We welcome article submissions from experts in the areas of coal, mining,
shipping, etc.
To Submit your article please click here.
|
|
|
Monday, 19 January 15
HBA FALL TO FRESH LOWS; COAL OVERSUPPLY WILL CONTINUE TO PUSH PRICE DOWN
COALspot.com - The Ministry of Energy & Mineral Resources of Indonesia revised down Indonesian coal bench mark price this month to US$ 63.84. The January price reference for Indonesian coal fell US$ 0.81 or 1.25% month over month. The declared Indonesian Coal Price Reference for this month was the lowest since May 2009.
January 2015 HBA has dropped to an 67-month low with the government declared HBA falling to US$ 64.65 a ton. Indonesian some small scale coal miners axe jobs and suspend mine operations as falling prices and reduced demand. The highest HBA was declared in February 2011 at US$ 127.05 per MT, which was US$ 63.84 per MT higher than this month’s declared HBA.
The excess coal output compared to a low demand is a significant contributing factor for coal prices fall for last few year. World’s recent oil price decline may also further push down the current coal prices to more deeper or pause the recovery of coal prices.
Indonesian coal benchmark price for January 2015 was calculated based on calorific value of 6,322 kcal/kg (GAR), stated to be using formula based on the December 2014 index average of ICI-1 (Indonesia Coal Index) 25%, Platts-5900 25%, NEX (Newcastle Export Index) 25%, and GC (globalCoal Index) 25%.
 |
Coal price reference was calculated considering coal with GCV (GAR) 6,322 kcal/kg, Total Moisture (arb) 8.00%, Total Sulphur 0.8% (arb), Ash Content 15 % (arb) and delivery free on Board (FOB) Vessel basis and applicable for spot contract, delivery between 1 – 31 January 2015.
The government of Indonesia is publishing a monthly coal price reference (HBA & HPB) since January 2009 to be used by coal producers for all spot and term contracts. However, the official implementation of HBA was commenced since September 2011. According to government regulation, the coal benchmark price must be used by the holders of production operation IUPs, special production operation IUP's, and CCoWs as a reference in determining the coal selling price for particular period.
The declared HBA of January 2015 was 22.05 per cent or $18.06 lower compared to the same period in year 2014. In the meantime, January 2015 HBA was US$ 63.21or 49.75% lower compared to all time high HBA which was declared in month of February 2011.
February 2011 declared HBA was the highest since the launching of HBA by government of Indonesia (US$ 127.05 / MT) and lowest was declared in May 2009 (US$ 62.83/ MT).
The January price was only valid for the spot price (loading on or before 31 January 2015), while as for term price (up to 12 months supplies), the average reference price (HPB) of the previous three months will be used to determine the selling price. (50 percent of the latest available month HPB, 30 per cent of one month prior HPB and 20 percent of two-month prior HPB).
Government also declared price marker for eight brands of Indonesia's coal, which are most commonly traded in the market. Those eight brands are acted as the benchmark and used to calculate other 66 coal types with a quality similar to the coal price markers.
For sales in the barge, the reference price is reduced by barging and trans-shipment costs from barge to vessel. Government has recently issued a regulation (644.K/30/DJB/2013 dated 21 March 2013) to regulate or determine coal prices on FOB barge. Government also fixed the freight for barging, surveyor, insurance and etc., to determine FOB barge price. Trans-shipment cost US$ 4.00/MT + Surveyor cost US$ 0.25/MT + Insurance 0.80% per shipment + Barging cost (for < 270 footer - (US$ 0.0221 X barging distance) + US$ 3.7406, for 270 - 330 footer - (US$ 0.0184 X barging distance) + US$ 3.1172 and > 330 footer - (US$ 0.0154 X barging distance) + US$ 2.6002.
The coal price reference is been established to fulfill the requirement of mining law 04/2009 and ministerial decree No.17/2010. In addition to that, it is aims to increase government revenue from royalties from coal producers.
