CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Friday, 02 February 24
DRY BULK MARKET: THE DOWNWARD REVISION IN THE GROWTH OF CAPESIZE TONNE DAYS IN JANUARY WITH THE BCI DROPPING - MARIA BERTZELETOU
In the last week of January, the dry freight market sustained weakness in the Capesize segment, while the number of ballasters in the Southeast (SE ...


Friday, 02 February 24
COAL INDIA ACHIEVES NEARLY 80% OF ITS FY24 PRODUCTION TARGET IN TEN MONTHS - CNBCTV18
For the month of January, the company’s production grew by 9.1% from the same period last year to 78.4 Million Tonnes (MT), from 71.9 MT last ...


Thursday, 01 February 24
CHINA'S WIND, SOLAR CAPACITY TO OVERTAKE COAL IN 2024 - INDUSTRY BODY, REUTERS REPORTED
China’s installed wind and solar capacity is expected to overtake coal for the first time this year, according to industry forecasts. &nb ...


Thursday, 01 February 24
ANTI-DEDUCTION CLAUSES: CAN A CHARTERER WITHHOLD HIRE WITHOUT AN OWNER'S CONSENT? - SKULD
KNOWLEDGE TO ELEVATE Summary In The Anna Dorothea, the Court found that where a charterparty provides that no deduction from hire may be m ...


Thursday, 01 February 24
INDIA REBUILDS COAL STOCKS TO ENSURE ELECTRIC RELIABILITY - REUTERS
India’s electricity supply is much more comfortable at the start of 2024 than in either 2023 or 2022 as coal production has ramped up and the ...


