CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Thursday, 15 September 11
INDIAN GOVT PLANS TO DEVELOP 9 NEW MAJOR PORTS BY 2016 - INVEST MONEY / HELLENIC SHIPPING
The government has announced to make a investment of more than Rs 22,000 crore (approximately US$ 4,623,791,331) to develop nine new major ...


Thursday, 15 September 11
BOTSWANA COAL AND ENERGY CONFERENCE 2011
Press Release - Botswana Coal and Energy Conference 2011 | 29-30 November 2011 | Gaborone. Botswana represents Africa’s exciting new coal and ...


Thursday, 15 September 11
DRY BULK MARKET EDGING FURTHER UP THE SCALE, CLOSING IN ON 2,000 POINTS - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The dry bulk market was up once again yesterday, reaching 1,927 points, or 1.375 higher on the day. Thus, it has kept its rising trend established d ...


Wednesday, 14 September 11
INDO STRAITS BAGS 2.4 MILLION TON COAL TRANSPORTATION CONTRACT FROM ARUTMIN
COALspot.com - PT Indo Straits Tbk (PTIS) bagged a contract to tranship  about 2.40 million tons of coal over an initial period of 6 months fro ...


Wednesday, 14 September 11
DUTA PERTIWI DISCOVERS COAL RESERVE - INSIDER STORIES
  Insider Stories reported that, PT Duta Pertiwi Nusantara Tbk (DPNS) yesterday steeply jumped 24.56% to Rp710 a share after the company discove ...


   1015 1016 1017 1018 1019   
Showing 5081 to 5085 news of total 6871
News by Category
Popular News
 
