COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Friday, 01 May 20
GLOBAL COAL DEMAND TO FALL BY 8% IN Q1 2020 RELATIVE TO Q1 2019 - IEA
We expect global coal demand to fall by 8% in Q1 2020 relative to Q1 2019. This significant drop was driven by lower demand in the electricity sect ...


Friday, 01 May 20
LUKOIL SHARES LUBRICANT EXPERIENCE AFTER FIRST 100 DAYS OF OPERATION ON VLSFO
KNOWLEDGE TO ELEVATE After 100 days of VLSFO operation, LUKOIL Marine Lubricants is sharing recent experience on VLSFO operation with NAVIGO M ...


Wednesday, 29 April 20
OIL CLOSES IN ON PEAK OVERSUPPLY - WOOD MACKENZIE
Are we now deep in the abyss? Up to our necks in it, if the oil price is any guide. Brent has now tested sub-US$20/bbl in this downturn and WTI sub ...


Monday, 27 April 20
INCIDENT INVESTIGATION: SEARCH FOR THE CAUSE, NOT THE VILLAIN - GARD
Incident investigations often conclude with placing the blame for an incident on the crew. Causes of the incidents are usually identified as proced ...


Monday, 27 April 20
A 58,000DWT VESSEL WAS FIXED DELIVERY SINGAPORE TRIP VIA INDONESIA, RE-DELIVERY WC INDIA, AT $4,500 - BALTIC BRIEFING
Capesize The tide turned this week for the Capesize market, as voyage rates registered dramatically falling fuel costs. This was led primarily ...


