COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Tuesday, 13 September 11
CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Monday, 17 July 23
APPROVED AMMONIA-FUELED CONTAINERSHIP - BENEFITS AND RISKS: REED SMITH
Following the news in Offshore Energy that Korea Maritime Consultants has secured approval in principle from the American Bureau of Shipping for it ...


Friday, 14 July 23
CLEAN COAL USE KEY TO DEEP CUTS IN EMISSIONS, STABLE ELECTRICITY SUPPLY - CHINA DAILY
China must push for the clean use of coal and step up integration of the dirty fuel with carbon capture, utilization and storage to achieve sustain ...


Thursday, 13 July 23
VIETNAM'S COAL EMISSIONS PRIMED FOR SURGE AFTER IMPORTS JUMP - REUTERS
Vietnam’s thermal power emissions are primed for a steep climb this summer after the country’s imports of thermal coal soared to their ...


Monday, 26 June 23
COAL PRODUCTION AND CONSUMPTION UP IN 2022 - EUROSTAT
In 2022, EU coal production and consumption continued to increase, reaching 349 million tonnes (+5% compared with the previous year) and 454 millio ...


Wednesday, 21 June 23
QATAR STRIKES SECOND BIG LNG SUPPLY DEAL WITH CHINA - REUTERS
Qatar on Tuesday secured its second large gas supply deal with a Chinese state-controlled company in less than a year, putting Asia clearly ahead i ...


   17 18 19 20 21   
Showing 91 to 95 news of total 6871
News by Category
Popular News
 