Total Members : 28,621
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Star Paper Mills Limited - India
  • Mjunction Services Limited - India
  • Energy Link Ltd, New Zealand
  • Bhushan Steel Limited - India
  • Carbofer General Trading SA - India
  • Mitsui
  • Kapuas Tunggal Persada - Indonesia
  • Medco Energi Mining Internasional
  • Orica Australia Pty. Ltd.
  • Mintek Dendrill Indonesia
  • Banpu Public Company Limited - Thailand
  • Russian Coal LLC
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Coeclerici Indonesia
  • Interocean Group of Companies - India
  • PowerSource Philippines DevCo
  • Directorate Of Revenue Intelligence - India
  • Adaro Indonesia
  • Eastern Energy - Thailand
  • Cigading International Bulk Terminal - Indonesia
  • TNPL - India
  • SN Aboitiz Power Inc, Philippines
  • Singapore Mercantile Exchange
  • U S Energy Resources
  • Semirara Mining and Power Corporation, Philippines
  • Indian Energy Exchange, India
  • Platou - Singapore
  • Sakthi Sugars Limited - India
  • IMC Shipping - Singapore
  • Credit Suisse - India
  • Global Business Power Corporation, Philippines
  • Maruti Cements - India
  • Platts
  • Wood Mackenzie - Singapore
  • Energy Development Corp, Philippines
  • Vedanta Resources Plc - India
  • Jaiprakash Power Ventures ltd
  • AsiaOL BioFuels Corp., Philippines
  • GNFC Limited - India
  • Kepco SPC Power Corporation, Philippines
  • Petron Corporation, Philippines
  • Sical Logistics Limited - India
  • NTPC Limited - India
  • Global Coal Blending Company Limited - Australia
  • CCIC - Indonesia
  • Anglo American - United Kingdom
  • Indian Oil Corporation Limited
  • SMG Consultants - Indonesia
  • Ministry of Finance - Indonesia
  • Electricity Authority, New Zealand
  • ETA - Dubai
  • MEC Coal - Indonesia
  • Karaikal Port Pvt Ltd - India
  • European Bulk Services B.V. - Netherlands
  • Mitra SK Pvt Ltd - India
  • Indian School of Mines
  • PLN Batubara - Indonesia
  • Pinang Coal Indonesia
  • Permata Bank - Indonesia
  • Binh Thuan Hamico - Vietnam
  • Rudhra Energy - India
  • UBS Singapore
  • Edison Trading Spa - Italy
  • Pipit Mutiara Jaya. PT, Indonesia
  • RBS Sempra - UK
  • Aboitiz Power Corporation - Philippines
  • Port Waratah Coal Services - Australia
  • Runge Indonesia
  • Orica Mining Services - Indonesia
  • Thai Mozambique Logistica
  • ACC Limited - India
  • Chettinad Cement Corporation Ltd - India
  • Kumho Petrochemical, South Korea
  • GMR Energy Limited - India
  • Bahari Cakrawala Sebuku - Indonesia
  • JPower - Japan
  • GN Power Mariveles Coal Plant, Philippines
  • Malabar Cements Ltd - India
  • Georgia Ports Authority, United States
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Ambuja Cements Ltd - India
  • Rio Tinto Coal - Australia
  • Lafarge - France
  • Petrochimia International Co. Ltd.- Taiwan
  • The State Trading Corporation of India Ltd
  • Latin American Coal - Colombia
  • Thermax Limited - India
  • Britmindo - Indonesia
  • World Coal - UK
  • LBH Netherlands Bv - Netherlands
  • Borneo Indobara - Indonesia
  • Chamber of Mines of South Africa
  • ICICI Bank Limited - India
  • Neyveli Lignite Corporation Ltd, - India
  • KOWEPO - South Korea
  • Antam Resourcindo - Indonesia
  • Africa Commodities Group - South Africa
  • Economic Council, Georgia
  • Oldendorff Carriers - Singapore
  • SGS (Thailand) Limited
  • Globalindo Alam Lestari - Indonesia
  • Indogreen Group - Indonesia
  • Vitol - Bahrain
  • Cebu Energy, Philippines
  • Marubeni Corporation - India
  • Meenaskhi Energy Private Limited - India
  • Riau Bara Harum - Indonesia
  • Gujarat Electricity Regulatory Commission - India
  • Iligan Light & Power Inc, Philippines
  • CESC Limited - India
  • Aditya Birla Group - India
  • Independent Power Producers Association of India
  • Coal Orbis AG
  • Minerals Council of Australia
  • Directorate General of MIneral and Coal - Indonesia
  • Jatenergy - Australia
  • Surastha Cement
  • Merrill Lynch Bank
  • Attock Cement Pakistan Limited
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Gujarat Sidhee Cement - India
  • Noble Europe Ltd - UK
  • Bukit Asam (Persero) Tbk - Indonesia
  • Asian Development Bank
  • Bank of China, Malaysia
  • Freeport Indonesia
  • PTC India Limited - India
  • Samsung - South Korea
  • Eastern Coal Council - USA
  • Standard Chartered Bank - UAE
  • Salva Resources Pvt Ltd - India
  • Romanian Commodities Exchange
  • India Bulls Power Limited - India
  • Semirara Mining Corp, Philippines
  • Maharashtra Electricity Regulatory Commission - India
  • Agrawal Coal Company - India
  • Cargill India Pvt Ltd
  • Renaissance Capital - South Africa
  • Kideco Jaya Agung - Indonesia
  • Pendopo Energi Batubara - Indonesia
  • TRAFIGURA, South Korea
  • PetroVietnam Power Coal Import and Supply Company
  • Central Java Power - Indonesia
  • Larsen & Toubro Limited - India
  • Global Green Power PLC Corporation, Philippines
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Parliament of New Zealand
  • Thailand Anthracite
  • GHCL Limited - India
  • Central Electricity Authority - India
  • Kalimantan Lumbung Energi - Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • Metalloyd Limited - United Kingdom
  • Total Coal South Africa
  • The India Cements Ltd
  • Maheswari Brothers Coal Limited - India
  • CNBM International Corporation - China
  • Tata Power - India
  • ASAPP Information Group - India
  • Krishnapatnam Port Company Ltd. - India
  • Indorama - Singapore
  • Argus Media - Singapore
  • Mechel - Russia
  • Kartika Selabumi Mining - Indonesia
  • EMO - The Netherlands
  • SMC Global Power, Philippines
  • VISA Power Limited - India
  • SASOL - South Africa
  • Grasim Industreis Ltd - India
