LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Wednesday, 19 August 20
COAL INDIA TRADE UNIONS DEFER DAY-LONG STRIKE: PTI
The unions had decided to go on strike against the commercial mining and the proposed divestment or buyback of shares of Coal India Ltd (CIL). ...


Wednesday, 19 August 20
MISC MARKS ITS MAIDEN FORAY INTO MAJOR DEEP-WATER PROJECT IN LATIN AMERICA WITH MERO 3 FPSO
MISC Berhad (MISC) is pleased to announce its acceptance of Letter of Intent (LOI) from Petróleo Brasileiro S.A. (Petrobras) for the provisi ...


Wednesday, 19 August 20
MARKET INSIGHT - GEORGE LAIOS | INTERMODAL
Since the Covid-19 outbreak, governments and central banks around the globe have been using their ammunition and stimulus packages to keep their ec ...


Wednesday, 19 August 20
INDIA SAW A SHARP DECLINE IN ENERGY COAL IMPORTS IN JANUARY - JUNE 2020; –27 PER CENT YOY - BHP
Energy coal prices were weak in the second half of financial year 2020, BHP says in its Economic and Commodity Outlook FY20.   Accordi ...


Wednesday, 19 August 20
COAL PRICES TO REMAIN SUBDUED THIS FISCAL AMID WEAK DEMAND, HIGH INVENTORY - THE HINDU BUSINESS LINE
Coal offtake is improving gradually as lockdown eases   Coal prices are expected to remain subdued to weak demand and high inventory l ...


