kideco Jaya Agung - Indonesia
  • Adani Power Ltd - India
  • Ambuja Cements Ltd - India
  • PetroVietnam
  • Malco - India
  • Tata Chemicals Ltd - India
  • Sakthi Sugars Limited - India
  • SUEK AG - Indonesia
  • White Energy Company Limited
  • PLN Batubara - Indonesia