CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Saturday, 18 March 23
HEDGE TO OFFSET LNG VOLATILITY, TRADERS TOLD - BALTIC EXCHANGE
A shift in imports from Asia to Europe led to significant volatility in liquefied natural gas shipping last year, prompting industry experts to urg ...
Friday, 17 March 23
INDONESIAN COAL PRICE REFERENCE UP AROUND 2.17% IN MARCH 2023
COALspot.com: Indonesian Coal Price Reference up around 2.17% in March 2023.
According to the new HBA regulation No. 41.K/MB.0 ...
Saturday, 11 March 23
MARKET INSIGHT - INTERMODAL
Uncertainty over the recovery of Chinese demand, demand destruction in Europe, as well as weather conditions will pivot the LNG market this summer. ...
Wednesday, 08 March 23
INDONESIAN COAL REFERENCE PRICE FORMULA HAS OFFICIALLY CHANGED
Indonesian Minister of Energy and Mineral Resources has officially changed the guideline for determining the benchmark price for the sale of coal c ...
Thursday, 02 March 23
INDIA'S SEABORNE CRUDE OIL IMPORTS IN 2022 INCREASED BY 11.5% YOY - BANCHERO COSTA
2022 has turned out to be a very positive year for crude oil trade, despite the surging oil prices and risks of economic recession, Banchero Costa ...
|
|
|
Showing 126 to 130 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Binh Thuan Hamico - Vietnam
- Antam Resourcindo - Indonesia
- Minerals Council of Australia
- Timah Investasi Mineral - Indoneisa
- Bukit Baiduri Energy - Indonesia
- Edison Trading Spa - Italy
- Gujarat Electricity Regulatory Commission - India
- Agrawal Coal Company - India
- Indo Tambangraya Megah - Indonesia
- Karbindo Abesyapradhi - Indoneisa
- Manunggal Multi Energi - Indonesia
- Sarangani Energy Corporation, Philippines
- Samtan Co., Ltd - South Korea
- Krishnapatnam Port Company Ltd. - India
- Jaiprakash Power Ventures ltd
- South Luzon Thermal Energy Corporation
- Coastal Gujarat Power Limited - India
- Kalimantan Lumbung Energi - Indonesia
- Essar Steel Hazira Ltd - India
- Leighton Contractors Pty Ltd - Australia
- Orica Mining Services - Indonesia
- CNBM International Corporation - China
- Port Waratah Coal Services - Australia
- SMC Global Power, Philippines
- Billiton Holdings Pty Ltd - Australia
- Xindia Steels Limited - India
- Attock Cement Pakistan Limited
- AsiaOL BioFuels Corp., Philippines
- Ind-Barath Power Infra Limited - India
- IHS Mccloskey Coal Group - USA
- Iligan Light & Power Inc, Philippines
- London Commodity Brokers - England
- Grasim Industreis Ltd - India
- Therma Luzon, Inc, Philippines
- CIMB Investment Bank - Malaysia
- Vedanta Resources Plc - India
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Sinarmas Energy and Mining - Indonesia
- Toyota Tsusho Corporation, Japan
- Meenaskhi Energy Private Limited - India
- Kepco SPC Power Corporation, Philippines
- Siam City Cement PLC, Thailand
- India Bulls Power Limited - India
- Tata Chemicals Ltd - India
- New Zealand Coal & Carbon
- Holcim Trading Pte Ltd - Singapore
- Sakthi Sugars Limited - India
- Metalloyd Limited - United Kingdom
- International Coal Ventures Pvt Ltd - India
- Petron Corporation, Philippines
- Pipit Mutiara Jaya. PT, Indonesia
- Georgia Ports Authority, United States
- Kobexindo Tractors - Indoneisa
- Meralco Power Generation, Philippines
- Planning Commission, India
- Mercator Lines Limited - India
- Kaltim Prima Coal - Indonesia
- Borneo Indobara - Indonesia
- Trasteel International SA, Italy
- Latin American Coal - Colombia
- Formosa Plastics Group - Taiwan
- Chamber of Mines of South Africa
- PowerSource Philippines DevCo
- Economic Council, Georgia
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Africa Commodities Group - South Africa
- Chettinad Cement Corporation Ltd - India
- Indogreen Group - Indonesia
- Singapore Mercantile Exchange
- Independent Power Producers Association of India
- White Energy Company Limited
- Semirara Mining and Power Corporation, Philippines
- Sindya Power Generating Company Private Ltd
- Ceylon Electricity Board - Sri Lanka
- GMR Energy Limited - India
- Pendopo Energi Batubara - Indonesia
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Maheswari Brothers Coal Limited - India
- Carbofer General Trading SA - India
- Kideco Jaya Agung - Indonesia
- Gujarat Sidhee Cement - India
- Mintek Dendrill Indonesia
- Offshore Bulk Terminal Pte Ltd, Singapore
- Ambuja Cements Ltd - India
- Anglo American - United Kingdom
- Bharathi Cement Corporation - India
- Interocean Group of Companies - India
- Alfred C Toepfer International GmbH - Germany
- Thiess Contractors Indonesia
- Banpu Public Company Limited - Thailand
