We welcome article submissions from experts in the areas of coal, mining,
shipping, etc.
To Submit your article please click here.
|
|
|
Monday, 06 October 14
' COAL-BY-WIRE' FROM SUMATRA TO JAVA - THE JAKARTA POST
Coal from the island of Sumatra accounts for most of Indonesia’s low-grade lignite, a low-quality coal that receives a poor price in international markets.
Given this low pricing combined with high transportation costs and the fact that most reserves are located in landlocked areas, it is not feasible to export Sumatra’s coal out of the island.
It is more efficient to use Sumatra’s coal for a mine-mouth power plant, an approach in which we develop a power plant very close to where mines are located, use the low-calorie coal from the mines to feed the plant, and transmit the electricity, rather than transporting a low-value commodity, out of the mines.
With mine-mouth, we no longer require either barges or expensive railway-heavy infrastructure to transport coal; rather we need to have long-distance high-voltage transmission lines to bring “coal-by-wire” from mines to consumer centers, either regions in Sumatra and/or Java-Bali.
Essentially, with “coal-by-wire” we are transporting a higher-value commodity by wire from mines to customers. Coal stays in the landlocked areas and feeds mine-mouth, coal-fired power plants.
“Coal-by-wire” would definitely boost the development of a domestic market for low-grade coal. Today, our market for coal is very thin as we are one of the world’s leading exporters of thermal coal of a high quality in the international market.
Our exports have increased very significantly within the past decade on account of demand from fast-growing Asian economies. More than 80 percent of our coal currently produced is exported.
Indeed, coal is currently the most important source of energy for our economy. For decades coal has accounted for more than half of our power-generation capacity. And this will continue for a half century to come before alternative and cleaner energy sources other than coal become affordably available.
Our economy is also growing, and of course will require more electricity power and therefore coal – challenges that have to be met. Electricity generation now consumes close to 75 million tons per year, and will almost triple in the next 10 to 15 years.
However, domestic use of coal today notoriously suffers from infrastructure bottlenecks. Congested barges and ports, as well as a shortage of railways limit the transportation of coal from coalmines in two coal-producing regions, Kalimantan and Sumatra, to demand centers in Java-Bali, where most of our power plants are located.
The majority of our coal reserves in the two regions are located in landlocked areas that require rail transportation infrastructure to reach ports for export.
Either truck haul or rail is needed to transport the coal to barge ports and terminals.
Truck operating costs are about twice that of rail, but existing rail transportation infrastructure is severely insufficient.
Indonesia’s attempts to improve coal-transport infrastructure for the domestic market have not been very successful. Dedicated coal ports in Kalimantan have been planned for many years, but implementation has again faced bottleneck issues.
Specialized railways for coal in Sumatra have also been initiated, but this concept is still under development and has not yet received a higher-level mandate or legal authorization.
Delays in expanding the capacity of barge and transportation infrastructure cause inefficiencies and high transportation costs in domestic coal utilization. These high costs and infrastructure bottlenecks have held back the development of the domestic market for coal.
Our high-voltage transmission lines are also astonishingly limited. The state-owned electricity company (PLN) operates approximately 40,000 kilometers of transmission lines, with less than 15 percent of this total serving the island of Sumatra.
If we can build more mine-mouth, coal-fired power generation plants we will need to expand our transmission network across the island, interconnected to other transmission systems in Java-Bali.
A new set of lines of a high-voltage of 500 kilovolts and medium-voltage of 275 kV needs to be developed as a backbone network across the island, i.e. providing long-distance, reliable and stable transmission.
The distribution system and transformer capacity also need to be expanded to service a larger coverage of costumers and demand centers.
We are required also to develop an interconnected transmission system, as existing electricity transmission is not compatible across regions due to different systems and manufacturer standards adopted in the past.
The current initiative of developing inter-island interconnection lines between Java and Sumatra with 500kV High Voltage Direct Current (HVDC) lines needs to be completed in harmony with the mine-mouth development.
