CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Tuesday, 12 July 11
DRY BULK MARKET BEGINS WEEK ON RETREAT MODE - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
As was evident by the end of the previous week, the dry bulk market’s growth momentum was about to lose steam, something proven yesterday, whe ...


Monday, 11 July 11
REFLECTIONS ON THE FLEET REACHING ONE BILLION TONNES - CLARKSONS / HELLENIC SHIPPING
“A billion gross tonnes of shipping” has a nice ring to it. It presents the industry as a business of substance, with its 85,000 ships w ...


Sunday, 10 July 11
UNTR PROVIDES US$100 MIO TO TTA - INSIDER STORIES
PT United Tractors Tbk (UNTR) agreed to allocate US$100 million to its coal subsidiary dubbed PT Tuah Turangga Agung (TTA).The US$100 million was pa ...


Sunday, 10 July 11
HARDLY ANY CARGO FROM WC INDIA UNTIL END OF MONSOONS - VISTAAR
COALspot.com - The BDI continued to hold last week and firmed up by 27 points with cape and panama index supporting the BDI. The BDI closed at 1, ...


Sunday, 10 July 11
PTBA INCREASES SHARES IN COAL TRAIN PROJECT - TEMPO INTERACTIVE
TEMPO Interactive reported that, PT Tambang Batubara Bukit Asam (PTBA) is still studying the plan to buy 20 percent of shares in the PT Bukit Asam T ...


   1038 1039 1040 1041 1042   
Showing 5196 to 5200 news of total 6871
News by Category
Popular News
 