The coal prices are now trying to settle at new level and it may not possible to see the price levels of year 2008 or 2012 once again in near future. The falling oil prices are now join hands with the excess coal supplies , weak demand to delay the recovery of coal prices from this level to higher level in coming months. It would be nice to see coal prices settle at a point where both the producer and consumer can sustain.
Click here for full details of Indonesian coal price reference since January 2009.(cs).
COALspot.com makes no warranties, express or implied, as to the accuracy adequacy or completeness of the information and assumes no liability in connection with any party use of it. Information contained within the website of COALspot.com is intended for informational purposes only and is not intended as professional counsel and should not be used as such. COALspot.com will endeavor to update information where appropriate, but is under no obligation to do so. All third party users of this website and or data produced or published by the COALspot.com do so at their own risk. Read our Terms of Use | Privacy Policy | Disclaimer before use of this site.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Tuesday, 13 January 15
Q2 CFR SOUTH CHINA COAL SWAP DECLINED 8.66% M-O-M
COALspot.com: API 8 CFR South China Coal swap for Q1’ 2015 delivery declined by US$ 3.48 (-5.73%) month over month and US$ 2.35 (-3.94%) week ...
Tuesday, 13 January 15
Q1' 2015 RICHARDS BAY COAL SWAP SLIGHTLY HIGHER THAN Q2 & Q4 2015 SWAPS
COALspot.com: API 4 FOB Richards Bay Coal swap for delivery Q1' 2015 lost month on month and week over week.
The Q1 swap has lost US$ 7.21 ...
Monday, 12 January 15
COAL: LOW PRICES ARE EXPECTED TO DRIVE A SUPPLY-DRIVEN RECOVERY IN THE MEDIUM TERM - SGX
COALspot.com: Thermal coal prices dropped to six-year lows in 2014 driven by persistent oversupply, SGX says in its “ Commodities 2014 - A ye ...
Monday, 12 January 15
FREIGHT MARKET: 2015 FLEET SUPPLY GROWTH IS EXPECTED TO REMAIN SLIGHTLY AHEAD OF CARGO GROWTH - SGX
COALspot.com: The dry bulk freight market was forced to digest a number of negatives in 2014 leading the Baltic Dry Index to fall 66% through the y ...
Monday, 12 January 15
SHIPPING - CHALLENGES AND RESOLUTIONS - EVA TZIMA
Last year has without a doubt been another challenging one both for both our industry and our country. As Greece is currently dominated by election ...
|
|
|
Showing 3261 to 3265 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Australian Commodity Traders Exchange
- Parliament of New Zealand
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Timah Investasi Mineral - Indoneisa
- VISA Power Limited - India
- Australian Coal Association
- McConnell Dowell - Australia
- Merrill Lynch Commodities Europe
- Minerals Council of Australia
- Formosa Plastics Group - Taiwan
- Eastern Coal Council - USA
- PNOC Exploration Corporation - Philippines
- Oldendorff Carriers - Singapore
- Offshore Bulk Terminal Pte Ltd, Singapore
- Kartika Selabumi Mining - Indonesia
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Energy Link Ltd, New Zealand
- Independent Power Producers Association of India
- Xindia Steels Limited - India
- Posco Energy - South Korea
- Straits Asia Resources Limited - Singapore
- AsiaOL BioFuels Corp., Philippines
- Sarangani Energy Corporation, Philippines
- Maheswari Brothers Coal Limited - India
- Rashtriya Ispat Nigam Limited - India
