CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Saturday, 26 November 11
THE FREIGHT MARKETS EXPECTED TO BE STEADY NEXT WEEK - VISTAAR
COALspot.com - The market were down probably with the sentiments of global financial markets and all segments were down. The BDI was up down by 4 ...


Friday, 25 November 11
DISPUTE BETWEEN GIANT MINING FIRMS ENDS IN LAHAT - THE JAKARTA POST
The Jakarta Post reported that, prolonged dispute taking place in the South Sumatra regency of Lahat and involving two giant mining companies PT Buk ...


Friday, 25 November 11
DRY BULK MARKET LOSING STEAM, FAST - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
It’s been a week of falls for the dry bulk market this one, leaving ship owners with a sour taste in their mouths, as evidence of a recovery i ...


Thursday, 24 November 11
INDONESIA/INDIA SPMX TC AROUND $ 7/8K AND AROUND $ 12/13.00 PMTS ON VOYAGE BASIS - FEARNLEYS
Handy Last week ended on a positive note in the Atlantic however the activity levels are somewhat reduced.  Owners are asking in excess of USD ...


Thursday, 24 November 11
DRY BULK MARKET KEEPS LOSING STEAM - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The dry bulk market was lower once again on Wednesday, with the industry’s benchmark, the Baltic Dry Index (BDI) ending the session down by 1. ...


   991 992 993 994 995   
Showing 4961 to 4965 news of total 6871
News by Category
Popular News
 