Total Members : 28,622
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Simpson Spence & Young - Indonesia
  • Meralco Power Generation, Philippines
  • bp singapore
  • GB Group - China
  • SMC Global Power, Philippines
  • Ministry of Transport, Egypt
  • Mechel - Russia
  • Ernst & Young Pvt. Ltd.
  • Platts
  • Bayan Resources Tbk. - Indonesia
  • Planning Commission, India
  • Toyota Tsusho Corporation, Japan
  • Ceylon Electricity Board - Sri Lanka
  • Bhatia International Limited - India
  • Maersk Broker
  • Qatrana Cement - Jordan
  • New Zealand Coal & Carbon
  • Bhushan Steel Limited - India
  • Intertek Mineral Services - Indonesia
  • Baramulti Group, Indonesia
  • Essar Steel Hazira Ltd - India
  • UBS Singapore
  • GNFC Limited - India
  • Chettinad Cement Corporation Ltd - India
  • Neyveli Lignite Corporation Ltd, - India
  • Posco Energy - South Korea
  • Tata Power - India
  • KPCL - India
  • Africa Commodities Group - South Africa
  • The University of Queensland
  • McKinsey & Co - India
  • Rio Tinto Coal - Australia
  • ACC Limited - India
  • Barasentosa Lestari - Indonesia
  • Global Green Power PLC Corporation, Philippines
  • Asian Development Bank
  • Madhucon Powers Ltd - India
  • Straits Asia Resources Limited - Singapore
  • Latin American Coal - Colombia
  • Merrill Lynch Bank
  • The State Trading Corporation of India Ltd
  • Bukit Baiduri Energy - Indonesia
  • Bharathi Cement Corporation - India
  • Indonesia Power. PT
  • Thiess Contractors Indonesia
  • CoalTek, United States
  • Sucofindo - Indonesia
  • Glencore India Pvt. Ltd
  • Peabody Energy - USA
  • Mjunction Services Limited - India
  • Star Paper Mills Limited - India
  • Indian Energy Exchange, India
  • Sindya Power Generating Company Private Ltd
  • Bulk Trading Sa - Switzerland
  • Tata Chemicals Ltd - India
  • Meenaskhi Energy Private Limited - India
  • Coaltrans Conferences
  • CIMB Investment Bank - Malaysia
  • Noble Europe Ltd - UK
  • SMG Consultants - Indonesia
  • PTC India Limited - India
  • Ind-Barath Power Infra Limited - India
  • Pendopo Energi Batubara - Indonesia
  • ING Bank NV - Singapore
  • Freeport Indonesia
  • Semirara Mining Corp, Philippines
  • IBC Asia (S) Pte Ltd
  • The Treasury - Australian Government
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Aboitiz Power Corporation - Philippines
  • European Bulk Services B.V. - Netherlands
  • Grasim Industreis Ltd - India
  • Coal and Oil Company - UAE
  • International Coal Ventures Pvt Ltd - India
  • London Commodity Brokers - England
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Globalindo Alam Lestari - Indonesia
  • MEC Coal - Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • Electricity Generating Authority of Thailand
  • South Luzon Thermal Energy Corporation
  • ANZ Bank - Australia
  • Chamber of Mines of South Africa
  • Timah Investasi Mineral - Indoneisa
  • PetroVietnam Power Coal Import and Supply Company
  • EIA - United States
  • Gujarat Sidhee Cement - India
  • Fearnleys - India
  • Global Business Power Corporation, Philippines
  • Billiton Holdings Pty Ltd - Australia
  • Directorate General of MIneral and Coal - Indonesia
  • Coalindo Energy - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • Georgia Ports Authority, United States
  • SUEK AG - Indonesia
  • The India Cements Ltd
  • Ince & co LLP
  • ASAPP Information Group - India
  • Kohat Cement Company Ltd. - Pakistan
  • Attock Cement Pakistan Limited
  • ETA - Dubai
  • Coeclerici Indonesia
  • Sakthi Sugars Limited - India
  • Marubeni Corporation - India
  • UOB Asia (HK) Ltd
  • CCIC - Indonesia
  • Wilmar Investment Holdings
  • GAC Shipping (India) Pvt Ltd
  • Central Electricity Authority - India
  • Bangladesh Power Developement Board
  • White Energy Company Limited
  • Central Java Power - Indonesia
  • Maybank - Singapore
  • Miang Besar Coal Terminal - Indonesia
  • Mitra SK Pvt Ltd - India
  • World Bank
  • IEA Clean Coal Centre - UK
  • Asia Cement - Taiwan
  • Cargill India Pvt Ltd
  • Carbofer General Trading SA - India
  • TRAFIGURA, South Korea
  • Coal Orbis AG
  • Mitsubishi Corporation
  • Tamil Nadu electricity Board
  • Australian Commodity Traders Exchange
  • PetroVietnam
  • globalCOAL - UK
  • Permata Bank - Indonesia
  • SASOL - South Africa
  • RBS Sempra - UK
  • WorleyParsons
  • Panama Canal Authority
  • Platou - Singapore
  • Manunggal Multi Energi - Indonesia
  • Petrosea - Indonesia
  • Clarksons - UK
  • Adaro Indonesia
  • PowerSource Philippines DevCo
  • Kepco SPC Power Corporation, Philippines
  • Energy Development Corp, Philippines
  • Thriveni
  • Cebu Energy, Philippines
  • BRS Brokers - Singapore
  • TNPL - India
  • India Bulls Power Limited - India
  • Karbindo Abesyapradhi - Indoneisa
  • Orica Mining Services - Indonesia
  • San Jose City I Power Corp, Philippines
  • Core Mineral Indonesia
  • Eastern Coal Council - USA
  • HSBC - Hong Kong
  • ICICI Bank Limited - India
  • Pinang Coal Indonesia
  • TANGEDCO India
  • JPMorgan - India
  • Renaissance Capital - South Africa
  • APGENCO India
  • Commonwealth Bank - Australia
  • Petron Corporation, Philippines
  • Bukit Asam (Persero) Tbk - Indonesia
  • Cigading International Bulk Terminal - Indonesia
  • TeaM Sual Corporation - Philippines
  • Gupta Coal India Ltd
  • Vizag Seaport Private Limited - India
  • CNBM International Corporation - China
  • Goldman Sachs - Singapore
  • McConnell Dowell - Australia
  • Riau Bara Harum - Indonesia
  • Bank of America
  • Indian Oil Corporation Limited
  • World Coal - UK
  • Deloitte Consulting - India
  • Humpuss - Indonesia
  • Antam Resourcindo - Indonesia
  • Bangkok Bank PCL
  • Petrochimia International Co. Ltd.- Taiwan
  • Indogreen Group - Indonesia
