COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Thursday, 11 June 20
JAN-MAY, INDONESIA SHIPPED 175.15 MILLION TONS OF COAL TO ITS OVERSEAS BUYERS
Indonesia's coal production for the first 5 months of this year have reached 228 million tons. January – May 2020, Indonesia shipped US$ ...


Thursday, 11 June 20
CHINA'S BENCHMARK POWER COAL PRICE EDGES UP - XINHUA
China’s benchmark power coal price rose slightly during the past week.   The Bohai-Rim Steam-Coal Price Index (BSPI), a gauge of ...


Wednesday, 10 June 20
OPEC+ CUTS EXTENSION TO ACCELERATE MARKET REBALANCING - FITCH RATINGS
Fitch Ratings-London-08 June 2020: The OPEC+ agreement to extend by one month record oil production cuts should accelerate market rebalancing, Fitc ...


Wednesday, 10 June 20
MARKET INSIGHT - INTERMODAL
In contrast to the economic projections of the past two years for the first half of 2020, the oil & gas industry and those involved in it faced ...


Wednesday, 10 June 20
CHINA TAIYUAN COAL TRANSACTION PRICE INDEX DOWN 0.19 PCT - XINHUA
China Taiyuan coal transaction price index stood at 123.71 points Monday, down 0.19 percent week on week.   The index, released by Chi ...


