CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Friday, 22 March 24
INDONESIA APPROVES 922.14 MLN T COAL PRODUCTION QUOTA FOR 2024, ABOVE TARGET - REUTERS
Indonesia has approved coal production quotas totalling 922.14 million metric tons for 2024, Bambang Suswantono, a senior official at the mining mi ...
Friday, 22 March 24
CHINA COAL INDUSTRY GROUP EXPECTS OUTPUT GROWTH TO SLOW IN 2024 - REUTERS
China’s coal output is expected to increase 36 million metric tons, or 0.8%, to about 4.7 billion tonnes in 2024, a Chinese coal industry gro ...
Monday, 18 March 24
THREE KEY TAKEAWAYS FROM OUR EUROPE GAS MARKETS SHORT-TERM OUTLOOK Q1 2024 - WOOD MACKENZIE
European gas prices are currently back to pre-crisis levels, but with a complex series of factors affecting future supply and demand, are they set ...
Wednesday, 06 March 24
INDONESIA AIMS TO FINISH MINING OUTPUT QUOTAS APPROVAL BY END-MARCH, OFFICIAL SAYS - REUTERS
Indonesia’s has approved the mining production quotarequests from more than 120mineral companies and aims to complete the approval process th ...
Monday, 04 March 24
IS YOUR GUARANTEE A GUARANTEE? NOTE TO SHIPOWNERS - GARD
KNOWLEDGE TO ELEVATE
The law of guarantees is not always obvious or easy to understand without proper guidance. This article clarifies the dif ...
|
|
|
Showing 26 to 30 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Larsen & Toubro Limited - India
- Carbofer General Trading SA - India
- India Bulls Power Limited - India
- Chettinad Cement Corporation Ltd - India
- Sakthi Sugars Limited - India
- Indian Energy Exchange, India
- LBH Netherlands Bv - Netherlands
- Intertek Mineral Services - Indonesia
- Cement Manufacturers Association - India
- Billiton Holdings Pty Ltd - Australia
- Bhatia International Limited - India
- VISA Power Limited - India
- Sojitz Corporation - Japan
- Salva Resources Pvt Ltd - India
- Merrill Lynch Commodities Europe
- Independent Power Producers Association of India
- Binh Thuan Hamico - Vietnam
- PowerSource Philippines DevCo
- Electricity Authority, New Zealand
- Semirara Mining and Power Corporation, Philippines
- Kartika Selabumi Mining - Indonesia
- Marubeni Corporation - India
- Globalindo Alam Lestari - Indonesia
- GVK Power & Infra Limited - India
- Bukit Baiduri Energy - Indonesia
- Leighton Contractors Pty Ltd - Australia
- European Bulk Services B.V. - Netherlands
- Siam City Cement PLC, Thailand
- White Energy Company Limited
- South Luzon Thermal Energy Corporation
- Bahari Cakrawala Sebuku - Indonesia
- Mintek Dendrill Indonesia
- IHS Mccloskey Coal Group - USA
- Rashtriya Ispat Nigam Limited - India
- TeaM Sual Corporation - Philippines
- GMR Energy Limited - India
- Madhucon Powers Ltd - India
- PNOC Exploration Corporation - Philippines
- Kumho Petrochemical, South Korea
- Port Waratah Coal Services - Australia
- Deloitte Consulting - India
- Malabar Cements Ltd - India
- Tamil Nadu electricity Board
- Wilmar Investment Holdings
- Kideco Jaya Agung - Indonesia
- Bhushan Steel Limited - India
- The University of Queensland
- Borneo Indobara - Indonesia
- Tata Chemicals Ltd - India
- San Jose City I Power Corp, Philippines
- Economic Council, Georgia
- Maheswari Brothers Coal Limited - India
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Wood Mackenzie - Singapore
- Bhoruka Overseas - Indonesia
- Vedanta Resources Plc - India
- Sree Jayajothi Cements Limited - India
- Indonesian Coal Mining Association
- The Treasury - Australian Government
- Siam City Cement - Thailand
- Simpson Spence & Young - Indonesia
- PetroVietnam Power Coal Import and Supply Company
- Bukit Makmur.PT - Indonesia
- Chamber of Mines of South Africa
- Vizag Seaport Private Limited - India
- Jaiprakash Power Ventures ltd
- Lanco Infratech Ltd - India
- GAC Shipping (India) Pvt Ltd
- Indian Oil Corporation Limited
- Toyota Tsusho Corporation, Japan
- Oldendorff Carriers - Singapore
- Indo Tambangraya Megah - Indonesia
- Krishnapatnam Port Company Ltd. - India
- Orica Mining Services - Indonesia
- Kobexindo Tractors - Indoneisa
- Miang Besar Coal Terminal - Indonesia
- Ceylon Electricity Board - Sri Lanka
- Planning Commission, India
- Petron Corporation, Philippines
- Eastern Energy - Thailand
- Riau Bara Harum - Indonesia
- Altura Mining Limited, Indonesia
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Offshore Bulk Terminal Pte Ltd, Singapore
- Mercuria Energy - Indonesia
- Attock Cement Pakistan Limited
- Kohat Cement Company Ltd. - Pakistan
- SMC Global Power, Philippines
- Renaissance Capital - South Africa
- Vijayanagar Sugar Pvt Ltd - India
- Karbindo Abesyapradhi - Indoneisa
- Electricity Generating Authority of Thailand
- Asmin Koalindo Tuhup - Indonesia
- Aditya Birla Group - India
- Orica Australia Pty. Ltd.