   198 199 200 201 202   
Showing 996 to 1000 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Uttam Galva Steels Limited - India
  • Mitra SK Pvt Ltd - India
  • Indian School of Mines
  • Gupta Coal India Ltd
  • Samtan Co., Ltd - South Korea
  • Attock Cement Pakistan Limited
  • Therma Luzon, Inc, Philippines
  • Moodys - Singapore
  • Xstrata Coal
  • The State Trading Corporation of India Ltd
  • UOB Asia (HK) Ltd
  • Oldendorff Carriers - Singapore
  • Malco - India
  • Coal Orbis AG
  • Sucofindo - Indonesia
  • Cargill India Pvt Ltd
  • Petron Corporation, Philippines
  • TNPL - India
  • Cebu Energy, Philippines
  • Mitsubishi Corporation
  • Marubeni Corporation - India
  • The India Cements Ltd
  • Cigading International Bulk Terminal - Indonesia
  • Fearnleys - India
  • Kaltim Prima Coal - Indonesia
  • Inspectorate - India
  • Argus Media - Singapore
  • Binh Thuan Hamico - Vietnam
  • Interocean Group of Companies - India
  • Indonesia Power. PT
  • Asian Development Bank
  • Jorong Barutama Greston.PT - Indonesia
  • Iligan Light & Power Inc, Philippines
  • Sindya Power Generating Company Private Ltd
  • SGS (Thailand) Limited
  • Thermax Limited - India
  • Straits Asia Resources Limited - Singapore
  • Mitsui
  • Intertek Mineral Services - Indonesia
  • Essar Steel Hazira Ltd - India
  • Electricity Generating Authority of Thailand
  • Formosa Plastics Group - Taiwan
  • Heidelberg Cement - Germany
  • Noble Europe Ltd - UK
  • Posco Energy - South Korea
  • TeaM Sual Corporation - Philippines
  • TRAFIGURA, South Korea
  • Ince & co LLP
  • Riau Bara Harum - Indonesia
  • India Bulls Power Limited - India
  • Aboitiz Power Corporation - Philippines
  • Global Coal Blending Company Limited - Australia
  • Sinarmas Energy and Mining - Indonesia
  • Kideco Jaya Agung - Indonesia
  • SMG Consultants - Indonesia
  • Enel Italy
  • Arutmin Indonesia
  • Global Green Power PLC Corporation, Philippines
  • Star Paper Mills Limited - India
  • Rashtriya Ispat Nigam Limited - India
  • PTC India Limited - India
  • Freeport Indonesia
  • Semirara Mining Corp, Philippines
  • Banpu Public Company Limited - Thailand
  • TNB Fuel Sdn Bhd - Malaysia
  • Economic Council, Georgia
  • Minerals Council of Australia
  • Shree Cement - India
  • Thriveni
  • Bank of China, Malaysia
  • Bahari Cakrawala Sebuku - Indonesia
  • Deutsche Bank - India
  • Vizag Seaport Private Limited - India
  • Bukit Asam (Persero) Tbk - Indonesia
  • Tata Power - India
  • New Zealand Coal & Carbon
  • Inco-Indonesia
  • Sojitz Corporation - Japan
  • Coal and Oil Company - UAE
  • KPCL - India
  • Billiton Holdings Pty Ltd - Australia
  • globalCOAL - UK
  • Bukit Baiduri Energy - Indonesia
  • Coal India Limited
  • Cemex - Philippines
  • South Luzon Thermal Energy Corporation
  • Mintek Dendrill Indonesia
  • Adani Power Ltd - India
  • Merrill Lynch Bank
  • APGENCO India
  • Independent Power Producers Association of India
  • Savvy Resources Ltd - HongKong
  • Barclays Capital - USA
  • Krishnapatnam Port Company Ltd. - India
  • SN Aboitiz Power Inc, Philippines
  • Sarangani Energy Corporation, Philippines
  • Coaltrans Conferences
  • Vijayanagar Sugar Pvt Ltd - India
  • Barasentosa Lestari - Indonesia
  • DBS Bank - Singapore
  • Australian Commodity Traders Exchange
  • PLN - Indonesia
  • CNBM International Corporation - China
  • Panama Canal Authority
  • PNOC Exploration Corporation - Philippines
  • Salva Resources Pvt Ltd - India
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Britmindo - Indonesia
  • Orica Mining Services - Indonesia
  • Thailand Anthracite
  • Gujarat Sidhee Cement - India
  • GVK Power & Infra Limited - India
  • Chettinad Cement Corporation Ltd - India
  • Asmin Koalindo Tuhup - Indonesia
  • Eastern Energy - Thailand
  • Maheswari Brothers Coal Limited - India
  • Directorate General of MIneral and Coal - Indonesia
  • Ministry of Transport, Egypt
  • Central Electricity Authority - India
  • Adaro Indonesia
  • Indian Oil Corporation Limited
  • Madhucon Powers Ltd - India
  • Humpuss - Indonesia
  • RBS Sempra - UK
  • Russian Coal LLC
  • PowerSource Philippines DevCo
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Cardiff University - UK
  • Maersk Broker
  • Indika Energy - Indonesia
  • EIA - United States
  • GN Power Mariveles Coal Plant, Philippines
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Holcim Trading Pte Ltd - Singapore
  • Vedanta Resources Plc - India
  • Indonesian Coal Mining Association
  • Surastha Cement
  • Clarksons - UK
  • San Jose City I Power Corp, Philippines
  • Mechel - Russia
  • IEA Clean Coal Centre - UK
  • Bukit Makmur.PT - Indonesia
  • Bhoruka Overseas - Indonesia
  • Gresik Semen - Indonesia
  • Indorama - Singapore
  • Australian Coal Association
  • Pendopo Energi Batubara - Indonesia
  • Idemitsu - Japan
  • Cement Manufacturers Association - India
  • Dalmia Cement Bharat India
  • IHS Mccloskey Coal Group - USA
  • Power Finance Corporation Ltd., India
  • JPower - Japan
  • OPG Power Generation Pvt Ltd - India
  • BNP Paribas - Singapore
  • Kobe Steel Ltd - Japan
  • Africa Commodities Group - South Africa
  • SMC Global Power, Philippines
  • SASOL - South Africa
  • World Bank
  • Rudhra Energy - India
  • Coalindo Energy - Indonesia
  • GAC Shipping (India) Pvt Ltd
  • Jindal Steel & Power Ltd - India
  • Xindia Steels Limited - India
  • bp singapore
  • Lafarge - France
  • NALCO India
  • Ambuja Cements Ltd - India
  • Larsen & Toubro Limited - India
  • Sical Logistics Limited - India
  • Bulk Trading Sa - Switzerland
  • Alfred C Toepfer International GmbH - Germany
  • ING Bank NV - Singapore
  • London Commodity Brokers - England
  • Petrochimia International Co. Ltd.- Taiwan