- Renaissance Capital - South Africa
- CIMB Investment Bank - Malaysia
- Sinarmas Energy and Mining - Indonesia
- Jindal Steel & Power Ltd - India
- Ministry of Finance - Indonesia
- GAC Shipping (India) Pvt Ltd
- PetroVietnam Power Coal Import and Supply Company
- Africa Commodities Group - South Africa
- Meenaskhi Energy Private Limited - India
- LBH Netherlands Bv - Netherlands
- Ministry of Transport, Egypt
- Videocon Industries ltd - India
- Krishnapatnam Port Company Ltd. - India
- Kalimantan Lumbung Energi - Indonesia
- Larsen & Toubro Limited - India
- Baramulti Group, Indonesia
- Mintek Dendrill Indonesia
- Interocean Group of Companies - India
- GN Power Mariveles Coal Plant, Philippines
- Coastal Gujarat Power Limited - India
- Mercator Lines Limited - India
- Globalindo Alam Lestari - Indonesia
- IEA Clean Coal Centre - UK
- Neyveli Lignite Corporation Ltd, - India
- Indonesian Coal Mining Association
- Central Java Power - Indonesia
- Directorate Of Revenue Intelligence - India
- South Luzon Thermal Energy Corporation
- Bukit Baiduri Energy - Indonesia
- Romanian Commodities Exchange
- Lanco Infratech Ltd - India
- Riau Bara Harum - Indonesia
- Vedanta Resources Plc - India
- Bangladesh Power Developement Board
- Bhoruka Overseas - Indonesia
- Energy Development Corp, Philippines
- Karbindo Abesyapradhi - Indoneisa
- Borneo Indobara - Indonesia
- Leighton Contractors Pty Ltd - Australia
- Indogreen Group - Indonesia
- Barasentosa Lestari - Indonesia
- Bank of Tokyo Mitsubishi UFJ Ltd
- IHS Mccloskey Coal Group - USA
- New Zealand Coal & Carbon
- Dalmia Cement Bharat India
- Malabar Cements Ltd - India
- Intertek Mineral Services - Indonesia
- Simpson Spence & Young - Indonesia
- Kumho Petrochemical, South Korea
- Gujarat Electricity Regulatory Commission - India
- SMC Global Power, Philippines
- Bahari Cakrawala Sebuku - Indonesia
- Antam Resourcindo - Indonesia
- Therma Luzon, Inc, Philippines
- Planning Commission, India
- Eastern Energy - Thailand
- Carbofer General Trading SA - India
- Cement Manufacturers Association - India
- Uttam Galva Steels Limited - India
- Chamber of Mines of South Africa
- Altura Mining Limited, Indonesia
- Gujarat Sidhee Cement - India
- Essar Steel Hazira Ltd - India
- Trasteel International SA, Italy
- TeaM Sual Corporation - Philippines
- Vijayanagar Sugar Pvt Ltd - India
- Siam City Cement - Thailand
- Karaikal Port Pvt Ltd - India
- Samtan Co., Ltd - South Korea
- Pendopo Energi Batubara - Indonesia
- Asmin Koalindo Tuhup - Indonesia
- Holcim Trading Pte Ltd - Singapore
- Mjunction Services Limited - India
- Manunggal Multi Energi - Indonesia
- ICICI Bank Limited - India
- Jaiprakash Power Ventures ltd
- PTC India Limited - India
- Maharashtra Electricity Regulatory Commission - India
- Standard Chartered Bank - UAE
- Anglo American - United Kingdom
- Asia Pacific Energy Resources Ventures Inc, Philippines
- Sindya Power Generating Company Private Ltd
- Kaltim Prima Coal - Indonesia
- Grasim Industreis Ltd - India
- Ind-Barath Power Infra Limited - India
- Salva Resources Pvt Ltd - India
- Binh Thuan Hamico - Vietnam
- Ceylon Electricity Board - Sri Lanka
- Makarim & Taira - Indonesia
- Bukit Asam (Persero) Tbk - Indonesia
- Pipit Mutiara Jaya. PT, Indonesia
- Mercuria Energy - Indonesia
- Savvy Resources Ltd - HongKong
- Petrochimia International Co. Ltd.- Taiwan
- TNB Fuel Sdn Bhd - Malaysia
- CNBM International Corporation - China
