LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Tuesday, 07 April 20
IS CHINA EMBARKING ON A MAJOR EXPANSION OF COAL-FIRED POWER GENERATION? - WOOD MACKENZIE
As energy companies worldwide grapple with the economic impact of the coronavirus pandemic, long-term planning continues. Ahead of the release of t ...


Tuesday, 07 April 20
COAL INDIA'S DISPATCHES DROP, OUTPUT INCREASES - THE HINDU
India’s largest coal producer Coal India Ltd. (CIL) has seen a 10% fall in dispatches in March 2020 due to a sharp fall in demand from the po ...


Tuesday, 07 April 20
CORONAVIRUS AND LOCKDOWNS DRAG DOWN THE INDONESIAN COAL PRICE REFERENCE IN APRIL
COALspot.com: The Ministry of Energy and Mineral Resources of the Republic of Indonesia has revised down the benchmark price of the Indonesian ther ...


Monday, 06 April 20
A 52,000DWT SHIP FIXING DELIVERY SINGAPORE TRIP, VIA INDONESIA, REDELIVERY TAIWAN, AT $3,100 - BALTIC BRIEFING
Capesize The Capesize market this past week looks to have come off life support and found some improved sentiment. The week began rather ordina ...


Monday, 06 April 20
INDIA'S 21-DAY LOCKDOWN - IMPACT ON COMMODITIES? - WOOD MACKENZIE
India is under a three-week lockdown from 25 March, to contain the spread of the coronavirus outbreak. Wood Mackenzie analysts discuss what this me ...


   204 205 206 207 208   
Showing 1026 to 1030 news of total 6871
News by Category
Popular News
 