  • GMR Energy Limited - India
  • Parry Sugars Refinery, India
  • Indogreen Group - Indonesia
  • Mercuria Energy - Indonesia
  • Makarim & Taira - Indonesia
  • GNFC Limited - India
  • KOWEPO - South Korea
  • Glencore India Pvt. Ltd
  • Kalimantan Lumbung Energi - Indonesia
  • SRK Consulting
  • J M Baxi & Co - India
  • Mercator Lines Limited - India
  • Malabar Cements Ltd - India
  • Simpson Spence & Young - Indonesia
  • Bhushan Steel Limited - India
  • Karaikal Port Pvt Ltd - India
  • Siam City Cement PLC, Thailand
  • PetroVietnam
  • CIMB Investment Bank - Malaysia
  • Bharathi Cement Corporation - India
  • Sree Jayajothi Cements Limited - India
  • Kepco SPC Power Corporation, Philippines
  • Sakthi Sugars Limited - India
  • ETA - Dubai
  • Peabody Energy - USA
  • Standard Chartered Bank - UAE
  • Port Waratah Coal Services - Australia
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Agrawal Coal Company - India
  • Jaiprakash Power Ventures ltd
  • Grasim Industreis Ltd - India
  • Kumho Petrochemical, South Korea
  • Toyota Tsusho Corporation, Japan
  • Lanco Infratech Ltd - India
  • Samsung - South Korea
  • KPMG - USA
  • Borneo Indobara - Indonesia
  • Edison Trading Spa - Italy
  • IMC Shipping - Singapore
  • BRS Brokers - Singapore
  • Coeclerici Indonesia
  • Tamil Nadu electricity Board
  • Japan Coal Energy Center
  • Maruti Cements - India
  • Siam City Cement - Thailand
  • OCBC - Singapore
  • Anglo American - United Kingdom
  • Core Mineral Indonesia
  • Maybank - Singapore
  • CCIC - Indonesia
  • LBH Netherlands Bv - Netherlands
  • Tanito Harum - Indonesia
  • Globalindo Alam Lestari - Indonesia
  • European Bulk Services B.V. - Netherlands
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Gujarat Electricity Regulatory Commission - India
  • Latin American Coal - Colombia
  • ANZ Bank - Australia
  • Pipit Mutiara Jaya. PT, Indonesia
  • Chamber of Mines of South Africa
  • Energy Development Corp, Philippines
  • Leighton Contractors Pty Ltd - Australia
  • Neyveli Lignite Corporation Ltd, - India
  • Antam Resourcindo - Indonesia
  • Bangkok Bank PCL
  • Maharashtra Electricity Regulatory Commission - India
  • Coastal Gujarat Power Limited - India
  • Indo Tambangraya Megah - Indonesia
  • VISA Power Limited - India
  • Carbofer General Trading SA - India
  • Wilmar Investment Holdings
  • Karbindo Abesyapradhi - Indoneisa
  • AsiaOL BioFuels Corp., Philippines
  • The Treasury - Australian Government
  • Semirara Mining and Power Corporation, Philippines
  • Bangladesh Power Developement Board
  • McConnell Dowell - Australia
  • Kobexindo Tractors - Indoneisa
  • Altura Mining Limited, Indonesia
  • Kohat Cement Company Ltd. - Pakistan
  • Bayan Resources Tbk. - Indonesia
  • White Energy Company Limited
  • Tata Chemicals Ltd - India
  • Manunggal Multi Energi - Indonesia
  • Videocon Industries ltd - India
  • The University of Queensland
  • Vitol - Bahrain
  • McKinsey & Co - India
  • Ceylon Electricity Board - Sri Lanka
  • Vale Mozambique
  • GB Group - China
  • Rio Tinto Coal - Australia
  • Qatrana Cement - Jordan
  • Planning Commission, India
  • GHCL Limited - India
  • CESC Limited - India
  • Gujarat Mineral Development Corp Ltd - India
  • Bhatia International Limited - India
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Thai Mozambique Logistica
  • Thiess Contractors Indonesia
  • WorleyParsons
  • Infraline Energy - India
  • ASAPP Information Group - India
  • Total Coal South Africa
  • Meralco Power Generation, Philippines
  • U S Energy Resources
  • Permata Bank - Indonesia
  • Thomson Reuters GRC
  • MEC Coal - Indonesia
  • PetroVietnam Power Coal Import and Supply Company
  • Georgia Ports Authority, United States
  • Energy Link Ltd, New Zealand
  • Ministry of Mines - Canada
  • Platou - Singapore
  • International Coal Ventures Pvt Ltd - India
  • Mjunction Services Limited - India
  • Ministry of Finance - Indonesia
  • TANGEDCO India
  • ICICI Bank Limited - India
  • Petrosea - Indonesia
  • Jatenergy - Australia
  • Merrill Lynch Commodities Europe
  • World Coal - UK
  • Aditya Birla Group - India
  • Commonwealth Bank - Australia
  • HSBC - Hong Kong
  • Ind-Barath Power Infra Limited - India
  • Indian Energy Exchange, India
  • Directorate Of Revenue Intelligence - India
  • Reliance Power - India
  • Central Java Power - Indonesia
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Geoservices-GeoAssay Lab
  • ACC Limited - India
  • Meenaskhi Energy Private Limited - India
  • Shenhua Group - China
  • UBS Singapore
  • Cosco
  • Bank of America
  • Timah Investasi Mineral - Indoneisa
  • Pinang Coal Indonesia
  • Miang Besar Coal Terminal - Indonesia
  • Runge Indonesia
  • PLN Batubara - Indonesia
  • Parliament of New Zealand
  • Asia Cement - Taiwan
  • JPMorgan - India
  • Metalloyd Limited - United Kingdom
  • Singapore Mercantile Exchange
  • Trasteel International SA, Italy
  • EMO - The Netherlands
  • Berau Coal - Indonesia
  • Arch Coal - USA
  • MS Steel International - UAE
  • TGV SRAAC LIMITED, India
  • Kapuas Tunggal Persada - Indonesia
  • SUEK AG - Indonesia
  • Electricity Authority, New Zealand
  • KEPCO - South Korea
  • Renaissance Capital - South Africa
  • IBC Asia (S) Pte Ltd
  • IOL Indonesia
  • Orica Australia Pty. Ltd.
  • Credit Suisse - India
  • Price Waterhouse Coopers - Russia
  • Ernst & Young Pvt. Ltd.
  • Kartika Selabumi Mining - Indonesia
  • Eastern Coal Council - USA
  • Global Business Power Corporation, Philippines
  • Deloitte Consulting - India
  • CoalTek, United States
  • NTPC Limited - India
  • Wood Mackenzie - Singapore
  • Romanian Commodities Exchange
  • Baramulti Group, Indonesia
  • Goldman Sachs - Singapore
  • Medco Energi Mining Internasional
  • Platts