Total Members : 28,705
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • GNFC Limited - India
  • GB Group - China
  • Bayan Resources Tbk. - Indonesia
  • Asia Cement - Taiwan
  • Samtan Co., Ltd - South Korea
  • Power Finance Corporation Ltd., India
  • Bukit Asam (Persero) Tbk - Indonesia
  • Sojitz Corporation - Japan
  • Adani Power Ltd - India
  • Kepco SPC Power Corporation, Philippines
  • Orica Mining Services - Indonesia
  • Latin American Coal - Colombia
  • Vale Mozambique
  • Sakthi Sugars Limited - India
  • Pinang Coal Indonesia
  • Georgia Ports Authority, United States
  • Interocean Group of Companies - India
  • Vitol - Bahrain
  • Siam City Cement PLC, Thailand
  • PNOC Exploration Corporation - Philippines
  • Grasim Industreis Ltd - India
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Baramulti Group, Indonesia
  • Jaiprakash Power Ventures ltd
  • Australian Commodity Traders Exchange
  • Formosa Plastics Group - Taiwan
  • Makarim & Taira - Indonesia
  • SASOL - South Africa
  • globalCOAL - UK
  • IMC Shipping - Singapore
  • IEA Clean Coal Centre - UK
  • Mercuria Energy - Indonesia
  • Vedanta Resources Plc - India
  • Deutsche Bank - India
  • Alfred C Toepfer International GmbH - Germany
  • GAC Shipping (India) Pvt Ltd
  • Renaissance Capital - South Africa
  • PetroVietnam
  • World Bank
  • Independent Power Producers Association of India
  • Lanco Infratech Ltd - India
  • Ince & co LLP
  • Intertek Mineral Services - Indonesia
  • Tata Chemicals Ltd - India
  • Indogreen Group - Indonesia
  • GN Power Mariveles Coal Plant, Philippines
  • Tanito Harum - Indonesia
  • Global Coal Blending Company Limited - Australia
  • Videocon Industries ltd - India
  • Kumho Petrochemical, South Korea
  • Chettinad Cement Corporation Ltd - India
  • Indonesian Coal Mining Association
  • Shree Cement - India
  • BNP Paribas - Singapore
  • OCBC - Singapore
  • KPCL - India
  • Sinarmas Energy and Mining - Indonesia
  • Coaltrans Conferences
  • Antam Resourcindo - Indonesia
  • Infraline Energy - India
  • Ministry of Mines - Canada
  • Cigading International Bulk Terminal - Indonesia
  • Coalindo Energy - Indonesia
  • Maharashtra Electricity Regulatory Commission - India
  • Pipit Mutiara Jaya. PT, Indonesia
  • Ceylon Electricity Board - Sri Lanka
  • Romanian Commodities Exchange
  • Holcim Trading Pte Ltd - Singapore
  • International Coal Ventures Pvt Ltd - India
  • Thailand Anthracite
  • Cardiff University - UK
  • Bukit Baiduri Energy - Indonesia
  • Reliance Power - India
  • Shenhua Group - China
  • Global Green Power PLC Corporation, Philippines
  • Essar Steel Hazira Ltd - India
  • CoalTek, United States
  • Medco Energi Mining Internasional
  • HSBC - Hong Kong
  • The India Cements Ltd
  • Xstrata Coal
  • MEC Coal - Indonesia
  • Global Business Power Corporation, Philippines
  • Meralco Power Generation, Philippines
  • Therma Luzon, Inc, Philippines
  • Rio Tinto Coal - Australia
  • GVK Power & Infra Limited - India
  • UOB Asia (HK) Ltd
  • Minerals Council of Australia
  • Rashtriya Ispat Nigam Limited - India
  • Salva Resources Pvt Ltd - India
  • Wood Mackenzie - Singapore
  • ETA - Dubai
  • Energy Development Corp, Philippines
  • SGS (Thailand) Limited
  • DBS Bank - Singapore
  • Geoservices-GeoAssay Lab
  • Runge Indonesia
  • Krishnapatnam Port Company Ltd. - India
  • San Jose City I Power Corp, Philippines
  • Japan Coal Energy Center
  • London Commodity Brokers - England
  • Coal Orbis AG
  • CCIC - Indonesia
  • Toyota Tsusho Corporation, Japan
  • NTPC Limited - India
  • Vijayanagar Sugar Pvt Ltd - India
  • SN Aboitiz Power Inc, Philippines
  • MS Steel International - UAE
  • Moodys - Singapore
  • Trasteel International SA, Italy
  • TANGEDCO India
  • Thai Mozambique Logistica
  • Kapuas Tunggal Persada - Indonesia
  • Sindya Power Generating Company Private Ltd
  • Larsen & Toubro Limited - India
  • LBH Netherlands Bv - Netherlands
  • Mercator Lines Limited - India
  • Mjunction Services Limited - India
  • Indonesia Power. PT
  • Neyveli Lignite Corporation Ltd, - India
  • KPMG - USA
  • VISA Power Limited - India
  • Ernst & Young Pvt. Ltd.
  • Metalloyd Limited - United Kingdom
  • Arutmin Indonesia
  • Simpson Spence & Young - Indonesia
  • Madhucon Powers Ltd - India
  • Argus Media - Singapore
  • Samsung - South Korea
  • Straits Asia Resources Limited - Singapore
  • TNB Fuel Sdn Bhd - Malaysia
  • Platts
  • India Bulls Power Limited - India
  • Vizag Seaport Private Limited - India
  • Australian Coal Association
  • Kohat Cement Company Ltd. - Pakistan
  • Indika Energy - Indonesia
  • Kideco Jaya Agung - Indonesia
  • OPG Power Generation Pvt Ltd - India
  • Cemex - Philippines
  • Merrill Lynch Commodities Europe
  • Manunggal Multi Energi - Indonesia
  • The State Trading Corporation of India Ltd
  • Rudhra Energy - India
  • JPower - Japan
  • Lafarge - France
  • ASAPP Information Group - India
  • Port Waratah Coal Services - Australia
  • Commonwealth Bank - Australia
  • Singapore Mercantile Exchange
  • Borneo Indobara - Indonesia
  • Star Paper Mills Limited - India
  • Bhushan Steel Limited - India
  • The Treasury - Australian Government
  • SMG Consultants - Indonesia
  • Planning Commission, India
  • GHCL Limited - India
  • CIMB Investment Bank - Malaysia
  • Gujarat Mineral Development Corp Ltd - India
  • KOWEPO - South Korea
  • Electricity Authority, New Zealand
  • bp singapore
  • Inco-Indonesia
  • TeaM Sual Corporation - Philippines
  • White Energy Company Limited
  • Merrill Lynch Bank
  • Freeport Indonesia
  • PowerSource Philippines DevCo
  • Jindal Steel & Power Ltd - India
  • Kalimantan Lumbung Energi - Indonesia
  • Maersk Broker