   164 165 166 167 168   
Showing 826 to 830 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Electricity Generating Authority of Thailand
  • Platou - Singapore
  • Planning Commission, India
  • SRK Consulting
  • Kobexindo Tractors - Indoneisa
  • BRS Brokers - Singapore
  • Jindal Steel & Power Ltd - India
  • UOB Asia (HK) Ltd
  • Mercator Lines Limited - India
  • Qatrana Cement - Jordan
  • Jaiprakash Power Ventures ltd
  • Orica Australia Pty. Ltd.
  • Samsung - South Korea
  • Jatenergy - Australia
  • KEPCO - South Korea
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Petron Corporation, Philippines
  • Kumho Petrochemical, South Korea
  • GHCL Limited - India
  • Geoservices-GeoAssay Lab
  • Madhucon Powers Ltd - India
  • Core Mineral Indonesia
  • Larsen & Toubro Limited - India
  • IBC Asia (S) Pte Ltd
  • Electricity Authority, New Zealand
  • TANGEDCO India
  • Global Business Power Corporation, Philippines
  • Bank of China, Malaysia
  • World Coal - UK
  • ETA - Dubai
  • Maheswari Brothers Coal Limited - India
  • PetroVietnam Power Coal Import and Supply Company
  • TNPL - India
  • Samtan Co., Ltd - South Korea
  • Merrill Lynch Commodities Europe
  • Argus Media - Singapore
  • The India Cements Ltd
  • London Commodity Brokers - England
  • Commonwealth Bank - Australia
  • Vizag Seaport Private Limited - India
  • OPG Power Generation Pvt Ltd - India
  • Latin American Coal - Colombia
  • EIA - United States
  • Merrill Lynch Bank
  • Vale Mozambique
  • Total Coal South Africa
  • PowerSource Philippines DevCo
  • Price Waterhouse Coopers - Russia
  • KPCL - India
  • Coastal Gujarat Power Limited - India
  • ACC Limited - India
  • Kepco SPC Power Corporation, Philippines
  • Runge Indonesia
  • IMC Shipping - Singapore
  • Sarangani Energy Corporation, Philippines
  • Parry Sugars Refinery, India
  • Enel Italy
  • Directorate General of MIneral and Coal - Indonesia
  • Tamil Nadu electricity Board
  • Gujarat Sidhee Cement - India
  • Economic Council, Georgia
  • Independent Power Producers Association of India
  • Xstrata Coal
  • Kalimantan Lumbung Energi - Indonesia
  • International Coal Ventures Pvt Ltd - India
  • Manunggal Multi Energi - Indonesia
  • Semirara Mining and Power Corporation, Philippines
  • India Bulls Power Limited - India
  • Heidelberg Cement - Germany
  • Britmindo - Indonesia
  • Wilmar Investment Holdings
  • GAC Shipping (India) Pvt Ltd
  • Pinang Coal Indonesia
  • Asian Development Bank
  • Petrochimia International Co. Ltd.- Taiwan
  • San Jose City I Power Corp, Philippines
  • South Luzon Thermal Energy Corporation
  • Sakthi Sugars Limited - India
  • New Zealand Coal & Carbon
  • Rio Tinto Coal - Australia
  • Mercuria Energy - Indonesia
  • PLN - Indonesia
  • Sucofindo - Indonesia
  • Reliance Power - India
  • Intertek Mineral Services - Indonesia
  • Kideco Jaya Agung - Indonesia
  • Ministry of Transport, Egypt
  • Trasteel International SA, Italy
  • Africa Commodities Group - South Africa
  • Renaissance Capital - South Africa
  • Goldman Sachs - Singapore
  • Ceylon Electricity Board - Sri Lanka
  • Bharathi Cement Corporation - India
  • Kobe Steel Ltd - Japan
  • Therma Luzon, Inc, Philippines
  • Siam City Cement PLC, Thailand
  • TRAFIGURA, South Korea
  • PNOC Exploration Corporation - Philippines
  • Medco Energi Mining Internasional
  • McConnell Dowell - Australia
  • Surastha Cement
  • Lanco Infratech Ltd - India
  • Thermax Limited - India
  • Asia Cement - Taiwan
  • Orica Mining Services - Indonesia
  • Glencore India Pvt. Ltd
  • PTC India Limited - India
  • Shenhua Group - China
  • LBH Netherlands Bv - Netherlands
  • Asmin Koalindo Tuhup - Indonesia
  • Pipit Mutiara Jaya. PT, Indonesia
  • Neyveli Lignite Corporation Ltd, - India
  • Rudhra Energy - India
  • World Bank
  • Holcim Trading Pte Ltd - Singapore
  • Petrosea - Indonesia
  • EMO - The Netherlands
  • Deloitte Consulting - India
  • Sindya Power Generating Company Private Ltd
  • bp singapore
  • Thai Mozambique Logistica
  • GB Group - China
  • Makarim & Taira - Indonesia
  • SMC Global Power, Philippines
  • Indogreen Group - Indonesia
  • Australian Coal Association
  • Barasentosa Lestari - Indonesia
  • SASOL - South Africa
  • PetroVietnam
  • Mitsubishi Corporation
  • Gujarat Mineral Development Corp Ltd - India
  • Interocean Group of Companies - India
  • Anglo American - United Kingdom
  • Bayan Resources Tbk. - Indonesia
  • Mjunction Services Limited - India
  • Indian School of Mines
  • The State Trading Corporation of India Ltd
  • KPMG - USA
  • Arutmin Indonesia
  • Globalindo Alam Lestari - Indonesia
  • KOWEPO - South Korea
  • Karbindo Abesyapradhi - Indoneisa
  • TGV SRAAC LIMITED, India
  • JPMorgan - India
  • GMR Energy Limited - India
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Australian Commodity Traders Exchange
  • APGENCO India
  • Coal Orbis AG
  • Vijayanagar Sugar Pvt Ltd - India
  • Kartika Selabumi Mining - Indonesia
  • Malco - India
  • McKinsey & Co - India
  • Inspectorate - India
  • Aboitiz Power Corporation - Philippines
  • Bank of America
  • Altura Mining Limited, Indonesia
  • MS Steel International - UAE
  • Meenaskhi Energy Private Limited - India
  • Coaltrans Conferences
  • Essar Steel Hazira Ltd - India
  • Coal and Oil Company - UAE
  • Attock Cement Pakistan Limited
  • Cigading International Bulk Terminal - Indonesia
  • VISA Power Limited - India
  • Coeclerici Indonesia
  • Gresik Semen - Indonesia
  • Toyota Tsusho Corporation, Japan
  • Standard Chartered Bank - UAE
  • Global Coal Blending Company Limited - Australia
  • IEA Clean Coal Centre - UK
  • Lafarge - France
  • Iligan Light & Power Inc, Philippines
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Borneo Indobara - Indonesia