   7 8 9 10 11   
Showing 41 to 45 news of total 6871
News by Category
Popular News
 
Total Members : 28,623
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Toyota Tsusho Corporation, Japan
  • Bharathi Cement Corporation - India
  • Meralco Power Generation, Philippines
  • Ministry of Mines - Canada
  • GAC Shipping (India) Pvt Ltd
  • Renaissance Capital - South Africa
  • Dalmia Cement Bharat India
  • ETA - Dubai
  • Mitra SK Pvt Ltd - India
  • Xstrata Coal
  • GMR Energy Limited - India
  • Britmindo - Indonesia
  • ANZ Bank - Australia
  • Jindal Steel & Power Ltd - India
  • Australian Commodity Traders Exchange
  • Indian Energy Exchange, India
  • CCIC - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • Essar Steel Hazira Ltd - India
  • Vedanta Resources Plc - India
  • Sical Logistics Limited - India
  • Shree Cement - India
  • India Bulls Power Limited - India
  • Kohat Cement Company Ltd. - Pakistan
  • Aboitiz Power Corporation - Philippines
  • Savvy Resources Ltd - HongKong
  • GN Power Mariveles Coal Plant, Philippines
  • San Jose City I Power Corp, Philippines
  • Trasteel International SA, Italy
  • Asmin Koalindo Tuhup - Indonesia
  • Medco Energi Mining Internasional
  • Miang Besar Coal Terminal - Indonesia
  • Kepco SPC Power Corporation, Philippines
  • Merrill Lynch Commodities Europe
  • Mitsui
  • Gujarat Mineral Development Corp Ltd - India
  • GHCL Limited - India
  • Jatenergy - Australia
  • Metalloyd Limited - United Kingdom
  • KPCL - India
  • International Coal Ventures Pvt Ltd - India
  • Central Java Power - Indonesia
  • Iligan Light & Power Inc, Philippines
  • SN Aboitiz Power Inc, Philippines
  • Kartika Selabumi Mining - Indonesia
  • Argus Media - Singapore
  • Bhoruka Overseas - Indonesia
  • Thermax Limited - India
  • Total Coal South Africa
  • PetroVietnam
  • AsiaOL BioFuels Corp., Philippines
  • Indonesian Coal Mining Association
  • White Energy Company Limited
  • Romanian Commodities Exchange
  • Intertek Mineral Services - Indonesia
  • Lafarge - France
  • Banpu Public Company Limited - Thailand
  • Rashtriya Ispat Nigam Limited - India
  • Petron Corporation, Philippines
  • Indian School of Mines
  • IBC Asia (S) Pte Ltd
  • Core Mineral Indonesia
  • Salva Resources Pvt Ltd - India
  • Mechel - Russia
  • PTC India Limited - India
  • UOB Asia (HK) Ltd
  • Bukit Baiduri Energy - Indonesia
  • Anglo American - United Kingdom
  • Asian Development Bank
  • Vizag Seaport Private Limited - India
  • Clarksons - UK
  • Australian Coal Association
  • VISA Power Limited - India
  • Antam Resourcindo - Indonesia
  • Runge Indonesia
  • Arch Coal - USA
  • Pendopo Energi Batubara - Indonesia
  • Wood Mackenzie - Singapore
  • Maheswari Brothers Coal Limited - India
  • GVK Power & Infra Limited - India
  • Global Coal Blending Company Limited - Australia
  • Samsung - South Korea
  • Aditya Birla Group - India
  • globalCOAL - UK
  • Thomson Reuters GRC
  • Meenaskhi Energy Private Limited - India
  • KOWEPO - South Korea
  • Ambuja Cements Ltd - India
  • SUEK AG - Indonesia
  • Thiess Contractors Indonesia
  • Marubeni Corporation - India
  • Maersk Broker
  • Videocon Industries ltd - India
  • Power Finance Corporation Ltd., India
  • PowerSource Philippines DevCo
  • Directorate Of Revenue Intelligence - India
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Tanito Harum - Indonesia
  • Siam City Cement PLC, Thailand
  • Formosa Plastics Group - Taiwan
  • Panama Canal Authority
  • The Treasury - Australian Government
  • Jorong Barutama Greston.PT - Indonesia
  • Coeclerici Indonesia
  • SMC Global Power, Philippines
  • Karbindo Abesyapradhi - Indoneisa
  • Kideco Jaya Agung - Indonesia
  • Orica Mining Services - Indonesia
  • Makarim & Taira - Indonesia
  • Tata Chemicals Ltd - India
  • Credit Suisse - India
  • GB Group - China
  • Uttam Galva Steels Limited - India
  • Infraline Energy - India
  • Independent Power Producers Association of India
  • Sucofindo - Indonesia
  • Georgia Ports Authority, United States
  • Simpson Spence & Young - Indonesia
  • RBS Sempra - UK
  • Humpuss - Indonesia
  • Peabody Energy - USA
  • TeaM Sual Corporation - Philippines
  • Bank of America
  • TNPL - India
  • Ind-Barath Power Infra Limited - India
  • ASAPP Information Group - India
  • Eastern Energy - Thailand
  • IOL Indonesia
  • World Coal - UK
  • Cebu Energy, Philippines
  • The India Cements Ltd
  • Global Green Power PLC Corporation, Philippines
  • Qatrana Cement - Jordan
  • Shenhua Group - China
  • Agrawal Coal Company - India
  • PetroVietnam Power Coal Import and Supply Company
  • Billiton Holdings Pty Ltd - Australia
  • Leighton Contractors Pty Ltd - Australia
  • Madhucon Powers Ltd - India
  • Gujarat Sidhee Cement - India
  • Oldendorff Carriers - Singapore
  • Goldman Sachs - Singapore
  • Minerals Council of Australia
  • Bank of China, Malaysia
  • Ernst & Young Pvt. Ltd.
  • Holcim Trading Pte Ltd - Singapore
  • TRAFIGURA, South Korea
  • Deutsche Bank - India
  • OPG Power Generation Pvt Ltd - India
  • Manunggal Multi Energi - Indonesia
  • Interocean Group of Companies - India
  • Platou - Singapore
  • Mercuria Energy - Indonesia
  • Pipit Mutiara Jaya. PT, Indonesia
  • Idemitsu - Japan
  • Sree Jayajothi Cements Limited - India
  • CESC Limited - India
  • Price Waterhouse Coopers - Russia
  • Therma Luzon, Inc, Philippines
  • Coaltrans Conferences
  • Enel Italy
  • Indian Oil Corporation Limited
  • LBH Netherlands Bv - Netherlands
  • MS Steel International - UAE
  • Cargill India Pvt Ltd
  • JPMorgan - India
  • Parry Sugars Refinery, India
  • World Bank
  • GNFC Limited - India
  • Mintek Dendrill Indonesia
  • Reliance Power - India
  • Energy Development Corp, Philippines
  • Bangkok Bank PCL
  • Moodys - Singapore
