CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Sunday, 10 September 23
CHINA AUGUST COAL IMPORTS OF 44.3 MLN T HIT RECORD - REUTERS
China, the world’s top coal consumer, imported 44.3 million metric tons of the fuel last month, customs data showed, the highest amount in an ...
Tuesday, 22 August 23
CHINA'S COAL PRODUCTION LOGS STEADY GROWTH IN JANUARY-JULY: XINHUA
China’s output of raw coal went up 3.6 percent year on year in the first seven months of this year, official data showed.
The ...
Sunday, 13 August 23
THE COMMODITIES FEED: LNG SUPPLY RISKS LINGER - ING
Energy – OPEC sees deficit over remainder of 2023
Oil prices came under some pressure yesterday with ICE Brent settling a litt ...
Wednesday, 09 August 23
COAL TRADE TO RETURN TO 2019 LEVELS - BALTIC EXCHANGE
The International Energy Agency’s mid-year Coal Market Update for 2023 brings both positive and concerning news for the global coal industry. ...
Sunday, 23 July 23
ANALYSIS-INDIA'S COAL MINING BET STUMBLES AS WARY BANKS WEIGH RISING RISKS - REUTERS
India’s drive to ramp up coal output to meet growing energy demand is faltering due to banks’ reluctance to finance newly auctioned min ...
|
|
|
Showing 86 to 90 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Kartika Selabumi Mining - Indonesia
- Siam City Cement - Thailand
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Bukit Makmur.PT - Indonesia
- Makarim & Taira - Indonesia
- Parliament of New Zealand
- Straits Asia Resources Limited - Singapore
- Thai Mozambique Logistica
- PTC India Limited - India
- CNBM International Corporation - China
- PetroVietnam Power Coal Import and Supply Company
- Maharashtra Electricity Regulatory Commission - India
- Eastern Coal Council - USA
- Anglo American - United Kingdom
- Standard Chartered Bank - UAE
- Metalloyd Limited - United Kingdom
- White Energy Company Limited
- Global Coal Blending Company Limited - Australia
- Edison Trading Spa - Italy
- Gujarat Sidhee Cement - India
- Bayan Resources Tbk. - Indonesia
- Kobexindo Tractors - Indoneisa
- Lanco Infratech Ltd - India
- Meralco Power Generation, Philippines
- Bulk Trading Sa - Switzerland
- GMR Energy Limited - India
- Offshore Bulk Terminal Pte Ltd, Singapore
- India Bulls Power Limited - India
- Coastal Gujarat Power Limited - India
- Mintek Dendrill Indonesia
- Africa Commodities Group - South Africa
- Banpu Public Company Limited - Thailand
- IEA Clean Coal Centre - UK
- Intertek Mineral Services - Indonesia
- Maheswari Brothers Coal Limited - India
- Bhatia International Limited - India
- Sindya Power Generating Company Private Ltd
- Power Finance Corporation Ltd., India
- Ministry of Mines - Canada
- Borneo Indobara - Indonesia
- Essar Steel Hazira Ltd - India
- VISA Power Limited - India
- Asia Pacific Energy Resources Ventures Inc, Philippines
- Ministry of Finance - Indonesia
- SN Aboitiz Power Inc, Philippines
- Rio Tinto Coal - Australia
- Vizag Seaport Private Limited - India
- AsiaOL BioFuels Corp., Philippines
- Wilmar Investment Holdings
- Iligan Light & Power Inc, Philippines
- Binh Thuan Hamico - Vietnam
- Mercuria Energy - Indonesia
- Therma Luzon, Inc, Philippines
- The State Trading Corporation of India Ltd
- Merrill Lynch Commodities Europe
- GN Power Mariveles Coal Plant, Philippines
- Meenaskhi Energy Private Limited - India
- ICICI Bank Limited - India
- OPG Power Generation Pvt Ltd - India
- Krishnapatnam Port Company Ltd. - India
- Singapore Mercantile Exchange
- Carbofer General Trading SA - India
- Electricity Authority, New Zealand
- Antam Resourcindo - Indonesia
- Jorong Barutama Greston.PT - Indonesia
- McConnell Dowell - Australia
- Simpson Spence & Young - Indonesia
- Billiton Holdings Pty Ltd - Australia
- Kepco SPC Power Corporation, Philippines
- Karbindo Abesyapradhi - Indoneisa
- Petron Corporation, Philippines
- Petrochimia International Co. Ltd.- Taiwan
- PNOC Exploration Corporation - Philippines
- Ministry of Transport, Egypt
- Thiess Contractors Indonesia
- Samtan Co., Ltd - South Korea
- Independent Power Producers Association of India
- Georgia Ports Authority, United States
- Indika Energy - Indonesia
- GAC Shipping (India) Pvt Ltd
- PowerSource Philippines DevCo
- Global Business Power Corporation, Philippines
- Heidelberg Cement - Germany
- Parry Sugars Refinery, India
- Bharathi Cement Corporation - India
- SMC Global Power, Philippines
- Altura Mining Limited, Indonesia
- Bahari Cakrawala Sebuku - Indonesia
- Latin American Coal - Colombia
- Bukit Baiduri Energy - Indonesia
- Price Waterhouse Coopers - Russia