  • Jindal Steel & Power Ltd - India
  • Holcim Trading Pte Ltd - Singapore
  • IHS Mccloskey Coal Group - USA
  • Manunggal Multi Energi - Indonesia
  • Thiess Contractors Indonesia
  • Sucofindo - Indonesia
  • OCBC - Singapore
  • TeaM Sual Corporation - Philippines
  • Intertek Mineral Services - Indonesia
  • Trasteel International SA, Italy
  • Qatrana Cement - Jordan
  • Australian Coal Association
  • Vizag Seaport Private Limited - India
  • Clarksons - UK
  • Siam City Cement - Thailand
  • McKinsey & Co - India
  • Geoservices-GeoAssay Lab
  • Arch Coal - USA
  • Petrosea - Indonesia
  • Commonwealth Bank - Australia
  • Bulk Trading Sa - Switzerland
  • Gujarat Mineral Development Corp Ltd - India
  • Panama Canal Authority
  • Inspectorate - India
  • bp singapore
  • Bharathi Cement Corporation - India
  • Coalindo Energy - Indonesia
  • Jorong Barutama Greston.PT - Indonesia
  • Meralco Power Generation, Philippines
  • Dalmia Cement Bharat India
  • Karbindo Abesyapradhi - Indoneisa
  • Ind-Barath Power Infra Limited - India
  • Indo Tambangraya Megah - Indonesia
  • APGENCO India
  • International Coal Ventures Pvt Ltd - India
  • Tanito Harum - Indonesia
  • TANGEDCO India
  • Essar Steel Hazira Ltd - India
  • Barasentosa Lestari - Indonesia
  • Deutsche Bank - India
  • Fearnleys - India
  • SRK Consulting
  • Lanco Infratech Ltd - India
  • White Energy Company Limited
  • Indonesian Coal Mining Association
  • Ernst & Young Pvt. Ltd.
  • BRS Brokers - Singapore
  • Miang Besar Coal Terminal - Indonesia
  • PNOC Exploration Corporation - Philippines
  • Mitsubishi Corporation
  • Mercuria Energy - Indonesia
  • Australian Commodity Traders Exchange
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • J M Baxi & Co - India
  • Kobe Steel Ltd - Japan
  • Idemitsu - Japan
  • Berau Coal - Indonesia
  • Core Mineral Indonesia
  • Inco-Indonesia
  • Coal and Oil Company - UAE
  • Kobexindo Tractors - Indoneisa
  • PetroVietnam
  • Adani Power Ltd - India
  • Asia Cement - Taiwan
  • Kaltim Prima Coal - Indonesia
  • Therma Luzon, Inc, Philippines
  • Humpuss - Indonesia
  • San Jose City I Power Corp, Philippines
  • Parry Sugars Refinery, India
  • EIA - United States
  • Japan Coal Energy Center
  • KPCL - India
  • Ministry of Mines - Canada
  • Siam City Cement PLC, Thailand
  • Cosco
  • Electricity Generating Authority of Thailand
  • KPMG - USA
  • Makarim & Taira - Indonesia
  • Power Finance Corporation Ltd., India
  • IEA Clean Coal Centre - UK
  • Madhucon Powers Ltd - India
  • globalCOAL - UK
  • Samtan Co., Ltd - South Korea
  • Tata Chemicals Ltd - India
  • WorleyParsons
  • Wilmar Investment Holdings
  • Sindya Power Generating Company Private Ltd
  • Vale Mozambique
  • Bhoruka Overseas - Indonesia
  • Shenhua Group - China
  • Sinarmas Energy and Mining - Indonesia
  • Mercator Lines Limited - India
  • CIMB Investment Bank - Malaysia
  • KEPCO - South Korea
  • Ceylon Electricity Board - Sri Lanka
  • Ministry of Transport, Egypt
  • Toyota Tsusho Corporation, Japan
  • OPG Power Generation Pvt Ltd - India
  • UOB Asia (HK) Ltd
  • TGV SRAAC LIMITED, India
  • Billiton Holdings Pty Ltd - Australia
  • Coaltrans Conferences
  • Vijayanagar Sugar Pvt Ltd - India
  • GAC Shipping (India) Pvt Ltd
  • ING Bank NV - Singapore
  • Sarangani Energy Corporation, Philippines
  • Sree Jayajothi Cements Limited - India
  • Ince & co LLP
  • Enel Italy
  • ANZ Bank - Australia
  • The Treasury - Australian Government
  • Malco - India
  • Xindia Steels Limited - India
  • SUEK AG - Indonesia
  • South Luzon Thermal Energy Corporation
  • Maybank - Singapore
  • HSBC - Hong Kong
  • IOL Indonesia
  • Uttam Galva Steels Limited - India
  • Kohat Cement Company Ltd. - Pakistan
  • Maersk Broker
  • Peabody Energy - USA
  • Savvy Resources Ltd - HongKong
  • IBC Asia (S) Pte Ltd
  • New Zealand Coal & Carbon
  • BNP Paribas - Singapore
  • Bukit Makmur.PT - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • GB Group - China
  • Barclays Capital - USA
  • Shree Cement - India
  • Deloitte Consulting - India
  • Bangladesh Power Developement Board
  • McConnell Dowell - Australia
  • Arutmin Indonesia
  • JPMorgan - India
  • Coastal Gujarat Power Limited - India
  • Thomson Reuters GRC
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Moodys - Singapore
  • Thriveni
  • NALCO India
  • CoalTek, United States
  • GVK Power & Infra Limited - India
  • Simpson Spence & Young - Indonesia
  • Bhatia International Limited - India
  • Bayan Resources Tbk. - Indonesia
  • Timah Investasi Mineral - Indoneisa
  • Heidelberg Cement - Germany
  • Bank of America
  • Posco Energy - South Korea
  • Reliance Power - India
  • Merrill Lynch Commodities Europe
  • World Bank
  • Straits Asia Resources Limited - Singapore
  • Coal India Limited
  • Cardiff University - UK
  • Cemex - Philippines
  • DBS Bank - Singapore
  • Leighton Contractors Pty Ltd - Australia
  • London Commodity Brokers - England
  • Indonesia Power. PT
  • Bukit Baiduri Energy - Indonesia
  • Cement Manufacturers Association - India
  • Glencore India Pvt. Ltd
  • Planning Commission, India
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Infraline Energy - India
  • Sojitz Corporation - Japan
  • TNB Fuel Sdn Bhd - Malaysia
  • Baramulti Group, Indonesia
  • Altura Mining Limited, Indonesia
  • Videocon Industries ltd - India
  • Goldman Sachs - Singapore
  • Price Waterhouse Coopers - Russia
  • The University of Queensland
  • PLN - Indonesia
  • MS Steel International - UAE
  • Gresik Semen - Indonesia
  • Gupta Coal India Ltd
  • Tamil Nadu electricity Board
  • Bangkok Bank PCL
  • Asmin Koalindo Tuhup - Indonesia
  • Xstrata Coal
  • Indika Energy - Indonesia
  • Formosa Plastics Group - Taiwan