These long-distance transmission and distribution lines, as well as interconnected systems are required to exist before a system of mine-mouth power plants is commissioned to ensure that electricity produced can be transmitted in a timely manner and with minimum cost.
Both the central and local governments must work hand-in-hand to endorse incentives to encourage the private sector — independent power producers (IPPs) — to develop mine-mouth power plants.
Incentives need to be designed to enhance the financial viability of IPPs’ mine-mouth power plant projects.
PLN as an off-taker of IPP plays a fundamental role as the “coal-by-wire” agent, and has to be ready to absorb all of the risks associated with the development and operation of the system, including the difficulties in land acquisition and intra-regional compatibility of transmission systems.
Sumatra with its huge resources of low-grade coal can secure its own electricity supply and, eventually, can be the source of low-cost electricity with its energy radiating not only to Java, but also to every corner of the country.
Source: The Jakarta Post
The writer is deputy for energy and mineral resources at the office of Coordinating Economic Minister.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Wednesday, 30 July 14
CAPES SEEMED TO BE STRANDED AT THE SAME LEVELS; PANAMAXES MANAGED TO SLIGHTLY REVIVE - INTERMODAL
COALspot.com: The Dry Bulk market took a breath this past week, as both Panamaxes and Supras started to see a small influx of activity, which was j ...
Tuesday, 29 July 14
TOTAL SELLS ITS SOUTH AFRICAN COAL MINING ASSETS TO EXXARO
Total has signed an agreement with Exxaro Resources Ltd for the sale of its 100% stake in Total Coal South Africa (TCSA), its coal-producing affili ...
Tuesday, 29 July 14
GENCO: DRY BULK SHIPPING VALUATIONS NO LONGER ANCHORED TO DISCOUNTED CASH FLOW METHOD - WEIL
KNOWLEDGE TO ELEVATE
Discounted cash flow analysis is a mainstay among the valuation methodologies used by restructuring professionals and bank ...
Tuesday, 29 July 14
SHIP OWNERS' DEMAND OF NEW VESSELS DENTED AS A RESULT OF LOWER FREIGHT RATES - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING NEWS
The sharp downward direction of dry bulk freight rates has had a negative impact on investors’ secondhand buying appetite that wait to see th ...
Monday, 28 July 14
Q3' 14, SUB-BIT FOB INDONESIA COAL SWAP GAINED $ 0.08 DAY ON DAY AND $ 0.68 WEEK ON WEEK
COALspot.com: Indonesian coal swaps for average Q3’ 2014 increased by just US$ 0.08 day on day and US$ 0.68 week on week. The swap was lost U ...
|
|
|
Showing 3571 to 3575 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Bukit Asam (Persero) Tbk - Indonesia
- Binh Thuan Hamico - Vietnam
- Georgia Ports Authority, United States
- Energy Link Ltd, New Zealand
- Directorate General of MIneral and Coal - Indonesia
- New Zealand Coal & Carbon
- Jorong Barutama Greston.PT - Indonesia
- Xindia Steels Limited - India
- VISA Power Limited - India
- Offshore Bulk Terminal Pte Ltd, Singapore
- Chettinad Cement Corporation Ltd - India
- Ministry of Finance - Indonesia
- Larsen & Toubro Limited - India
- IHS Mccloskey Coal Group - USA
- Power Finance Corporation Ltd., India
- Neyveli Lignite Corporation Ltd, - India
- Star Paper Mills Limited - India
- Global Business Power Corporation, Philippines
- PetroVietnam Power Coal Import and Supply Company
- Banpu Public Company Limited - Thailand
- Ceylon Electricity Board - Sri Lanka
- Indika Energy - Indonesia