Total Members : 28,617
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Enel Italy
  • Anglo American - United Kingdom
  • ING Bank NV - Singapore
  • GB Group - China
  • The State Trading Corporation of India Ltd
  • Clarksons - UK
  • Uttam Galva Steels Limited - India
  • Port Waratah Coal Services - Australia
  • Sree Jayajothi Cements Limited - India
  • Permata Bank - Indonesia
  • Global Green Power PLC Corporation, Philippines
  • Grasim Industreis Ltd - India
  • Moodys - Singapore
  • IBC Asia (S) Pte Ltd
  • Ministry of Mines - Canada
  • GVK Power & Infra Limited - India
  • bp singapore
  • Coal India Limited
  • Lanco Infratech Ltd - India
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Lafarge - France
  • SN Aboitiz Power Inc, Philippines
  • Larsen & Toubro Limited - India
  • Riau Bara Harum - Indonesia
  • Ministry of Finance - Indonesia
  • Central Java Power - Indonesia
  • Cardiff University - UK
  • SRK Consulting
  • Bhatia International Limited - India
  • ACC Limited - India
  • Parry Sugars Refinery, India
  • Mercuria Energy - Indonesia
  • Reliance Power - India
  • Makarim & Taira - Indonesia
  • Indo Tambangraya Megah - Indonesia
  • Salva Resources Pvt Ltd - India
  • Arutmin Indonesia
  • Economic Council, Georgia
  • OPG Power Generation Pvt Ltd - India
  • Krishnapatnam Port Company Ltd. - India
  • India Bulls Power Limited - India
  • Geoservices-GeoAssay Lab
  • Gupta Coal India Ltd
  • Bulk Trading Sa - Switzerland
  • TANGEDCO India
  • Thriveni
  • European Bulk Services B.V. - Netherlands
  • Malco - India
  • GHCL Limited - India
  • Eastern Energy - Thailand
  • TeaM Sual Corporation - Philippines
  • Gujarat Mineral Development Corp Ltd - India
  • RBS Sempra - UK
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Thomson Reuters GRC
  • KPMG - USA
  • Africa Commodities Group - South Africa
  • Posco Energy - South Korea
  • GNFC Limited - India
  • Noble Europe Ltd - UK
  • Minerals Council of Australia
  • Russian Coal LLC
  • Coal Orbis AG
  • Aditya Birla Group - India
  • MS Steel International - UAE
  • IOL Indonesia
  • Meralco Power Generation, Philippines
  • Coastal Gujarat Power Limited - India
  • Maersk Broker
  • Singapore Mercantile Exchange
  • Glencore India Pvt. Ltd
  • Manunggal Multi Energi - Indonesia
  • LBH Netherlands Bv - Netherlands
  • Semirara Mining and Power Corporation, Philippines
  • Globalindo Alam Lestari - Indonesia
  • IEA Clean Coal Centre - UK
  • Pinang Coal Indonesia
  • Toyota Tsusho Corporation, Japan
  • Bank of America
  • Petrosea - Indonesia
  • Agrawal Coal Company - India
  • PLN - Indonesia
  • Antam Resourcindo - Indonesia
  • Tata Power - India
  • Georgia Ports Authority, United States
  • San Jose City I Power Corp, Philippines
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Coal and Oil Company - UAE
  • Britmindo - Indonesia
  • Credit Suisse - India
  • CoalTek, United States
  • Kobe Steel Ltd - Japan
  • PetroVietnam
  • Mintek Dendrill Indonesia
  • Semirara Mining Corp, Philippines
  • OCBC - Singapore
  • South Luzon Thermal Energy Corporation
  • Humpuss - Indonesia
  • Energy Link Ltd, New Zealand
  • PowerSource Philippines DevCo
  • Indian Oil Corporation Limited
  • Essar Steel Hazira Ltd - India
  • ANZ Bank - Australia
  • Petrochimia International Co. Ltd.- Taiwan
  • Idemitsu - Japan
  • Parliament of New Zealand
  • Intertek Mineral Services - Indonesia
  • APGENCO India
  • Asia Cement - Taiwan
  • Tanito Harum - Indonesia
  • Karbindo Abesyapradhi - Indoneisa
  • Kaltim Prima Coal - Indonesia
  • Independent Power Producers Association of India
  • Thai Mozambique Logistica
  • Bangkok Bank PCL
  • Kumho Petrochemical, South Korea
  • Kapuas Tunggal Persada - Indonesia
  • Bank of China, Malaysia
  • Mitsubishi Corporation
  • PLN Batubara - Indonesia
  • Maheswari Brothers Coal Limited - India
  • Berau Coal - Indonesia
  • UOB Asia (HK) Ltd
  • The India Cements Ltd
  • Directorate Of Revenue Intelligence - India
  • Simpson Spence & Young - Indonesia
  • Bayan Resources Tbk. - Indonesia
  • GMR Energy Limited - India
  • Surastha Cement
  • Panama Canal Authority
  • Dalmia Cement Bharat India
  • Tata Chemicals Ltd - India
  • Jatenergy - Australia
  • Kohat Cement Company Ltd. - Pakistan
  • Platts
  • SMG Consultants - Indonesia
  • Oldendorff Carriers - Singapore
  • Australian Coal Association
  • Ceylon Electricity Board - Sri Lanka
  • Ernst & Young Pvt. Ltd.
  • KOWEPO - South Korea
  • Orica Australia Pty. Ltd.
  • Therma Luzon, Inc, Philippines
  • Vizag Seaport Private Limited - India
  • Attock Cement Pakistan Limited
  • Price Waterhouse Coopers - Russia
  • Freeport Indonesia
  • HSBC - Hong Kong
  • Merrill Lynch Commodities Europe
  • Merrill Lynch Bank
  • IMC Shipping - Singapore
  • Wilmar Investment Holdings
  • Commonwealth Bank - Australia
  • Binh Thuan Hamico - Vietnam
  • Indian Energy Exchange, India
  • Wood Mackenzie - Singapore
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Cargill India Pvt Ltd
  • Medco Energi Mining Internasional
  • Sical Logistics Limited - India
  • Jindal Steel & Power Ltd - India
  • Directorate General of MIneral and Coal - Indonesia
  • Indonesian Coal Mining Association
  • Deutsche Bank - India
  • Maybank - Singapore
  • Indogreen Group - Indonesia
  • VISA Power Limited - India
  • Barasentosa Lestari - Indonesia
  • Gujarat Electricity Regulatory Commission - India
  • McKinsey & Co - India
  • Vitol - Bahrain
  • Bukit Makmur.PT - Indonesia
  • Cemex - Philippines
  • Platou - Singapore
  • Malabar Cements Ltd - India
  • ICICI Bank Limited - India
  • Alfred C Toepfer International GmbH - Germany
  • Sucofindo - Indonesia
  • Japan Coal Energy Center
  • MEC Coal - Indonesia