   182 183 184 185 186   
Showing 916 to 920 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • The State Trading Corporation of India Ltd
  • Asmin Koalindo Tuhup - Indonesia
  • LBH Netherlands Bv - Netherlands
  • Mitsui
  • Chettinad Cement Corporation Ltd - India
  • KEPCO - South Korea
  • Indonesian Coal Mining Association
  • Borneo Indobara - Indonesia
  • New Zealand Coal & Carbon
  • Noble Europe Ltd - UK
  • Arch Coal - USA
  • Salva Resources Pvt Ltd - India
  • IEA Clean Coal Centre - UK
  • Bhoruka Overseas - Indonesia
  • Coal India Limited
  • Wood Mackenzie - Singapore
  • ACC Limited - India
  • Manunggal Multi Energi - Indonesia
  • Maruti Cements - India
  • Vijayanagar Sugar Pvt Ltd - India
  • AsiaOL BioFuels Corp., Philippines
  • Gujarat Mineral Development Corp Ltd - India
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Leighton Contractors Pty Ltd - Australia
  • Barasentosa Lestari - Indonesia
  • UOB Asia (HK) Ltd
  • SMC Global Power, Philippines
  • NTPC Limited - India
  • TeaM Sual Corporation - Philippines
  • Sinarmas Energy and Mining - Indonesia
  • Clarksons - UK
  • Wilmar Investment Holdings
  • Xstrata Coal
  • Japan Coal Energy Center
  • Sakthi Sugars Limited - India
  • Posco Energy - South Korea
  • ICICI Bank Limited - India
  • Inspectorate - India
  • Thermax Limited - India
  • Independent Power Producers Association of India
  • SMG Consultants - Indonesia
  • Sindya Power Generating Company Private Ltd
  • Kohat Cement Company Ltd. - Pakistan
  • Kapuas Tunggal Persada - Indonesia
  • McConnell Dowell - Australia
  • Shenhua Group - China
  • The Treasury - Australian Government
  • Jorong Barutama Greston.PT - Indonesia
  • KPCL - India
  • Central Java Power - Indonesia
  • Freeport Indonesia
  • Heidelberg Cement - Germany
  • Meenaskhi Energy Private Limited - India
  • Coaltrans Conferences
  • Rio Tinto Coal - Australia
  • Geoservices-GeoAssay Lab
  • KPMG - USA
  • Iligan Light & Power Inc, Philippines
  • South Luzon Thermal Energy Corporation
  • Power Finance Corporation Ltd., India
  • Videocon Industries ltd - India
  • Altura Mining Limited, Indonesia
  • Banpu Public Company Limited - Thailand
  • Rashtriya Ispat Nigam Limited - India
  • TANGEDCO India
  • Ind-Barath Power Infra Limited - India
  • PetroVietnam Power Coal Import and Supply Company
  • Deutsche Bank - India
  • Straits Asia Resources Limited - Singapore
  • Barclays Capital - USA
  • Kumho Petrochemical, South Korea
  • DBS Bank - Singapore
  • Berau Coal - Indonesia
  • globalCOAL - UK
  • Neyveli Lignite Corporation Ltd, - India
  • Bukit Baiduri Energy - Indonesia
  • Petron Corporation, Philippines
  • Standard Chartered Bank - UAE
  • Anglo American - United Kingdom
  • Bhatia International Limited - India
  • Sical Logistics Limited - India
  • Sucofindo - Indonesia
  • Global Green Power PLC Corporation, Philippines
  • JPMorgan - India
  • Eastern Coal Council - USA
  • Jindal Steel & Power Ltd - India
  • Thailand Anthracite
  • Bukit Makmur.PT - Indonesia
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Coalindo Energy - Indonesia
  • Bangladesh Power Developement Board
  • Electricity Authority, New Zealand
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Maharashtra Electricity Regulatory Commission - India
  • EMO - The Netherlands
  • Mjunction Services Limited - India
  • PLN Batubara - Indonesia
  • U S Energy Resources
  • Bangkok Bank PCL
  • Kobe Steel Ltd - Japan
  • Riau Bara Harum - Indonesia
  • Price Waterhouse Coopers - Russia
  • Platou - Singapore
  • Billiton Holdings Pty Ltd - Australia
  • Jaiprakash Power Ventures ltd
  • Electricity Generating Authority of Thailand
  • Gresik Semen - Indonesia
  • Agrawal Coal Company - India
  • Coastal Gujarat Power Limited - India
  • Trasteel International SA, Italy
  • Coal and Oil Company - UAE
  • San Jose City I Power Corp, Philippines
  • Africa Commodities Group - South Africa
  • Tanito Harum - Indonesia
  • OCBC - Singapore
  • Toyota Tsusho Corporation, Japan
  • Panama Canal Authority
  • Directorate Of Revenue Intelligence - India
  • The India Cements Ltd
  • Mercator Lines Limited - India
  • Cosco
  • Interocean Group of Companies - India
  • Humpuss - Indonesia
  • Singapore Mercantile Exchange
  • London Commodity Brokers - England
  • Simpson Spence & Young - Indonesia
  • Krishnapatnam Port Company Ltd. - India
  • Indo Tambangraya Megah - Indonesia
  • Lafarge - France
  • Bharathi Cement Corporation - India
  • MS Steel International - UAE
  • Mitsubishi Corporation
  • HSBC - Hong Kong
  • Indian Oil Corporation Limited
  • Oldendorff Carriers - Singapore
  • Gujarat Sidhee Cement - India
  • TRAFIGURA, South Korea
  • World Coal - UK
  • Pendopo Energi Batubara - Indonesia
  • Malco - India
  • The University of Queensland
  • VISA Power Limited - India
  • J M Baxi & Co - India
  • Baramulti Group, Indonesia
  • Samsung - South Korea
  • Central Electricity Authority - India
  • Renaissance Capital - South Africa
  • GHCL Limited - India
  • Xindia Steels Limited - India
  • Qatrana Cement - Jordan
  • Aditya Birla Group - India
  • Russian Coal LLC
  • Commonwealth Bank - Australia
  • India Bulls Power Limited - India
  • Merrill Lynch Commodities Europe
  • MEC Coal - Indonesia
  • TNPL - India
  • CoalTek, United States
  • Kartika Selabumi Mining - Indonesia
  • SRK Consulting
  • Sarangani Energy Corporation, Philippines
  • Shree Cement - India
  • Essar Steel Hazira Ltd - India
  • Glencore India Pvt. Ltd
  • CESC Limited - India
  • Australian Commodity Traders Exchange
  • Jatenergy - Australia
  • Ministry of Mines - Canada
  • Attock Cement Pakistan Limited
  • PowerSource Philippines DevCo
