CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Sunday, 18 September 11
THE COAL IMPORTS TO INDIA, OUT OF INDONESIA LIKELY TO PICK UP - CAPT. REDDY
COALspot.com - The freight market continued the upward trend until midweek almost touching 2,000 points, however towards second half of the week the ...
Saturday, 17 September 11
GVK ACQUIRES HANCOCK COAL AND INFRASTRUCTURE FOR US$ 1.26 BILLION
COALspot.com - GVK group, India’s leading infrastructure developer,confirmed arrangements for the acquisition of a strategic part of large, hi ...
Saturday, 17 September 11
INDIA'S GVK ACQUIRES HANCOCK COAL AND INFRASTRUCTURE PROJECTS IN AUSTRALIA
COALspot.com - GVK group, India’s leading infrastructure developer, today confirmed arrangements for the acquisition of a strategic part of la ...
Friday, 16 September 11
DELTA DUNIA MAKMUR REMOVED 30.9 MILLION BCM OVERBURDEN IN AUGUST 2011
COALspot.com - PT. Delta Dunia Makmur Tbk has removed 30.9 million bcm (+13.2% YoY) overburden in August 2011 while coal production was at 2.9 ...
Thursday, 15 September 11
RUSSIAN COAL EXPORTS UP 10.9% IN JAN-AUG TO 71.50 MILLION TONS - PORT NEWS / HELLENIC SHIPPING
Port News reported that, Coal exports from Russia in January-August 2011 grew by 10.9% compared with the same period last year, to 71.50 million ton ...
|
|
|
Showing 5076 to 5080 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Asia Pacific Energy Resources Ventures Inc, Philippines
- Parry Sugars Refinery, India
- Price Waterhouse Coopers - Russia
- Uttam Galva Steels Limited - India
- Karbindo Abesyapradhi - Indoneisa
- Bulk Trading Sa - Switzerland
- AsiaOL BioFuels Corp., Philippines
- Therma Luzon, Inc, Philippines
- Global Business Power Corporation, Philippines
- Essar Steel Hazira Ltd - India
- Madhucon Powers Ltd - India
- MS Steel International - UAE
- Rio Tinto Coal - Australia
- Global Green Power PLC Corporation, Philippines
- Altura Mining Limited, Indonesia
- SMC Global Power, Philippines
- Pendopo Energi Batubara - Indonesia
- Toyota Tsusho Corporation, Japan
- Central Electricity Authority - India
- CNBM International Corporation - China
- Dalmia Cement Bharat India
- Leighton Contractors Pty Ltd - Australia
- Agrawal Coal Company - India
- Sarangani Energy Corporation, Philippines
- Latin American Coal - Colombia
- Merrill Lynch Commodities Europe
- Thai Mozambique Logistica
- Kepco SPC Power Corporation, Philippines
- Deloitte Consulting - India
- Coalindo Energy - Indonesia
- Minerals Council of Australia
- Indian Oil Corporation Limited
- Sical Logistics Limited - India
- Straits Asia Resources Limited - Singapore
- GN Power Mariveles Coal Plant, Philippines
- Attock Cement Pakistan Limited
- Karaikal Port Pvt Ltd - India
- Independent Power Producers Association of India
- PTC India Limited - India
- Wood Mackenzie - Singapore
- Miang Besar Coal Terminal - Indonesia
- LBH Netherlands Bv - Netherlands
- White Energy Company Limited
- Bharathi Cement Corporation - India
- Ministry of Finance - Indonesia
- Iligan Light & Power Inc, Philippines
- Vijayanagar Sugar Pvt Ltd - India
- Global Coal Blending Company Limited - Australia
- Kumho Petrochemical, South Korea
- Salva Resources Pvt Ltd - India
- Kapuas Tunggal Persada - Indonesia
- Petron Corporation, Philippines
- Central Java Power - Indonesia
- Bahari Cakrawala Sebuku - Indonesia
- SN Aboitiz Power Inc, Philippines
- Jorong Barutama Greston.PT - Indonesia
- Baramulti Group, Indonesia
- GMR Energy Limited - India
- India Bulls Power Limited - India
- Banpu Public Company Limited - Thailand
- Edison Trading Spa - Italy
- GVK Power & Infra Limited - India
- McConnell Dowell - Australia
- Electricity Authority, New Zealand
- Vedanta Resources Plc - India
- Lanco Infratech Ltd - India
- Sinarmas Energy and Mining - Indonesia
- Australian Commodity Traders Exchange
- Energy Development Corp, Philippines
- Bayan Resources Tbk. - Indonesia
- Economic Council, Georgia
- Jaiprakash Power Ventures ltd
- Gujarat Electricity Regulatory Commission - India
- Kaltim Prima Coal - Indonesia
- Kobexindo Tractors - Indoneisa
- Cigading International Bulk Terminal - Indonesia
- Oldendorff Carriers - Singapore
- Thiess Contractors Indonesia
- Wilmar Investment Holdings
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Billiton Holdings Pty Ltd - Australia
- Aboitiz Power Corporation - Philippines
- OPG Power Generation Pvt Ltd - India
- Ind-Barath Power Infra Limited - India
- Goldman Sachs - Singapore
- Xindia Steels Limited - India
- IEA Clean Coal Centre - UK
- Mercator Lines Limited - India
- PNOC Exploration Corporation - Philippines