  • The University of Queensland
  • Romanian Commodities Exchange
  • Bhushan Steel Limited - India
  • Central Electricity Authority - India
  • Gujarat Sidhee Cement - India
  • White Energy Company Limited
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • CIMB Investment Bank - Malaysia
  • Sinarmas Energy and Mining - Indonesia
  • Maruti Cements - India
  • Xstrata Coal
  • Thermax Limited - India
  • Inco-Indonesia
  • globalCOAL - UK
  • Pipit Mutiara Jaya. PT, Indonesia
  • Kartika Selabumi Mining - Indonesia
  • Chettinad Cement Corporation Ltd - India
  • Coaltrans Conferences
  • Baramulti Group, Indonesia
  • Ind-Barath Power Infra Limited - India
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • JPower - Japan
  • Vedanta Resources Plc - India
  • Bhoruka Overseas - Indonesia
  • Shenhua Group - China
  • Carbofer General Trading SA - India
  • Edison Trading Spa - Italy
  • Adaro Indonesia
  • Runge Indonesia
  • Billiton Holdings Pty Ltd - Australia
  • Rudhra Energy - India
  • Ambuja Cements Ltd - India
  • Iligan Light & Power Inc, Philippines
  • Inspectorate - India
  • ASAPP Information Group - India
  • DBS Bank - Singapore
  • Bahari Cakrawala Sebuku - Indonesia
  • Neyveli Lignite Corporation Ltd, - India
  • SGS (Thailand) Limited
  • Cosco
  • PetroVietnam Power Coal Import and Supply Company
  • World Coal - UK
  • Mechel - Russia
  • WorleyParsons
  • Samtan Co., Ltd - South Korea
  • Ince & co LLP
  • Sarangani Energy Corporation, Philippines
  • Siam City Cement - Thailand
  • Bharathi Cement Corporation - India
  • EMO - The Netherlands
  • Videocon Industries ltd - India
  • Energy Development Corp, Philippines
  • UBS Singapore
  • Bukit Asam (Persero) Tbk - Indonesia
  • Mjunction Services Limited - India
  • Jorong Barutama Greston.PT - Indonesia
  • Coalindo Energy - Indonesia
  • Borneo Indobara - Indonesia
  • Banpu Public Company Limited - Thailand
  • Peabody Energy - USA
  • Pendopo Energi Batubara - Indonesia
  • GAC Shipping (India) Pvt Ltd
  • Karaikal Port Pvt Ltd - India
  • Timah Investasi Mineral - Indoneisa
  • Infraline Energy - India
  • Savvy Resources Ltd - HongKong
  • Star Paper Mills Limited - India
  • Latin American Coal - Colombia
  • GN Power Mariveles Coal Plant, Philippines
  • CNBM International Corporation - China
  • Mitsui
  • Sakthi Sugars Limited - India
  • CCIC - Indonesia
  • Xindia Steels Limited - India
  • Mercator Lines Limited - India
  • Leighton Contractors Pty Ltd - Australia
  • SASOL - South Africa
  • Vale Mozambique
  • Orica Mining Services - Indonesia
  • Eastern Coal Council - USA
  • Maharashtra Electricity Regulatory Commission - India
  • Goldman Sachs - Singapore
  • Gresik Semen - Indonesia
  • Asian Development Bank
  • Trasteel International SA, Italy
  • BRS Brokers - Singapore
  • Power Finance Corporation Ltd., India
  • Core Mineral Indonesia
  • Kalimantan Lumbung Energi - Indonesia
  • Interocean Group of Companies - India
  • Cebu Energy, Philippines
  • Asmin Koalindo Tuhup - Indonesia
  • International Coal Ventures Pvt Ltd - India
  • Miang Besar Coal Terminal - Indonesia
  • Tamil Nadu electricity Board
  • Thiess Contractors Indonesia
  • Kideco Jaya Agung - Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • U S Energy Resources
  • SUEK AG - Indonesia
  • Australian Commodity Traders Exchange
  • Ministry of Transport, Egypt
  • Aboitiz Power Corporation - Philippines
  • Madhucon Powers Ltd - India
  • Global Business Power Corporation, Philippines
  • Rio Tinto Coal - Australia
  • Qatrana Cement - Jordan
  • Sojitz Corporation - Japan
  • Formosa Plastics Group - Taiwan
  • Samsung - South Korea
  • Coeclerici Indonesia
  • The Treasury - Australian Government
  • Kobexindo Tractors - Indoneisa
  • Electricity Generating Authority of Thailand
  • Standard Chartered Bank - UAE
  • Indorama - Singapore
  • AsiaOL BioFuels Corp., Philippines
  • Planning Commission, India
  • Indika Energy - Indonesia
  • Global Coal Blending Company Limited - Australia
  • Cement Manufacturers Association - India
  • Thailand Anthracite
  • Jaiprakash Power Ventures ltd
  • Cigading International Bulk Terminal - Indonesia
  • KEPCO - South Korea
  • BNP Paribas - Singapore
  • Marubeni Corporation - India
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Barclays Capital - USA
  • TRAFIGURA, South Korea
  • Deloitte Consulting - India
  • Meenaskhi Energy Private Limited - India
  • EIA - United States
  • London Commodity Brokers - England
  • Vijayanagar Sugar Pvt Ltd - India
  • World Bank
  • PTC India Limited - India
  • SMC Global Power, Philippines
  • KPCL - India
  • Indonesia Power. PT
  • Petron Corporation, Philippines
  • Altura Mining Limited, Indonesia
  • IHS Mccloskey Coal Group - USA
  • Renaissance Capital - South Africa
  • Adani Power Ltd - India
  • Shree Cement - India
  • JPMorgan - India
  • Indian School of Mines
  • Fearnleys - India
  • NALCO India
  • Total Coal South Africa
  • Straits Asia Resources Limited - Singapore
  • Holcim Trading Pte Ltd - Singapore
  • Arch Coal - USA
  • PNOC Exploration Corporation - Philippines
  • New Zealand Coal & Carbon
  • NTPC Limited - India
  • Argus Media - Singapore
  • Electricity Authority, New Zealand
  • Metalloyd Limited - United Kingdom
  • Bangladesh Power Developement Board
  • CESC Limited - India
  • TGV SRAAC LIMITED, India
  • ETA - Dubai
  • Heidelberg Cement - Germany
  • TNPL - India
  • Sindya Power Generating Company Private Ltd
  • TNB Fuel Sdn Bhd - Malaysia
  • Kepco SPC Power Corporation, Philippines
  • Siam City Cement PLC, Thailand
  • Chamber of Mines of South Africa
  • Bukit Baiduri Energy - Indonesia
  • J M Baxi & Co - India
  • McConnell Dowell - Australia
  • Mitra SK Pvt Ltd - India