Total Members : 28,622
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • IHS Mccloskey Coal Group - USA
  • Price Waterhouse Coopers - Russia
  • Independent Power Producers Association of India
  • Mercuria Energy - Indonesia
  • Essar Steel Hazira Ltd - India
  • ING Bank NV - Singapore
  • Kideco Jaya Agung - Indonesia
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Xindia Steels Limited - India
  • MEC Coal - Indonesia
  • Sinarmas Energy and Mining - Indonesia
  • Sical Logistics Limited - India
  • AsiaOL BioFuels Corp., Philippines
  • Krishnapatnam Port Company Ltd. - India
  • Baramulti Group, Indonesia
  • SRK Consulting
  • GNFC Limited - India
  • Indian School of Mines
  • Barclays Capital - USA
  • Savvy Resources Ltd - HongKong
  • Arch Coal - USA
  • Parry Sugars Refinery, India
  • Malco - India
  • Thomson Reuters GRC
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • SMG Consultants - Indonesia
  • Ceylon Electricity Board - Sri Lanka
  • Pinang Coal Indonesia
  • Petrosea - Indonesia
  • SMC Global Power, Philippines
  • NALCO India
  • Eastern Coal Council - USA
  • Indogreen Group - Indonesia
  • Ind-Barath Power Infra Limited - India
  • Platou - Singapore
  • RBS Sempra - UK
  • Kartika Selabumi Mining - Indonesia
  • Peabody Energy - USA
  • GAC Shipping (India) Pvt Ltd
  • Petrochimia International Co. Ltd.- Taiwan
  • Medco Energi Mining Internasional
  • Minerals Council of Australia
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Coeclerici Indonesia
  • Panama Canal Authority
  • Goldman Sachs - Singapore
  • Total Coal South Africa
  • Bharathi Cement Corporation - India
  • Alfred C Toepfer International GmbH - Germany
  • Gupta Coal India Ltd
  • Vizag Seaport Private Limited - India
  • PLN Batubara - Indonesia
  • Vijayanagar Sugar Pvt Ltd - India
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Iligan Light & Power Inc, Philippines
  • Mitsubishi Corporation
  • Bukit Asam (Persero) Tbk - Indonesia
  • Formosa Plastics Group - Taiwan
  • Credit Suisse - India
  • Indian Oil Corporation Limited
  • Anglo American - United Kingdom
  • Meralco Power Generation, Philippines
  • TANGEDCO India
  • Deutsche Bank - India
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Standard Chartered Bank - UAE
  • Platts
  • Bank of China, Malaysia
  • Attock Cement Pakistan Limited
  • Miang Besar Coal Terminal - Indonesia
  • Fearnleys - India
  • London Commodity Brokers - England
  • Cardiff University - UK
  • Parliament of New Zealand
  • Tanito Harum - Indonesia
  • Coal and Oil Company - UAE
  • Coaltrans Conferences
  • Timah Investasi Mineral - Indoneisa
  • Heidelberg Cement - Germany
  • BNP Paribas - Singapore
  • Neyveli Lignite Corporation Ltd, - India
  • TNPL - India
  • Marubeni Corporation - India
  • Semirara Mining and Power Corporation, Philippines
  • Kobexindo Tractors - Indoneisa
  • CIMB Investment Bank - Malaysia
  • Global Business Power Corporation, Philippines
  • Enel Italy
  • Humpuss - Indonesia
  • IMC Shipping - Singapore
  • The Treasury - Australian Government
  • Sree Jayajothi Cements Limited - India
  • Larsen & Toubro Limited - India
  • Infraline Energy - India
  • Indonesian Coal Mining Association
  • Altura Mining Limited, Indonesia
  • Japan Coal Energy Center
  • Renaissance Capital - South Africa
  • Sarangani Energy Corporation, Philippines
  • Latin American Coal - Colombia
  • Jindal Steel & Power Ltd - India
  • GN Power Mariveles Coal Plant, Philippines
  • Kobe Steel Ltd - Japan
  • JPower - Japan
  • Globalindo Alam Lestari - Indonesia
  • HSBC - Hong Kong
  • WorleyParsons
  • Siam City Cement PLC, Thailand
  • Ministry of Finance - Indonesia
  • EMO - The Netherlands
  • Indika Energy - Indonesia
  • PNOC Exploration Corporation - Philippines
  • Mitsui
  • TeaM Sual Corporation - Philippines
  • Petron Corporation, Philippines
  • Posco Energy - South Korea
  • SUEK AG - Indonesia
  • IBC Asia (S) Pte Ltd
  • Straits Asia Resources Limited - Singapore
  • Orica Mining Services - Indonesia
  • Makarim & Taira - Indonesia
  • Barasentosa Lestari - Indonesia
  • Gujarat Electricity Regulatory Commission - India
  • Freeport Indonesia
  • Idemitsu - Japan
  • Coastal Gujarat Power Limited - India
  • Bank of America
  • Antam Resourcindo - Indonesia
  • Argus Media - Singapore
  • Interocean Group of Companies - India
  • Surastha Cement
  • Semirara Mining Corp, Philippines
  • SGS (Thailand) Limited
  • IOL Indonesia
  • Ministry of Mines - Canada
  • Aditya Birla Group - India
  • Electricity Generating Authority of Thailand
  • VISA Power Limited - India
  • Intertek Mineral Services - Indonesia
  • Energy Development Corp, Philippines
  • Metalloyd Limited - United Kingdom
  • Bhushan Steel Limited - India
  • Star Paper Mills Limited - India
  • Power Finance Corporation Ltd., India
  • GMR Energy Limited - India
  • Cosco
  • Rio Tinto Coal - Australia
  • Rashtriya Ispat Nigam Limited - India
  • Inco-Indonesia
  • Noble Europe Ltd - UK
  • Bukit Makmur.PT - Indonesia
  • Coal India Limited
  • Gujarat Sidhee Cement - India
  • U S Energy Resources
  • KPMG - USA
  • Central Electricity Authority - India
  • Dalmia Cement Bharat India
  • Leighton Contractors Pty Ltd - Australia
  • Ernst & Young Pvt. Ltd.
  • Meenaskhi Energy Private Limited - India
  • Australian Commodity Traders Exchange
  • Energy Link Ltd, New Zealand
  • GVK Power & Infra Limited - India
  • Britmindo - Indonesia
  • DBS Bank - Singapore
  • Rudhra Energy - India
  • ASAPP Information Group - India
  • MS Steel International - UAE
  • Cement Manufacturers Association - India
  • Clarksons - UK
  • South Luzon Thermal Energy Corporation
  • Samtan Co., Ltd - South Korea
  • Sucofindo - Indonesia
  • Xstrata Coal