- Maheswari Brothers Coal Limited - India
- TNB Fuel Sdn Bhd - Malaysia
- Energy Link Ltd, New Zealand
- Indo Tambangraya Megah - Indonesia
- Makarim & Taira - Indonesia
- Sakthi Sugars Limited - India
- Grasim Industreis Ltd - India
- Sindya Power Generating Company Private Ltd
- New Zealand Coal & Carbon
- Ministry of Transport, Egypt
- Samtan Co., Ltd - South Korea
- Coastal Gujarat Power Limited - India
- Krishnapatnam Port Company Ltd. - India
- ASAPP Information Group - India
- Mercuria Energy - Indonesia
- Rashtriya Ispat Nigam Limited - India
- Formosa Plastics Group - Taiwan
- Georgia Ports Authority, United States
- Posco Energy - South Korea
- Eastern Coal Council - USA
- Bhatia International Limited - India
- Semirara Mining and Power Corporation, Philippines
- Timah Investasi Mineral - Indoneisa
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Bukit Baiduri Energy - Indonesia
- Alfred C Toepfer International GmbH - Germany
- GAC Shipping (India) Pvt Ltd
- Power Finance Corporation Ltd., India
- Globalindo Alam Lestari - Indonesia
- Meenaskhi Energy Private Limited - India
- Commonwealth Bank - Australia
- Videocon Industries ltd - India
- PetroVietnam Power Coal Import and Supply Company
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Heidelberg Cement - Germany
- Borneo Indobara - Indonesia
- IHS Mccloskey Coal Group - USA
- Semirara Mining Corp, Philippines
- Mintek Dendrill Indonesia
- International Coal Ventures Pvt Ltd - India
- Anglo American - United Kingdom
- Indonesian Coal Mining Association
- Sree Jayajothi Cements Limited - India
- Africa Commodities Group - South Africa
- South Luzon Thermal Energy Corporation
- The Treasury - Australian Government
- Petrochimia International Co. Ltd.- Taiwan
- Indian Energy Exchange, India
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Planning Commission, India
- PowerSource Philippines DevCo
- Maharashtra Electricity Regulatory Commission - India
- Savvy Resources Ltd - HongKong
- Romanian Commodities Exchange
- Siam City Cement - Thailand
- Trasteel International SA, Italy
- Siam City Cement PLC, Thailand
- Interocean Group of Companies - India
- Larsen & Toubro Limited - India
- Gujarat Sidhee Cement - India
- Barasentosa Lestari - Indonesia
- Carbofer General Trading SA - India
- Indika Energy - Indonesia
- Port Waratah Coal Services - Australia
- Sojitz Corporation - Japan
- CIMB Investment Bank - Malaysia
- Renaissance Capital - South Africa
- Antam Resourcindo - Indonesia
- Kartika Selabumi Mining - Indonesia
- Bukit Makmur.PT - Indonesia
- VISA Power Limited - India
- Singapore Mercantile Exchange
- Bank of Tokyo Mitsubishi UFJ Ltd
- Intertek Mineral Services - Indonesia
- Chettinad Cement Corporation Ltd - India
- European Bulk Services B.V. - Netherlands
- Eastern Energy - Thailand
- Directorate General of MIneral and Coal - Indonesia
- Australian Coal Association
- Kideco Jaya Agung - Indonesia
- Ambuja Cements Ltd - India
- Standard Chartered Bank - UAE
- Cement Manufacturers Association - India
- Kohat Cement Company Ltd. - Pakistan
- Holcim Trading Pte Ltd - Singapore
- The State Trading Corporation of India Ltd
- Coal and Oil Company - UAE
- Orica Mining Services - Indonesia
- The University of Queensland
- Ministry of Mines - Canada
- Binh Thuan Hamico - Vietnam
- Tata Chemicals Ltd - India
- Asmin Koalindo Tuhup - Indonesia
- Riau Bara Harum - Indonesia
- Orica Australia Pty. Ltd.
- Bukit Asam (Persero) Tbk - Indonesia
- Bhushan Steel Limited - India
- SMG Consultants - Indonesia
- Medco Energi Mining Internasional
- TeaM Sual Corporation - Philippines
- Simpson Spence & Young - Indonesia
- Ceylon Electricity Board - Sri Lanka
- Neyveli Lignite Corporation Ltd, - India
- Bhoruka Overseas - Indonesia
- Kalimantan Lumbung Energi - Indonesia
- Malabar Cements Ltd - India
- Marubeni Corporation - India
- Meralco Power Generation, Philippines
- Star Paper Mills Limited - India
- Manunggal Multi Energi - Indonesia
- London Commodity Brokers - England
- Electricity Generating Authority of Thailand
- San Jose City I Power Corp, Philippines
- Chamber of Mines of South Africa
- ICICI Bank Limited - India
- Tamil Nadu electricity Board
- Aditya Birla Group - India
- Parliament of New Zealand
- Pipit Mutiara Jaya. PT, Indonesia
- Metalloyd Limited - United Kingdom
- Offshore Bulk Terminal Pte Ltd, Singapore
- Mjunction Services Limited - India
- Indogreen Group - Indonesia
- Directorate Of Revenue Intelligence - India
- Vizag Seaport Private Limited - India
- Gujarat Mineral Development Corp Ltd - India
- Jindal Steel & Power Ltd - India
- Bangladesh Power Developement Board
|
| |
| |
|