- Kaltim Prima Coal - Indonesia
- Dalmia Cement Bharat India
- Salva Resources Pvt Ltd - India
- Eastern Energy - Thailand
- Australian Coal Association
- Kohat Cement Company Ltd. - Pakistan
- Attock Cement Pakistan Limited
- LBH Netherlands Bv - Netherlands
- Chettinad Cement Corporation Ltd - India
- Marubeni Corporation - India
- Kumho Petrochemical, South Korea
- Miang Besar Coal Terminal - Indonesia
- GVK Power & Infra Limited - India
- Barasentosa Lestari - Indonesia
- Semirara Mining Corp, Philippines
- Posco Energy - South Korea
- Deloitte Consulting - India
- Ambuja Cements Ltd - India
- Oldendorff Carriers - Singapore
- Sojitz Corporation - Japan
- Trasteel International SA, Italy
- Larsen & Toubro Limited - India
- Renaissance Capital - South Africa
- Aboitiz Power Corporation - Philippines
- Electricity Generating Authority of Thailand
- Ind-Barath Power Infra Limited - India
- Xindia Steels Limited - India
- Rashtriya Ispat Nigam Limited - India
- Jaiprakash Power Ventures ltd
- Directorate Of Revenue Intelligence - India
- IHS Mccloskey Coal Group - USA
- Wood Mackenzie - Singapore
- Economic Council, Georgia
- Indian Oil Corporation Limited
- Energy Development Corp, Philippines
- Gujarat Mineral Development Corp Ltd - India
- Kapuas Tunggal Persada - Indonesia
- Star Paper Mills Limited - India
- Cigading International Bulk Terminal - Indonesia
- Aditya Birla Group - India
- Mercator Lines Limited - India
- Malabar Cements Ltd - India
- Global Green Power PLC Corporation, Philippines
- Orica Australia Pty. Ltd.
- Cement Manufacturers Association - India
- Leighton Contractors Pty Ltd - Australia
- Directorate General of MIneral and Coal - Indonesia
- MS Steel International - UAE
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Bhoruka Overseas - Indonesia
- European Bulk Services B.V. - Netherlands
- Sarangani Energy Corporation, Philippines
- Port Waratah Coal Services - Australia
- Uttam Galva Steels Limited - India
- Grasim Industreis Ltd - India
- Pendopo Energi Batubara - Indonesia
- South Luzon Thermal Energy Corporation
- Coalindo Energy - Indonesia
- Bank of Tokyo Mitsubishi UFJ Ltd
- Romanian Commodities Exchange
- Indo Tambangraya Megah - Indonesia
- Sree Jayajothi Cements Limited - India
- Energy Link Ltd, New Zealand
- Savvy Resources Ltd - HongKong
- Orica Mining Services - Indonesia
- International Coal Ventures Pvt Ltd - India
- Minerals Council of Australia
- Tamil Nadu electricity Board
- Tata Chemicals Ltd - India
- Central Electricity Authority - India
- Chamber of Mines of South Africa
- Commonwealth Bank - Australia
- TNB Fuel Sdn Bhd - Malaysia
- Kideco Jaya Agung - Indonesia
- Asmin Koalindo Tuhup - Indonesia
- Indonesian Coal Mining Association
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Indian Energy Exchange, India
- Mjunction Services Limited - India
- Vedanta Resources Plc - India
- Agrawal Coal Company - India
- Sinarmas Energy and Mining - Indonesia
- Holcim Trading Pte Ltd - Singapore
- CIMB Investment Bank - Malaysia
- Neyveli Lignite Corporation Ltd, - India
- Bangladesh Power Developement Board
- San Jose City I Power Corp, Philippines
- Bhushan Steel Limited - India
- Baramulti Group, Indonesia
- Interocean Group of Companies - India
- Karaikal Port Pvt Ltd - India
- Vijayanagar Sugar Pvt Ltd - India
- Kalimantan Lumbung Energi - Indonesia
- Sical Logistics Limited - India
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- ASAPP Information Group - India
- Siam City Cement PLC, Thailand
- The University of Queensland
- SMG Consultants - Indonesia
- Central Java Power - Indonesia
- The Treasury - Australian Government
- Alfred C Toepfer International GmbH - Germany
- London Commodity Brokers - England
- Videocon Industries ltd - India
- Formosa Plastics Group - Taiwan
- Coal and Oil Company - UAE
- Ceylon Electricity Board - Sri Lanka
- Goldman Sachs - Singapore
- Indogreen Group - Indonesia
- Planning Commission, India
- Toyota Tsusho Corporation, Japan
- Jindal Steel & Power Ltd - India
- Semirara Mining and Power Corporation, Philippines
- New Zealand Coal & Carbon
- TeaM Sual Corporation - Philippines
- Timah Investasi Mineral - Indoneisa
- Manunggal Multi Energi - Indonesia
- Australian Commodity Traders Exchange
- Globalindo Alam Lestari - Indonesia
- Riau Bara Harum - Indonesia
- Bukit Asam (Persero) Tbk - Indonesia
- Madhucon Powers Ltd - India
- Gujarat Electricity Regulatory Commission - India
- Medco Energi Mining Internasional
- Sakthi Sugars Limited - India
- Pipit Mutiara Jaya. PT, Indonesia
|
| |
| |
|