- Formosa Plastics Group - Taiwan
- Sojitz Corporation - Japan
- SN Aboitiz Power Inc, Philippines
- Samtan Co., Ltd - South Korea
- Eastern Coal Council - USA
- Grasim Industreis Ltd - India
- Iligan Light & Power Inc, Philippines
- Globalindo Alam Lestari - Indonesia
- Vizag Seaport Private Limited - India
- Meralco Power Generation, Philippines
- Kobexindo Tractors - Indoneisa
- Simpson Spence & Young - Indonesia
- Siam City Cement PLC, Thailand
- Essar Steel Hazira Ltd - India
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Energy Development Corp, Philippines
- Petron Corporation, Philippines
- GAC Shipping (India) Pvt Ltd
- Agrawal Coal Company - India
- Ind-Barath Power Infra Limited - India
- Goldman Sachs - Singapore
- Ministry of Mines - Canada
- Jindal Steel & Power Ltd - India
- Semirara Mining Corp, Philippines
- Pipit Mutiara Jaya. PT, Indonesia
- Bhatia International Limited - India
- Gujarat Mineral Development Corp Ltd - India
- Commonwealth Bank - Australia
- Posco Energy - South Korea
- Aboitiz Power Corporation - Philippines
- Kapuas Tunggal Persada - Indonesia
- Mercuria Energy - Indonesia
- Coastal Gujarat Power Limited - India
- Kumho Petrochemical, South Korea
- Antam Resourcindo - Indonesia
- OPG Power Generation Pvt Ltd - India
- Chamber of Mines of South Africa
- Price Waterhouse Coopers - Russia
- Interocean Group of Companies - India
- Wilmar Investment Holdings
- Makarim & Taira - Indonesia
- Indian Energy Exchange, India
- Electricity Generating Authority of Thailand
- Kepco SPC Power Corporation, Philippines
- Bangladesh Power Developement Board
- Parry Sugars Refinery, India
- Indogreen Group - Indonesia
- Indonesian Coal Mining Association
- Wood Mackenzie - Singapore
- ASAPP Information Group - India
- Asia Pacific Energy Resources Ventures Inc, Philippines
- McConnell Dowell - Australia
- Bank of Tokyo Mitsubishi UFJ Ltd
- Mjunction Services Limited - India
- Bahari Cakrawala Sebuku - Indonesia
- Australian Coal Association
- Carbofer General Trading SA - India
- Alfred C Toepfer International GmbH - Germany
- The Treasury - Australian Government
- Tata Chemicals Ltd - India
- Timah Investasi Mineral - Indoneisa
- GMR Energy Limited - India
- Deloitte Consulting - India
- Metalloyd Limited - United Kingdom
- Sree Jayajothi Cements Limited - India
- Salva Resources Pvt Ltd - India
- Leighton Contractors Pty Ltd - Australia
- The University of Queensland
- Directorate Of Revenue Intelligence - India
- Parliament of New Zealand
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Singapore Mercantile Exchange
- MS Steel International - UAE
- Kaltim Prima Coal - Indonesia
- Kideco Jaya Agung - Indonesia
- Global Green Power PLC Corporation, Philippines
- Sakthi Sugars Limited - India
- Coalindo Energy - Indonesia
- Manunggal Multi Energi - Indonesia
- Electricity Authority, New Zealand
- Marubeni Corporation - India
- PTC India Limited - India
- Mercator Lines Limited - India
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Bayan Resources Tbk. - Indonesia
- Australian Commodity Traders Exchange
- GN Power Mariveles Coal Plant, Philippines
- Bhoruka Overseas - Indonesia
- Lanco Infratech Ltd - India
- Petrochimia International Co. Ltd.- Taiwan
- IEA Clean Coal Centre - UK
- Karbindo Abesyapradhi - Indoneisa
- Vedanta Resources Plc - India
- Holcim Trading Pte Ltd - Singapore
- Edison Trading Spa - Italy
- GVK Power & Infra Limited - India
- Coal and Oil Company - UAE
- Gujarat Sidhee Cement - India