  • Bukit Baiduri Energy - Indonesia
  • Ince & co LLP
  • ETA - Dubai
  • Maruti Cements - India
  • Geoservices-GeoAssay Lab
  • Mjunction Services Limited - India
  • Pipit Mutiara Jaya. PT, Indonesia
  • International Coal Ventures Pvt Ltd - India
  • Grasim Industreis Ltd - India
  • India Bulls Power Limited - India
  • Reliance Power - India
  • McKinsey & Co - India
  • Coalindo Energy - Indonesia
  • Mercator Lines Limited - India
  • Sojitz Corporation - Japan
  • Tamil Nadu electricity Board
  • Permata Bank - Indonesia
  • CNBM International Corporation - China
  • Global Green Power PLC Corporation, Philippines
  • Sakthi Sugars Limited - India
  • TGV SRAAC LIMITED, India
  • Shree Cement - India
  • SN Aboitiz Power Inc, Philippines
  • Siam City Cement - Thailand
  • UOB Asia (HK) Ltd
  • Maharashtra Electricity Regulatory Commission - India
  • Cebu Energy, Philippines
  • Manunggal Multi Energi - Indonesia
  • Videocon Industries ltd - India
  • Kalimantan Lumbung Energi - Indonesia
  • Thermax Limited - India
  • Salva Resources Pvt Ltd - India
  • Mechel - Russia
  • Jatenergy - Australia
  • PLN - Indonesia
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Qatrana Cement - Jordan
  • Bahari Cakrawala Sebuku - Indonesia
  • The State Trading Corporation of India Ltd
  • Ambuja Cements Ltd - India
  • Bangkok Bank PCL
  • Chamber of Mines of South Africa
  • Indian Energy Exchange, India
  • Toyota Tsusho Corporation, Japan
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • World Coal - UK
  • Directorate General of MIneral and Coal - Indonesia
  • OCBC - Singapore
  • Malabar Cements Ltd - India
  • Banpu Public Company Limited - Thailand
  • Central Java Power - Indonesia
  • Shenhua Group - China
  • Arutmin Indonesia
  • Kepco SPC Power Corporation, Philippines
  • Coal Orbis AG
  • GB Group - China
  • LBH Netherlands Bv - Netherlands
  • Economic Council, Georgia
  • PetroVietnam Power Coal Import and Supply Company
  • Maersk Broker
  • Thai Mozambique Logistica
  • PowerSource Philippines DevCo
  • Simpson Spence & Young - Indonesia
  • Maheswari Brothers Coal Limited - India
  • Merrill Lynch Commodities Europe
  • Cargill India Pvt Ltd
  • Russian Coal LLC
  • Commonwealth Bank - Australia
  • Bhatia International Limited - India
  • Maybank - Singapore
  • Thriveni
  • globalCOAL - UK
  • J M Baxi & Co - India
  • Berau Coal - Indonesia
  • Mitra SK Pvt Ltd - India
  • KPCL - India
  • IEA Clean Coal Centre - UK
  • World Bank
  • San Jose City I Power Corp, Philippines
  • Billiton Holdings Pty Ltd - Australia
  • Binh Thuan Hamico - Vietnam
  • Edison Trading Spa - Italy
  • Orica Australia Pty. Ltd.
  • McConnell Dowell - Australia
  • Agrawal Coal Company - India
  • Ministry of Transport, Egypt
  • EIA - United States
  • CCIC - Indonesia
  • White Energy Company Limited
  • PTC India Limited - India
  • Tata Chemicals Ltd - India
  • Directorate Of Revenue Intelligence - India
  • Therma Luzon, Inc, Philippines
  • Holcim Trading Pte Ltd - Singapore
  • Cemex - Philippines
  • Pendopo Energi Batubara - Indonesia
  • Oldendorff Carriers - Singapore
  • bp singapore
  • Bayan Resources Tbk. - Indonesia
  • Kohat Cement Company Ltd. - Pakistan
  • TRAFIGURA, South Korea
  • Chettinad Cement Corporation Ltd - India
  • Aboitiz Power Corporation - Philippines
  • SASOL - South Africa
  • New Zealand Coal & Carbon
  • BRS Brokers - Singapore
  • Adani Power Ltd - India
  • NTPC Limited - India
  • Trasteel International SA, Italy
  • KEPCO - South Korea
  • OPG Power Generation Pvt Ltd - India
  • Karbindo Abesyapradhi - Indoneisa
  • Vedanta Resources Plc - India
  • Glencore India Pvt. Ltd
  • Uttam Galva Steels Limited - India
  • Port Waratah Coal Services - Australia
  • Wilmar Investment Holdings
  • Merrill Lynch Bank
  • UBS Singapore
  • Asmin Koalindo Tuhup - Indonesia
  • Moodys - Singapore
  • Singapore Mercantile Exchange
  • Samsung - South Korea
  • Asia Cement - Taiwan
  • Jorong Barutama Greston.PT - Indonesia
  • Riau Bara Harum - Indonesia
  • Indo Tambangraya Megah - Indonesia
  • APGENCO India
  • ANZ Bank - Australia
  • Carbofer General Trading SA - India
  • European Bulk Services B.V. - Netherlands
  • Bulk Trading Sa - Switzerland
  • CoalTek, United States
  • ICICI Bank Limited - India
  • Lanco Infratech Ltd - India
  • GHCL Limited - India
  • Bhoruka Overseas - Indonesia
  • Borneo Indobara - Indonesia
  • The India Cements Ltd
  • Core Mineral Indonesia
  • Madhucon Powers Ltd - India
  • Cigading International Bulk Terminal - Indonesia
  • Deloitte Consulting - India
  • Planning Commission, India
  • Romanian Commodities Exchange
  • Kaltim Prima Coal - Indonesia
  • CESC Limited - India
  • Karaikal Port Pvt Ltd - India
  • Bangladesh Power Developement Board
  • Australian Coal Association
  • Adaro Indonesia
  • Vale Mozambique
  • Kapuas Tunggal Persada - Indonesia
  • Thailand Anthracite
  • JPMorgan - India
  • Africa Commodities Group - South Africa
  • Indonesia Power. PT
  • Georgia Ports Authority, United States
  • Inspectorate - India
  • TNB Fuel Sdn Bhd - Malaysia
  • ACC Limited - India
  • Gujarat Mineral Development Corp Ltd - India
  • Runge Indonesia
  • KOWEPO - South Korea
  • The University of Queensland
  • Tata Power - India
  • Vitol - Bahrain
  • Jaiprakash Power Ventures ltd
  • Asian Development Bank
  • Gresik Semen - Indonesia
  • Thiess Contractors Indonesia
  • PetroVietnam
  • Electricity Authority, New Zealand
  • Eastern Energy - Thailand
  • Indorama - Singapore
  • Wood Mackenzie - Singapore
  • Sindya Power Generating Company Private Ltd
  • Global Coal Blending Company Limited - Australia
  • Lafarge - France
  • Mintek Dendrill Indonesia
  • Kumho Petrochemical, South Korea