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- GVK Power & Infra Limited - India
- Thiess Contractors Indonesia
- Madhucon Powers Ltd - India
- Kohat Cement Company Ltd. - Pakistan
- Kideco Jaya Agung - Indonesia
- The Treasury - Australian Government
- Kobexindo Tractors - Indoneisa
- Bhushan Steel Limited - India
- Indo Tambangraya Megah - Indonesia
- European Bulk Services B.V. - Netherlands
- Petron Corporation, Philippines
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- The State Trading Corporation of India Ltd
- Bharathi Cement Corporation - India
- Parry Sugars Refinery, India
- SMG Consultants - Indonesia
- Indian Energy Exchange, India
- Bhatia International Limited - India
- Marubeni Corporation - India
- Bulk Trading Sa - Switzerland
- Semirara Mining Corp, Philippines
- Agrawal Coal Company - India
- OPG Power Generation Pvt Ltd - India
- Power Finance Corporation Ltd., India
- Meralco Power Generation, Philippines
- India Bulls Power Limited - India
- Sakthi Sugars Limited - India
- Wood Mackenzie - Singapore
- Billiton Holdings Pty Ltd - Australia
- Economic Council, Georgia
- SN Aboitiz Power Inc, Philippines
- Aboitiz Power Corporation - Philippines
- Heidelberg Cement - Germany
- Miang Besar Coal Terminal - Indonesia
- Ambuja Cements Ltd - India
- The University of Queensland
- Ministry of Mines - Canada
- Wilmar Investment Holdings
- Global Business Power Corporation, Philippines
- Global Coal Blending Company Limited - Australia
- Aditya Birla Group - India
- Iligan Light & Power Inc, Philippines
- Vizag Seaport Private Limited - India
- Edison Trading Spa - Italy
- White Energy Company Limited
- Sical Logistics Limited - India
- Jorong Barutama Greston.PT - Indonesia
- MS Steel International - UAE
- Chettinad Cement Corporation Ltd - India
- Siam City Cement PLC, Thailand
- Coalindo Energy - Indonesia
- ASAPP Information Group - India
- Price Waterhouse Coopers - Russia
- PowerSource Philippines DevCo
- Georgia Ports Authority, United States
- Latin American Coal - Colombia
- Gujarat Mineral Development Corp Ltd - India
- Kepco SPC Power Corporation, Philippines
- Metalloyd Limited - United Kingdom
- Port Waratah Coal Services - Australia
- San Jose City I Power Corp, Philippines
- Orica Mining Services - Indonesia
- Electricity Authority, New Zealand
- Toyota Tsusho Corporation, Japan
- Coal and Oil Company - UAE
- Thai Mozambique Logistica
- Medco Energi Mining Internasional
- Deloitte Consulting - India
- Sojitz Corporation - Japan
- Central Electricity Authority - India
- Indian Oil Corporation Limited
- Directorate General of MIneral and Coal - Indonesia
- Bayan Resources Tbk. - Indonesia
- GMR Energy Limited - India
- Electricity Generating Authority of Thailand
- Cigading International Bulk Terminal - Indonesia
- Sree Jayajothi Cements Limited - India
- Attock Cement Pakistan Limited
- Semirara Mining and Power Corporation, Philippines
- Banpu Public Company Limited - Thailand
- Rio Tinto Coal - Australia
- International Coal Ventures Pvt Ltd - India
- Tata Chemicals Ltd - India
- Alfred C Toepfer International GmbH - Germany
- Star Paper Mills Limited - India
- Singapore Mercantile Exchange
- Goldman Sachs - Singapore
- Global Green Power PLC Corporation, Philippines
- Commonwealth Bank - Australia
- Indika Energy - Indonesia
- Orica Australia Pty. Ltd.
- London Commodity Brokers - England
- Bukit Makmur.PT - Indonesia
- Kapuas Tunggal Persada - Indonesia
- Tamil Nadu electricity Board
|
| |
| |
|