- Oldendorff Carriers - Singapore
- Salva Resources Pvt Ltd - India
- Cigading International Bulk Terminal - Indonesia
- Thai Mozambique Logistica
- Semirara Mining Corp, Philippines
- Straits Asia Resources Limited - Singapore
- Aboitiz Power Corporation - Philippines
- Riau Bara Harum - Indonesia
- Central Electricity Authority - India
- The Treasury - Australian Government
- Australian Commodity Traders Exchange
- Simpson Spence & Young - Indonesia
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- GN Power Mariveles Coal Plant, Philippines
- San Jose City I Power Corp, Philippines
- Asia Pacific Energy Resources Ventures Inc, Philippines
- PetroVietnam Power Coal Import and Supply Company
- Bulk Trading Sa - Switzerland
- Sojitz Corporation - Japan
- Renaissance Capital - South Africa
- Standard Chartered Bank - UAE
- Dalmia Cement Bharat India
- Indika Energy - Indonesia
- Karaikal Port Pvt Ltd - India
- Cement Manufacturers Association - India
- Wilmar Investment Holdings
- Bhatia International Limited - India
- VISA Power Limited - India
- Kumho Petrochemical, South Korea
- Jorong Barutama Greston.PT - Indonesia
- OPG Power Generation Pvt Ltd - India
- Baramulti Group, Indonesia
- TeaM Sual Corporation - Philippines
- Parliament of New Zealand
- PNOC Exploration Corporation - Philippines
- Global Business Power Corporation, Philippines
- Goldman Sachs - Singapore
- Makarim & Taira - Indonesia
- Larsen & Toubro Limited - India
- Rashtriya Ispat Nigam Limited - India
- Wood Mackenzie - Singapore
- Australian Coal Association
- Bhushan Steel Limited - India
- Savvy Resources Ltd - HongKong
- The University of Queensland
- Deloitte Consulting - India
- Videocon Industries ltd - India
- PTC India Limited - India
- Orica Australia Pty. Ltd.
- The State Trading Corporation of India Ltd
- Electricity Authority, New Zealand
- Posco Energy - South Korea
- Vijayanagar Sugar Pvt Ltd - India
- Global Coal Blending Company Limited - Australia
- Eastern Energy - Thailand
- Parry Sugars Refinery, India
- Bhoruka Overseas - Indonesia
- Commonwealth Bank - Australia
- Ministry of Mines - Canada
- Indian Energy Exchange, India
- Rio Tinto Coal - Australia
- Kartika Selabumi Mining - Indonesia
- Directorate General of MIneral and Coal - Indonesia
- Asmin Koalindo Tuhup - Indonesia
- Mercuria Energy - Indonesia
- Tamil Nadu electricity Board
- McConnell Dowell - Australia
- Uttam Galva Steels Limited - India
- European Bulk Services B.V. - Netherlands
- Lanco Infratech Ltd - India
- Eastern Coal Council - USA
- Jindal Steel & Power Ltd - India
- Indonesian Coal Mining Association
- Energy Link Ltd, New Zealand
- Maharashtra Electricity Regulatory Commission - India
- Bangladesh Power Developement Board
- Romanian Commodities Exchange
- Bukit Makmur.PT - Indonesia
- Sical Logistics Limited - India
- Ministry of Transport, Egypt
- LBH Netherlands Bv - Netherlands
- Altura Mining Limited, Indonesia
- Aditya Birla Group - India
- Merrill Lynch Commodities Europe
- Price Waterhouse Coopers - Russia
- ICICI Bank Limited - India
- Central Java Power - Indonesia
- Siam City Cement - Thailand
- SN Aboitiz Power Inc, Philippines
- Medco Energi Mining Internasional
- Mjunction Services Limited - India
- Sree Jayajothi Cements Limited - India
- Energy Development Corp, Philippines
- Marubeni Corporation - India
- Heidelberg Cement - Germany
- Miang Besar Coal Terminal - Indonesia
- Electricity Generating Authority of Thailand
- Bank of Tokyo Mitsubishi UFJ Ltd
- ASAPP Information Group - India
- Kapuas Tunggal Persada - Indonesia
- Madhucon Powers Ltd - India
- Global Green Power PLC Corporation, Philippines
- Coalindo Energy - Indonesia
- Bukit Asam (Persero) Tbk - Indonesia
- Intertek Mineral Services - Indonesia
- Globalindo Alam Lestari - Indonesia
- GAC Shipping (India) Pvt Ltd
- Ministry of Finance - Indonesia
- Bayan Resources Tbk. - Indonesia
- Malabar Cements Ltd - India
- GVK Power & Infra Limited - India
- MS Steel International - UAE
- Indian Oil Corporation Limited
- Vizag Seaport Private Limited - India
- Coal and Oil Company - UAE
- Power Finance Corporation Ltd., India
- Kohat Cement Company Ltd. - Pakistan
- Gujarat Mineral Development Corp Ltd - India
- Directorate Of Revenue Intelligence - India
- Bahari Cakrawala Sebuku - Indonesia
- SMG Consultants - Indonesia
- Neyveli Lignite Corporation Ltd, - India
- Star Paper Mills Limited - India
- Petrochimia International Co. Ltd.- Taiwan
- TNB Fuel Sdn Bhd - Malaysia
- IEA Clean Coal Centre - UK
- Barasentosa Lestari - Indonesia
|
| |
| |
|