  • Standard Chartered Bank - UAE
  • Bukit Makmur.PT - Indonesia
  • Energy Link Ltd, New Zealand
  • Xstrata Coal
  • Runge Indonesia
  • Iligan Light & Power Inc, Philippines
  • Borneo Indobara - Indonesia
  • Oldendorff Carriers - Singapore
  • Indika Energy - Indonesia
  • Argus Media - Singapore
  • Infraline Energy - India
  • Singapore Mercantile Exchange
  • Formosa Plastics Group - Taiwan
  • Power Finance Corporation Ltd., India
  • U S Energy Resources
  • Arch Coal - USA
  • AsiaOL BioFuels Corp., Philippines
  • Parry Sugars Refinery, India
  • Global Coal Blending Company Limited - Australia
  • Shree Cement - India
  • Anglo American - United Kingdom
  • JPower - Japan
  • Videocon Industries ltd - India
  • Mercator Lines Limited - India
  • Maheswari Brothers Coal Limited - India
  • Indonesian Coal Mining Association
  • DBS Bank - Singapore
  • Therma Luzon, Inc, Philippines
  • Gujarat Mineral Development Corp Ltd - India
  • Coal India Limited
  • Kartika Selabumi Mining - Indonesia
  • Merrill Lynch Commodities Europe
  • LBH Netherlands Bv - Netherlands
  • KOWEPO - South Korea
  • Kalimantan Lumbung Energi - Indonesia
  • Gresik Semen - Indonesia
  • Cosco
  • Indian School of Mines
  • Reliance Power - India
  • Surastha Cement
  • Kobexindo Tractors - Indoneisa
  • Parliament of New Zealand
  • Total Coal South Africa
  • CESC Limited - India
  • Pipit Mutiara Jaya. PT, Indonesia
  • Inco-Indonesia
  • Barclays Capital - USA
  • IOL Indonesia
  • Heidelberg Cement - Germany
  • Idemitsu - Japan
  • VISA Power Limited - India
  • TGV SRAAC LIMITED, India
  • Trasteel International SA, Italy
  • Mitsui
  • KPMG - USA
  • Medco Energi Mining Internasional
  • Samtan Co., Ltd - South Korea
  • IMC Shipping - Singapore
  • Indorama - Singapore
  • Thailand Anthracite
  • Jindal Steel & Power Ltd - India
  • GVK Power & Infra Limited - India
  • Xindia Steels Limited - India
  • Cemex - Philippines
  • KEPCO - South Korea
  • Vijayanagar Sugar Pvt Ltd - India
  • Asmin Koalindo Tuhup - Indonesia
  • Siam City Cement PLC, Thailand
  • NTPC Limited - India
  • Edison Trading Spa - Italy
  • MS Steel International - UAE
  • Indo Tambangraya Megah - Indonesia
  • Makarim & Taira - Indonesia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Mintek Dendrill Indonesia
  • Directorate Of Revenue Intelligence - India
  • Salva Resources Pvt Ltd - India
  • Arutmin Indonesia
  • Economic Council, Georgia
  • Adani Power Ltd - India
  • Vedanta Resources Plc - India
  • Sree Jayajothi Cements Limited - India
  • Maruti Cements - India
  • BNP Paribas - Singapore
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Malco - India
  • Electricity Authority, New Zealand
  • Orica Australia Pty. Ltd.
  • Cement Manufacturers Association - India
  • Enel Italy
  • Price Waterhouse Coopers - Russia
  • Britmindo - Indonesia
  • Lanco Infratech Ltd - India
  • Malabar Cements Ltd - India
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Dalmia Cement Bharat India
  • Binh Thuan Hamico - Vietnam
  • PLN - Indonesia
  • Deutsche Bank - India
  • GHCL Limited - India
  • Thermax Limited - India
  • Eastern Energy - Thailand
  • Sinarmas Energy and Mining - Indonesia
  • Sojitz Corporation - Japan
  • Vitol - Bahrain
  • Maharashtra Electricity Regulatory Commission - India
  • Inspectorate - India
  • Vale Mozambique
  • Banpu Public Company Limited - Thailand
  • Wood Mackenzie - Singapore
  • IHS Mccloskey Coal Group - USA
  • Shenhua Group - China
  • Kideco Jaya Agung - Indonesia
  • TNB Fuel Sdn Bhd - Malaysia
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Semirara Mining and Power Corporation, Philippines
  • Bhoruka Overseas - Indonesia
  • Altura Mining Limited, Indonesia
  • Berau Coal - Indonesia
  • Agrawal Coal Company - India
  • PNOC Exploration Corporation - Philippines
  • Karaikal Port Pvt Ltd - India
  • Russian Coal LLC
  • Mercuria Energy - Indonesia
  • Thai Mozambique Logistica
  • Port Waratah Coal Services - Australia
  • Aditya Birla Group - India
  • Cardiff University - UK
  • OPG Power Generation Pvt Ltd - India
  • Jatenergy - Australia
  • Ministry of Mines - Canada
  • Gujarat Electricity Regulatory Commission - India
  • Credit Suisse - India
  • Holcim Trading Pte Ltd - Singapore
  • Moodys - Singapore
  • EMO - The Netherlands
  • Ministry of Finance - Indonesia
  • GN Power Mariveles Coal Plant, Philippines
  • Japan Coal Energy Center
  • Thomson Reuters GRC
  • Jaiprakash Power Ventures ltd
  • OCBC - Singapore
  • Siam City Cement - Thailand
  • Kumho Petrochemical, South Korea
  • Jorong Barutama Greston.PT - Indonesia
  • Minerals Council of Australia
  • PLN Batubara - Indonesia
  • Kapuas Tunggal Persada - Indonesia
  • SGS (Thailand) Limited
  • Lafarge - France
  • SN Aboitiz Power Inc, Philippines
  • Kaltim Prima Coal - Indonesia
  • GMR Energy Limited - India
  • Romanian Commodities Exchange
  • Samsung - South Korea
  • Ambuja Cements Ltd - India
  • J M Baxi & Co - India
  • Sical Logistics Limited - India
  • Savvy Resources Ltd - HongKong
  • Interocean Group of Companies - India
  • Rudhra Energy - India
  • Bank of China, Malaysia
  • Sarangani Energy Corporation, Philippines
  • Australian Coal Association
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Independent Power Producers Association of India
  • Larsen & Toubro Limited - India
  • Krishnapatnam Port Company Ltd. - India
  • Tanito Harum - Indonesia
  • SRK Consulting
  • Bahari Cakrawala Sebuku - Indonesia
  • Geoservices-GeoAssay Lab
  • Coastal Gujarat Power Limited - India
  • Leighton Contractors Pty Ltd - Australia
  • NALCO India
  • Kobe Steel Ltd - Japan
  • Uttam Galva Steels Limited - India
  • Metalloyd Limited - United Kingdom