  • Carbofer General Trading SA - India
  • TGV SRAAC LIMITED, India
  • ING Bank NV - Singapore
  • AsiaOL BioFuels Corp., Philippines
  • Maheswari Brothers Coal Limited - India
  • UBS Singapore
  • Humpuss - Indonesia
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Inspectorate - India
  • Meenaskhi Energy Private Limited - India
  • Asmin Koalindo Tuhup - Indonesia
  • Heidelberg Cement - Germany
  • Sucofindo - Indonesia
  • Attock Cement Pakistan Limited
  • Mitra SK Pvt Ltd - India
  • Wilmar Investment Holdings
  • Binh Thuan Hamico - Vietnam
  • Xindia Steels Limited - India
  • SUEK AG - Indonesia
  • New Zealand Coal & Carbon
  • Semirara Mining Corp, Philippines
  • Thomson Reuters GRC
  • Mitsubishi Corporation
  • Thiess Contractors Indonesia
  • Core Mineral Indonesia
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Gresik Semen - Indonesia
  • Bukit Makmur.PT - Indonesia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Deloitte Consulting - India
  • Petrochimia International Co. Ltd.- Taiwan
  • Ministry of Transport, Egypt
  • Indorama - Singapore
  • PetroVietnam Power Coal Import and Supply Company
  • Dalmia Cement Bharat India
  • Bhatia International Limited - India
  • Ind-Barath Power Infra Limited - India
  • Timah Investasi Mineral - Indoneisa
  • Orica Australia Pty. Ltd.
  • SRK Consulting
  • McConnell Dowell - Australia
  • Banpu Public Company Limited - Thailand
  • Goldman Sachs - Singapore
  • Cement Manufacturers Association - India
  • PLN - Indonesia
  • Britmindo - Indonesia
  • Savvy Resources Ltd - HongKong
  • KEPCO - South Korea
  • Russian Coal LLC
  • Eastern Coal Council - USA
  • Gupta Coal India Ltd
  • Economic Council, Georgia
  • Clarksons - UK
  • Bhoruka Overseas - Indonesia
  • Coal India Limited
  • Bangkok Bank PCL
  • PLN Batubara - Indonesia
  • BRS Brokers - Singapore
  • Permata Bank - Indonesia
  • J M Baxi & Co - India
  • Leighton Contractors Pty Ltd - Australia
  • Billiton Holdings Pty Ltd - Australia
  • Bangladesh Power Developement Board
  • Indian Oil Corporation Limited
  • Miang Besar Coal Terminal - Indonesia
  • Ambuja Cements Ltd - India
  • Fearnleys - India
  • Total Coal South Africa
  • Coal and Oil Company - UAE
  • Cebu Energy, Philippines
  • Parry Sugars Refinery, India
  • Directorate General of MIneral and Coal - Indonesia
  • RBS Sempra - UK
  • Mechel - Russia
  • Indian Energy Exchange, India
  • NALCO India
  • Cosco
  • Aditya Birla Group - India
  • Thriveni
  • Sree Jayajothi Cements Limited - India
  • Chamber of Mines of South Africa
  • Uttam Galva Steels Limited - India
  • Petron Corporation, Philippines
  • Oldendorff Carriers - Singapore
  • EMO - The Netherlands
  • Karaikal Port Pvt Ltd - India
  • ACC Limited - India
  • Bahari Cakrawala Sebuku - Indonesia
  • Berau Coal - Indonesia
  • South Luzon Thermal Energy Corporation
  • Sical Logistics Limited - India
  • Tamil Nadu electricity Board
  • Barasentosa Lestari - Indonesia
  • Jorong Barutama Greston.PT - Indonesia
  • World Coal - UK
  • Semirara Mining and Power Corporation, Philippines
  • Qatrana Cement - Jordan
  • Bharathi Cement Corporation - India
  • Mitsui
  • Thermax Limited - India
  • Kobexindo Tractors - Indoneisa
  • Marubeni Corporation - India
  • Noble Europe Ltd - UK
  • Bulk Trading Sa - Switzerland
  • GMR Energy Limited - India
  • Africa Commodities Group - South Africa
  • Coeclerici Indonesia
  • CESC Limited - India
  • Gujarat Electricity Regulatory Commission - India
  • Agrawal Coal Company - India
  • Bank of China, Malaysia
  • Panama Canal Authority
  • Karbindo Abesyapradhi - Indoneisa
  • Enel Italy
  • Price Waterhouse Coopers - Russia
  • Central Electricity Authority - India
  • Siam City Cement - Thailand
  • Glencore India Pvt. Ltd
  • Malabar Cements Ltd - India
  • Edison Trading Spa - Italy
  • Asian Development Bank
  • JPMorgan - India
  • SMC Global Power, Philippines
  • Kartika Selabumi Mining - Indonesia
  • Maybank - Singapore
  • Mintek Dendrill Indonesia
  • McKinsey & Co - India
  • TRAFIGURA, South Korea
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Anglo American - United Kingdom
  • IHS Mccloskey Coal Group - USA
  • Bank of America
  • ANZ Bank - Australia
  • IBC Asia (S) Pte Ltd
  • Platou - Singapore
  • Coastal Gujarat Power Limited - India
  • Peabody Energy - USA
  • Riau Bara Harum - Indonesia
  • Barclays Capital - USA
  • Standard Chartered Bank - UAE
  • European Bulk Services B.V. - Netherlands
  • Sarangani Energy Corporation, Philippines
  • Pendopo Energi Batubara - Indonesia
  • WorleyParsons
  • Posco Energy - South Korea
  • ICICI Bank Limited - India
  • Indo Tambangraya Megah - Indonesia
  • Jatenergy - Australia
  • CNBM International Corporation - China
  • Idemitsu - Japan
  • Parliament of New Zealand
  • Surastha Cement
  • PTC India Limited - India
  • Kobe Steel Ltd - Japan
  • Directorate Of Revenue Intelligence - India
  • Electricity Generating Authority of Thailand
  • EIA - United States
  • Kaltim Prima Coal - Indonesia
  • APGENCO India
  • TNPL - India
  • Maruti Cements - India
  • Eastern Energy - Thailand
  • Credit Suisse - India
  • Arch Coal - USA
  • Aboitiz Power Corporation - Philippines
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • U S Energy Resources
  • Tata Power - India
  • Cargill India Pvt Ltd
  • Petrosea - Indonesia
  • Iligan Light & Power Inc, Philippines
  • Adaro Indonesia
  • Malco - India
  • The University of Queensland
  • Energy Link Ltd, New Zealand
  • Gujarat Sidhee Cement - India
  • Central Java Power - Indonesia
  • Ministry of Finance - Indonesia
  • IOL Indonesia
  • Altura Mining Limited, Indonesia
  • Indian School of Mines
  • Globalindo Alam Lestari - Indonesia