- Renaissance Capital - South Africa
- Savvy Resources Ltd - HongKong
- Barasentosa Lestari - Indonesia
- Planning Commission, India
- The State Trading Corporation of India Ltd
- European Bulk Services B.V. - Netherlands
- Jaiprakash Power Ventures ltd
- Borneo Indobara - Indonesia
- Uttam Galva Steels Limited - India
- AsiaOL BioFuels Corp., Philippines
- SMC Global Power, Philippines
- Baramulti Group, Indonesia
- Eastern Energy - Thailand
- Kalimantan Lumbung Energi - Indonesia
- Altura Mining Limited, Indonesia
- Romanian Commodities Exchange
- Sical Logistics Limited - India
- ICICI Bank Limited - India
- Billiton Holdings Pty Ltd - Australia
- Malabar Cements Ltd - India
- Siam City Cement - Thailand
- Independent Power Producers Association of India
- Vijayanagar Sugar Pvt Ltd - India
- Tamil Nadu electricity Board
- TNB Fuel Sdn Bhd - Malaysia
- India Bulls Power Limited - India
- Minerals Council of Australia
- Intertek Mineral Services - Indonesia
- Trasteel International SA, Italy
- Merrill Lynch Commodities Europe
- Medco Energi Mining Internasional
- Pendopo Energi Batubara - Indonesia
- Economic Council, Georgia
- Straits Asia Resources Limited - Singapore
- Dalmia Cement Bharat India
- Videocon Industries ltd - India
- Heidelberg Cement - Germany
- PowerSource Philippines DevCo
- Madhucon Powers Ltd - India
- CNBM International Corporation - China
- White Energy Company Limited
- Miang Besar Coal Terminal - Indonesia
- PNOC Exploration Corporation - Philippines
- Maharashtra Electricity Regulatory Commission - India
- Indo Tambangraya Megah - Indonesia
- South Luzon Thermal Energy Corporation
- Cement Manufacturers Association - India
- Bhushan Steel Limited - India
- Oldendorff Carriers - Singapore
- Sarangani Energy Corporation, Philippines
- Therma Luzon, Inc, Philippines
- San Jose City I Power Corp, Philippines
- Orica Australia Pty. Ltd.
- Gujarat Electricity Regulatory Commission - India
- Sindya Power Generating Company Private Ltd
- Bukit Baiduri Energy - Indonesia
- Sinarmas Energy and Mining - Indonesia
- Bukit Makmur.PT - Indonesia
- CIMB Investment Bank - Malaysia
- Meenaskhi Energy Private Limited - India
- Karaikal Port Pvt Ltd - India
- Bharathi Cement Corporation - India
- Maheswari Brothers Coal Limited - India
- Mintek Dendrill Indonesia
- Asmin Koalindo Tuhup - Indonesia
- Central Electricity Authority - India
- Semirara Mining and Power Corporation, Philippines
- Krishnapatnam Port Company Ltd. - India
- Port Waratah Coal Services - Australia
- Aditya Birla Group - India
- Thai Mozambique Logistica
- Anglo American - United Kingdom
- Standard Chartered Bank - UAE
- Riau Bara Harum - Indonesia
- Latin American Coal - Colombia
- LBH Netherlands Bv - Netherlands
- Kartika Selabumi Mining - Indonesia
- SMG Consultants - Indonesia
- Central Java Power - Indonesia
- TeaM Sual Corporation - Philippines
- Rio Tinto Coal - Australia
- Bulk Trading Sa - Switzerland
- Global Coal Blending Company Limited - Australia
- Toyota Tsusho Corporation, Japan
- Rashtriya Ispat Nigam Limited - India
- Ambuja Cements Ltd - India
- Orica Mining Services - Indonesia
- Africa Commodities Group - South Africa
- Ministry of Transport, Egypt
- Kohat Cement Company Ltd. - Pakistan
- International Coal Ventures Pvt Ltd - India
- Indian Oil Corporation Limited
- Cigading International Bulk Terminal - Indonesia
- Thiess Contractors Indonesia
- Attock Cement Pakistan Limited
- London Commodity Brokers - England
|
| |
| |
|