  • Altura Mining Limited, Indonesia
  • Borneo Indobara - Indonesia
  • Pinang Coal Indonesia
  • Noble Europe Ltd - UK
  • Sarangani Energy Corporation, Philippines
  • Latin American Coal - Colombia
  • Tamil Nadu electricity Board
  • Directorate General of MIneral and Coal - Indonesia
  • Japan Coal Energy Center
  • Riau Bara Harum - Indonesia
  • Adaro Indonesia
  • HSBC - Hong Kong
  • Vale Mozambique
  • ACC Limited - India
  • J M Baxi & Co - India
  • Cigading International Bulk Terminal - Indonesia
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • MEC Coal - Indonesia
  • Globalindo Alam Lestari - Indonesia
  • Central Electricity Authority - India
  • Fearnleys - India
  • Wilmar Investment Holdings
  • Vijayanagar Sugar Pvt Ltd - India
  • DBS Bank - Singapore
  • Barclays Capital - USA
  • Freeport Indonesia
  • BNP Paribas - Singapore
  • OCBC - Singapore
  • Baramulti Group, Indonesia
  • Cement Manufacturers Association - India
  • Indika Energy - Indonesia
  • New Zealand Coal & Carbon
  • Russian Coal LLC
  • SMG Consultants - Indonesia
  • Singapore Mercantile Exchange
  • Semirara Mining Corp, Philippines
  • Kalimantan Lumbung Energi - Indonesia
  • Commonwealth Bank - Australia
  • Bhatia International Limited - India
  • Lanco Infratech Ltd - India
  • CoalTek, United States
  • Rudhra Energy - India
  • Chamber of Mines of South Africa
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Africa Commodities Group - South Africa
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Tata Power - India
  • Vitol - Bahrain
  • Rio Tinto Coal - Australia
  • Xindia Steels Limited - India
  • Glencore India Pvt. Ltd
  • Siam City Cement - Thailand
  • Maruti Cements - India
  • Bayan Resources Tbk. - Indonesia
  • Cosco
  • Bahari Cakrawala Sebuku - Indonesia
  • Indo Tambangraya Megah - Indonesia
  • Coalindo Energy - Indonesia
  • McKinsey & Co - India
  • Parliament of New Zealand
  • Larsen & Toubro Limited - India
  • Indonesia Power. PT
  • EMO - The Netherlands
  • Grasim Industreis Ltd - India
  • Surastha Cement
  • bp singapore
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Kobexindo Tractors - Indoneisa
  • Thailand Anthracite
  • Bulk Trading Sa - Switzerland
  • IEA Clean Coal Centre - UK
  • Platts
  • Electricity Generating Authority of Thailand
  • Samtan Co., Ltd - South Korea
  • South Luzon Thermal Energy Corporation
  • IMC Shipping - Singapore
  • Economic Council, Georgia
  • Coal India Limited
  • CNBM International Corporation - China
  • London Commodity Brokers - England
  • Krishnapatnam Port Company Ltd. - India
  • Cemex - Philippines
  • Kumho Petrochemical, South Korea
  • Edison Trading Spa - Italy
  • PNOC Exploration Corporation - Philippines
  • Thai Mozambique Logistica
  • Port Waratah Coal Services - Australia
  • Mercator Lines Limited - India
  • JPower - Japan
  • Neyveli Lignite Corporation Ltd, - India
  • Timah Investasi Mineral - Indoneisa
  • Eastern Coal Council - USA
  • WorleyParsons
  • Cardiff University - UK
  • Bukit Asam (Persero) Tbk - Indonesia
  • CIMB Investment Bank - Malaysia
  • Petrochimia International Co. Ltd.- Taiwan
  • Sakthi Sugars Limited - India
  • Berau Coal - Indonesia
  • Bhushan Steel Limited - India
  • ICICI Bank Limited - India
  • SASOL - South Africa
  • ING Bank NV - Singapore
  • KPMG - USA
  • Adani Power Ltd - India
  • Thriveni
  • Semirara Mining and Power Corporation, Philippines
  • TANGEDCO India
  • Posco Energy - South Korea
  • Indorama - Singapore
  • Barasentosa Lestari - Indonesia
  • Karaikal Port Pvt Ltd - India
  • UBS Singapore
  • NTPC Limited - India
  • Straits Asia Resources Limited - Singapore
  • Deloitte Consulting - India
  • TGV SRAAC LIMITED, India
  • Bukit Makmur.PT - Indonesia
  • U S Energy Resources
  • Arutmin Indonesia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • PLN Batubara - Indonesia
  • Attock Cement Pakistan Limited
  • APGENCO India
  • Sindya Power Generating Company Private Ltd
  • Coal Orbis AG
  • Global Business Power Corporation, Philippines
  • BRS Brokers - Singapore
  • KEPCO - South Korea
  • The State Trading Corporation of India Ltd
  • SRK Consulting
  • Malco - India
  • Maharashtra Electricity Regulatory Commission - India
  • Ceylon Electricity Board - Sri Lanka
  • SGS (Thailand) Limited
  • Binh Thuan Hamico - Vietnam
  • Merrill Lynch Bank
  • McConnell Dowell - Australia
  • Ministry of Transport, Egypt
  • Gupta Coal India Ltd
  • The University of Queensland
  • Carbofer General Trading SA - India
  • Bangladesh Power Developement Board
  • Gujarat Electricity Regulatory Commission - India
  • TNB Fuel Sdn Bhd - Malaysia
  • Gresik Semen - Indonesia
  • Asia Cement - Taiwan
  • Maybank - Singapore
  • Indogreen Group - Indonesia
  • Kapuas Tunggal Persada - Indonesia
  • Heidelberg Cement - Germany
  • Star Paper Mills Limited - India
  • Jaiprakash Power Ventures ltd
  • Orica Australia Pty. Ltd.
  • Mitsubishi Corporation
  • Sojitz Corporation - Japan
  • NALCO India
  • Planning Commission, India
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Mjunction Services Limited - India
  • Kaltim Prima Coal - Indonesia
  • IHS Mccloskey Coal Group - USA
  • Standard Chartered Bank - UAE
  • European Bulk Services B.V. - Netherlands
  • Inspectorate - India
  • Sinarmas Energy and Mining - Indonesia
  • PLN - Indonesia
  • Petrosea - Indonesia
  • Permata Bank - Indonesia
  • Coal and Oil Company - UAE
  • Malabar Cements Ltd - India
  • Geoservices-GeoAssay Lab
  • Coastal Gujarat Power Limited - India
  • Energy Link Ltd, New Zealand
  • EIA - United States
  • Ministry of Finance - Indonesia
  • Inco-Indonesia
  • Ince & co LLP
  • Kobe Steel Ltd - Japan
  • Electricity Authority, New Zealand
  • Chettinad Cement Corporation Ltd - India