- Ministry of Transport, Egypt
- IEA Clean Coal Centre - UK
- Energy Link Ltd, New Zealand
- Romanian Commodities Exchange
- Samtan Co., Ltd - South Korea
- Indogreen Group - Indonesia
- Jorong Barutama Greston.PT - Indonesia
- Parliament of New Zealand
- Holcim Trading Pte Ltd - Singapore
- Xindia Steels Limited - India
- Baramulti Group, Indonesia
- Indika Energy - Indonesia
- International Coal Ventures Pvt Ltd - India
- Goldman Sachs - Singapore
- Price Waterhouse Coopers - Russia
- Grasim Industreis Ltd - India
- Uttam Galva Steels Limited - India
- TNB Fuel Sdn Bhd - Malaysia
- Sindya Power Generating Company Private Ltd
- Edison Trading Spa - Italy
- Kapuas Tunggal Persada - Indonesia
- Ministry of Finance - Indonesia
- Semirara Mining Corp, Philippines
- Asia Pacific Energy Resources Ventures Inc, Philippines
- SN Aboitiz Power Inc, Philippines
- AsiaOL BioFuels Corp., Philippines
- Thiess Contractors Indonesia
- Bangladesh Power Developement Board
- Gujarat Sidhee Cement - India
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Mjunction Services Limited - India
- Kalimantan Lumbung Energi - Indonesia
- Parry Sugars Refinery, India
- Petrochimia International Co. Ltd.- Taiwan
- Standard Chartered Bank - UAE
- SMG Consultants - Indonesia
- Kepco SPC Power Corporation, Philippines
- Coalindo Energy - Indonesia
- Antam Resourcindo - Indonesia
- Ministry of Mines - Canada
- Rio Tinto Coal - Australia
- Neyveli Lignite Corporation Ltd, - India
- The State Trading Corporation of India Ltd
- Africa Commodities Group - South Africa
- Sical Logistics Limited - India
- Thai Mozambique Logistica
- Global Business Power Corporation, Philippines
- Trasteel International SA, Italy
- Sarangani Energy Corporation, Philippines
- Energy Development Corp, Philippines
- Ambuja Cements Ltd - India
- PTC India Limited - India
- London Commodity Brokers - England
- Pipit Mutiara Jaya. PT, Indonesia
- Australian Commodity Traders Exchange
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Jindal Steel & Power Ltd - India
- Bukit Asam (Persero) Tbk - Indonesia
- Interocean Group of Companies - India
- OPG Power Generation Pvt Ltd - India
- Bulk Trading Sa - Switzerland
- McConnell Dowell - Australia
- Essar Steel Hazira Ltd - India
- ASAPP Information Group - India
- Maharashtra Electricity Regulatory Commission - India
- Power Finance Corporation Ltd., India
- Central Java Power - Indonesia
- Directorate General of MIneral and Coal - Indonesia
- Savvy Resources Ltd - HongKong
- Ind-Barath Power Infra Limited - India
- Star Paper Mills Limited - India
- Global Green Power PLC Corporation, Philippines
- CNBM International Corporation - China
- Coastal Gujarat Power Limited - India
- ICICI Bank Limited - India
- Therma Luzon, Inc, Philippines
- Sinarmas Energy and Mining - Indonesia
- Central Electricity Authority - India
- Singapore Mercantile Exchange
- Cigading International Bulk Terminal - Indonesia
- Eastern Coal Council - USA
- Medco Energi Mining Internasional
- Commonwealth Bank - Australia
- Bank of Tokyo Mitsubishi UFJ Ltd
- Alfred C Toepfer International GmbH - Germany
- CIMB Investment Bank - Malaysia
- Global Coal Blending Company Limited - Australia
- Aboitiz Power Corporation - Philippines
- Makarim & Taira - Indonesia
- Metalloyd Limited - United Kingdom
- Australian Coal Association
- Timah Investasi Mineral - Indoneisa
- Straits Asia Resources Limited - Singapore
- GN Power Mariveles Coal Plant, Philippines
- Posco Energy - South Korea
- Kaltim Prima Coal - Indonesia
- Coal and Oil Company - UAE
- Heidelberg Cement - Germany
- Georgia Ports Authority, United States
- Meenaskhi Energy Private Limited - India
- Banpu Public Company Limited - Thailand
- Meralco Power Generation, Philippines
- Minerals Council of Australia
- Anglo American - United Kingdom
- Iligan Light & Power Inc, Philippines
- Agrawal Coal Company - India
- Barasentosa Lestari - Indonesia
- MS Steel International - UAE
- Formosa Plastics Group - Taiwan
- Manunggal Multi Energi - Indonesia
- Mercator Lines Limited - India
- Latin American Coal - Colombia
- Bayan Resources Tbk. - Indonesia
- Directorate Of Revenue Intelligence - India
- Dalmia Cement Bharat India
- New Zealand Coal & Carbon
- Videocon Industries ltd - India
- Karaikal Port Pvt Ltd - India
- Gujarat Electricity Regulatory Commission - India
- Bharathi Cement Corporation - India
- Pendopo Energi Batubara - Indonesia
- Gujarat Mineral Development Corp Ltd - India
|
| |
| |
|