  • Fearnleys - India
  • Adani Power Ltd - India
  • OCBC - Singapore
  • Cement Manufacturers Association - India
  • Formosa Plastics Group - Taiwan
  • Oldendorff Carriers - Singapore
  • Semirara Mining Corp, Philippines
  • Bukit Asam (Persero) Tbk - Indonesia
  • Aditya Birla Group - India
  • Banpu Public Company Limited - Thailand
  • Rashtriya Ispat Nigam Limited - India
  • Carbofer General Trading SA - India
  • ANZ Bank - Australia
  • SMG Consultants - Indonesia
  • Freeport Indonesia
  • WorleyParsons
  • RBS Sempra - UK
  • Humpuss - Indonesia
  • Bukit Makmur.PT - Indonesia
  • Indo Tambangraya Megah - Indonesia
  • Barclays Capital - USA
  • Maruti Cements - India
  • Indorama - Singapore
  • Thriveni
  • Metalloyd Limited - United Kingdom
  • Karaikal Port Pvt Ltd - India
  • Directorate Of Revenue Intelligence - India
  • globalCOAL - UK
  • Tata Power - India
  • Riau Bara Harum - Indonesia
  • Cardiff University - UK
  • Minerals Council of Australia
  • Central Java Power - Indonesia
  • CoalTek, United States
  • Vitol - Bahrain
  • ICICI Bank Limited - India
  • Power Finance Corporation Ltd., India
  • ASAPP Information Group - India
  • Bhushan Steel Limited - India
  • Edison Trading Spa - Italy
  • Chettinad Cement Corporation Ltd - India
  • Bangladesh Power Developement Board
  • Coal India Limited
  • Gupta Coal India Ltd
  • Sojitz Corporation - Japan
  • Singapore Mercantile Exchange
  • Leighton Contractors Pty Ltd - Australia
  • Thiess Contractors Indonesia
  • Shree Cement - India
  • Grasim Industreis Ltd - India
  • Japan Coal Energy Center
  • DBS Bank - Singapore
  • GVK Power & Infra Limited - India
  • AsiaOL BioFuels Corp., Philippines
  • CIMB Investment Bank - Malaysia
  • Coalindo Energy - Indonesia
  • Bukit Baiduri Energy - Indonesia
  • Mintek Dendrill Indonesia
  • Star Paper Mills Limited - India
  • Cargill India Pvt Ltd
  • Noble Europe Ltd - UK
  • Georgia Ports Authority, United States
  • The University of Queensland
  • Maersk Broker
  • Mitra SK Pvt Ltd - India
  • Binh Thuan Hamico - Vietnam
  • SUEK AG - Indonesia
  • SN Aboitiz Power Inc, Philippines
  • Indian Energy Exchange, India
  • UBS Singapore
  • White Energy Company Limited
  • Kohat Cement Company Ltd. - Pakistan
  • Sical Logistics Limited - India
  • IOL Indonesia
  • Salva Resources Pvt Ltd - India
  • PLN Batubara - Indonesia
  • Agrawal Coal Company - India
  • Indika Energy - Indonesia
  • Ministry of Finance - Indonesia
  • Bulk Trading Sa - Switzerland
  • Alfred C Toepfer International GmbH - Germany
  • NTPC Limited - India
  • Indonesian Coal Mining Association
  • Russian Coal LLC
  • IHS Mccloskey Coal Group - USA
  • Bhatia International Limited - India
  • Cemex - Philippines
  • Baramulti Group, Indonesia
  • Simpson Spence & Young - Indonesia
  • Malabar Cements Ltd - India
  • Ambuja Cements Ltd - India
  • Tanito Harum - Indonesia
  • Eastern Coal Council - USA
  • NALCO India
  • J M Baxi & Co - India
  • Infraline Energy - India
  • Maharashtra Electricity Regulatory Commission - India
  • Indian Oil Corporation Limited
  • Chamber of Mines of South Africa
  • Bhoruka Overseas - Indonesia
  • Mechel - Russia
  • Eastern Energy - Thailand
  • Krishnapatnam Port Company Ltd. - India
  • Bangkok Bank PCL
  • Ministry of Mines - Canada
  • SGS (Thailand) Limited
  • TNB Fuel Sdn Bhd - Malaysia
  • Credit Suisse - India
  • Bahari Cakrawala Sebuku - Indonesia
  • Inco-Indonesia
  • Clarksons - UK
  • Tata Chemicals Ltd - India
  • Cebu Energy, Philippines
  • Savvy Resources Ltd - HongKong
  • Maybank - Singapore
  • JPower - Japan
  • Peabody Energy - USA
  • Antam Resourcindo - Indonesia
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Port Waratah Coal Services - Australia
  • CCIC - Indonesia
  • Parliament of New Zealand
  • Videocon Industries ltd - India
  • Energy Development Corp, Philippines
  • Adaro Indonesia
  • Miang Besar Coal Terminal - Indonesia
  • Romanian Commodities Exchange
  • Jorong Barutama Greston.PT - Indonesia
  • U S Energy Resources
  • Posco Energy - South Korea
  • Uttam Galva Steels Limited - India
  • Kapuas Tunggal Persada - Indonesia
  • MEC Coal - Indonesia
  • TeaM Sual Corporation - Philippines
  • Straits Asia Resources Limited - Singapore
  • Arch Coal - USA
  • Vedanta Resources Plc - India
  • Ind-Barath Power Infra Limited - India
  • Moodys - Singapore
  • Ernst & Young Pvt. Ltd.
  • BNP Paribas - Singapore
  • Kaltim Prima Coal - Indonesia
  • Indonesia Power. PT
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Mitsui
  • ING Bank NV - Singapore
  • CESC Limited - India
  • Thailand Anthracite
  • Thomson Reuters GRC
  • Cosco
  • Berau Coal - Indonesia
  • European Bulk Services B.V. - Netherlands
  • Idemitsu - Japan
  • GNFC Limited - India
  • Permata Bank - Indonesia
  • Siam City Cement - Thailand
  • Meralco Power Generation, Philippines
  • Xindia Steels Limited - India
  • Billiton Holdings Pty Ltd - Australia
  • HSBC - Hong Kong
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Timah Investasi Mineral - Indoneisa
  • Sinarmas Energy and Mining - Indonesia
  • Wood Mackenzie - Singapore
  • Panama Canal Authority
  • Energy Link Ltd, New Zealand
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Global Green Power PLC Corporation, Philippines
  • GN Power Mariveles Coal Plant, Philippines
  • Sree Jayajothi Cements Limited - India
  • Gujarat Electricity Regulatory Commission - India
  • Dalmia Cement Bharat India
  • Pendopo Energi Batubara - Indonesia
  • CNBM International Corporation - China
  • Deutsche Bank - India
  • Central Electricity Authority - India
  • Platts
  • The Treasury - Australian Government
  • Marubeni Corporation - India
  • Ince & co LLP