  • KOWEPO - South Korea
  • CCIC - Indonesia
  • Cargill India Pvt Ltd
  • Arutmin Indonesia
  • Makarim & Taira - Indonesia
  • Intertek Mineral Services - Indonesia
  • Australian Coal Association
  • Sojitz Corporation - Japan
  • CNBM International Corporation - China
  • Alfred C Toepfer International GmbH - Germany
  • Port Waratah Coal Services - Australia
  • Vizag Seaport Private Limited - India
  • BNP Paribas - Singapore
  • Bhushan Steel Limited - India
  • Romanian Commodities Exchange
  • Indonesia Power. PT
  • SASOL - South Africa
  • Economic Council, Georgia
  • NALCO India
  • TNB Fuel Sdn Bhd - Malaysia
  • Deloitte Consulting - India
  • Edison Trading Spa - Italy
  • Antam Resourcindo - Indonesia
  • Indian Energy Exchange, India
  • Vale Mozambique
  • Ambuja Cements Ltd - India
  • Star Paper Mills Limited - India
  • BRS Brokers - Singapore
  • Madhucon Powers Ltd - India
  • Ministry of Finance - Indonesia
  • Miang Besar Coal Terminal - Indonesia
  • Merrill Lynch Bank
  • Thomson Reuters GRC
  • Pinang Coal Indonesia
  • Maersk Broker
  • Indorama - Singapore
  • Meralco Power Generation, Philippines
  • Orica Mining Services - Indonesia
  • Cigading International Bulk Terminal - Indonesia
  • Permata Bank - Indonesia
  • JPower - Japan
  • SUEK AG - Indonesia
  • Infraline Energy - India
  • Asia Cement - Taiwan
  • Energy Development Corp, Philippines
  • Binh Thuan Hamico - Vietnam
  • Latin American Coal - Colombia
  • Idemitsu - Japan
  • Parry Sugars Refinery, India
  • Minerals Council of Australia
  • Reliance Power - India
  • GVK Power & Infra Limited - India
  • Goldman Sachs - Singapore
  • Tata Chemicals Ltd - India
  • Credit Suisse - India
  • Mitra SK Pvt Ltd - India
  • IBC Asia (S) Pte Ltd
  • Core Mineral Indonesia
  • Semirara Mining and Power Corporation, Philippines
  • Larsen & Toubro Limited - India
  • Karaikal Port Pvt Ltd - India
  • Eastern Energy - Thailand
  • APGENCO India
  • GMR Energy Limited - India
  • GAC Shipping (India) Pvt Ltd
  • Mechel - Russia
  • UBS Singapore
  • Fearnleys - India
  • Formosa Plastics Group - Taiwan
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Tamil Nadu electricity Board
  • Total Coal South Africa
  • Gujarat Electricity Regulatory Commission - India
  • Thriveni
  • Cebu Energy, Philippines
  • Semirara Mining Corp, Philippines
  • Platts
  • Kobexindo Tractors - Indoneisa
  • Petrochimia International Co. Ltd.- Taiwan
  • IMC Shipping - Singapore
  • GN Power Mariveles Coal Plant, Philippines
  • Bulk Trading Sa - Switzerland
  • GNFC Limited - India
  • Savvy Resources Ltd - HongKong
  • Cemex - Philippines
  • Global Coal Blending Company Limited - Australia
  • Cardiff University - UK
  • SN Aboitiz Power Inc, Philippines
  • Britmindo - Indonesia
  • PetroVietnam
  • Aboitiz Power Corporation - Philippines
  • World Bank
  • Petrosea - Indonesia
  • Orica Australia Pty. Ltd.
  • Indian School of Mines
  • Lanco Infratech Ltd - India
  • Thiess Contractors Indonesia
  • Therma Luzon, Inc, Philippines
  • Pipit Mutiara Jaya. PT, Indonesia
  • Maybank - Singapore
  • Timah Investasi Mineral - Indoneisa
  • Gupta Coal India Ltd
  • Ceylon Electricity Board - Sri Lanka
  • Peabody Energy - USA
  • PNOC Exploration Corporation - Philippines
  • Inco-Indonesia
  • PLN - Indonesia
  • Adani Power Ltd - India
  • Bukit Asam (Persero) Tbk - Indonesia
  • Planning Commission, India
  • WorleyParsons
  • Metalloyd Limited - United Kingdom
  • Surastha Cement
  • Moodys - Singapore
  • Vedanta Resources Plc - India
  • Vitol - Bahrain
  • IHS Mccloskey Coal Group - USA
  • Tata Power - India
  • SGS (Thailand) Limited
  • Energy Link Ltd, New Zealand
  • McKinsey & Co - India
  • Dalmia Cement Bharat India
  • Indogreen Group - Indonesia
  • Asian Development Bank
  • Indika Energy - Indonesia
  • Ernst & Young Pvt. Ltd.
  • Coal Orbis AG
  • Chamber of Mines of South Africa
  • ASAPP Information Group - India
  • Holcim Trading Pte Ltd - Singapore
  • Maheswari Brothers Coal Limited - India
  • International Coal Ventures Pvt Ltd - India
  • Globalindo Alam Lestari - Indonesia
  • Global Business Power Corporation, Philippines
  • Cement Manufacturers Association - India
  • Kideco Jaya Agung - Indonesia
  • ETA - Dubai
  • Rudhra Energy - India
  • Coeclerici Indonesia
  • Marubeni Corporation - India
  • bp singapore
  • Karbindo Abesyapradhi - Indoneisa
  • Bayan Resources Tbk. - Indonesia
  • TGV SRAAC LIMITED, India
  • Ministry of Transport, Egypt
  • White Energy Company Limited
  • GB Group - China
  • Directorate General of MIneral and Coal - Indonesia
  • Mercuria Energy - Indonesia
  • PTC India Limited - India
  • European Bulk Services B.V. - Netherlands
  • Parliament of New Zealand
  • Ince & co LLP
  • ANZ Bank - Australia
  • Argus Media - Singapore
  • Georgia Ports Authority, United States
  • Mintek Dendrill Indonesia
  • Bank of America
  • Bahari Cakrawala Sebuku - Indonesia
  • Carbofer General Trading SA - India
  • Bank of China, Malaysia
  • Siam City Cement - Thailand
  • Runge Indonesia
  • RBS Sempra - UK
  • Kalimantan Lumbung Energi - Indonesia
  • Medco Energi Mining Internasional
  • Samtan Co., Ltd - South Korea
  • Adaro Indonesia
  • Enel Italy
  • Uttam Galva Steels Limited - India
  • Kepco SPC Power Corporation, Philippines
  • EIA - United States
  • Siam City Cement PLC, Thailand
  • CIMB Investment Bank - Malaysia
  • Thai Mozambique Logistica
  • Sree Jayajothi Cements Limited - India
  • Malabar Cements Ltd - India
  • OPG Power Generation Pvt Ltd - India
  • IOL Indonesia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Kaltim Prima Coal - Indonesia
  • Grasim Industreis Ltd - India
  • ING Bank NV - Singapore