The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Friday, 29 July 11
5300 ADB COAL WILL BE AT US$ 60/TON IN THIS QUARTER - RAIN
COALspot.com - PT Resource Alam Indonesia Tbk (KKGI) seeing the average selling price of its coal for the third quarter of this year will increase t ...
Thursday, 28 July 11
PTBA'S COAL PRICES UP IN H1 2011
COALspot.com - Bukit Asam’s coal prices in the second half of 2011 will expected to be higher than the first half of this year, said Sukrisno, ...
Thursday, 28 July 11
RESOURCE ALAM 1H PROFIT SURGES 208 PERCENT
Indonesia's tenth largest coal miner in term of concessions, PT Resource Alam Indonesia (KKGI), part of Rain Group, today reported a skyrocket net ...
Thursday, 28 July 11
DRY BULK MARKET EDGES FURTHER DOWN ON ADDED PRESSURE - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The Baltic Dry Index (BDI), an indicator of dry bulk freight rates has reached new lows this week, with yesterday’s session ending further dow ...
Wednesday, 27 July 11
BLACKSTONE TO INVEST INR 5,000 MILLION (APPRX. US$ 111 MILLION) IN VISA POWER
Press Release - The Blackstone Group (NYSE: BX) today announced that it will be investing INR 5,000 million (c. USD 111 million) in VISA Power ...
|
|
|
Showing 5166 to 5170 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Anglo American - United Kingdom
- Bayan Resources Tbk. - Indonesia
- Sojitz Corporation - Japan
- Vijayanagar Sugar Pvt Ltd - India
- SMC Global Power, Philippines
- Petrochimia International Co. Ltd.- Taiwan
- Uttam Galva Steels Limited - India
- Ministry of Transport, Egypt
- Savvy Resources Ltd - HongKong
- Pipit Mutiara Jaya. PT, Indonesia
- Bahari Cakrawala Sebuku - Indonesia
- VISA Power Limited - India
- PowerSource Philippines DevCo
- Sakthi Sugars Limited - India
- Karbindo Abesyapradhi - Indoneisa
- Indian Energy Exchange, India
- Directorate General of MIneral and Coal - Indonesia
- Makarim & Taira - Indonesia
- Planning Commission, India
- PNOC Exploration Corporation - Philippines
- Africa Commodities Group - South Africa
- Cement Manufacturers Association - India
- Renaissance Capital - South Africa
- Star Paper Mills Limited - India
- Karaikal Port Pvt Ltd - India
- Indonesian Coal Mining Association
- Bhoruka Overseas - Indonesia
- Coalindo Energy - Indonesia
- Riau Bara Harum - Indonesia
- Merrill Lynch Commodities Europe
- Xindia Steels Limited - India
- Kapuas Tunggal Persada - Indonesia
- Parliament of New Zealand
- Alfred C Toepfer International GmbH - Germany
- Singapore Mercantile Exchange
- Billiton Holdings Pty Ltd - Australia
- Barasentosa Lestari - Indonesia
- The Treasury - Australian Government
- Madhucon Powers Ltd - India
- Kaltim Prima Coal - Indonesia
- Posco Energy - South Korea
- Mintek Dendrill Indonesia
- Independent Power Producers Association of India
- Essar Steel Hazira Ltd - India
- Pendopo Energi Batubara - Indonesia
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Videocon Industries ltd - India
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Simpson Spence & Young - Indonesia
- Commonwealth Bank - Australia
- Banpu Public Company Limited - Thailand
- Ceylon Electricity Board - Sri Lanka
- Krishnapatnam Port Company Ltd. - India
- Orica Australia Pty. Ltd.
- Indian Oil Corporation Limited
- Rio Tinto Coal - Australia
- Kumho Petrochemical, South Korea
- Carbofer General Trading SA - India
- Salva Resources Pvt Ltd - India
- Bhatia International Limited - India
- Marubeni Corporation - India
- Australian Commodity Traders Exchange
- White Energy Company Limited
- MS Steel International - UAE
- Indogreen Group - Indonesia
- Oldendorff Carriers - Singapore
- Leighton Contractors Pty Ltd - Australia
- Iligan Light & Power Inc, Philippines
- McConnell Dowell - Australia
- Larsen & Toubro Limited - India
- Deloitte Consulting - India
- Mercuria Energy - Indonesia
- Siam City Cement - Thailand
- TNB Fuel Sdn Bhd - Malaysia
- Ministry of Finance - Indonesia
- Sree Jayajothi Cements Limited - India
- Mjunction Services Limited - India
- Asmin Koalindo Tuhup - Indonesia
- PetroVietnam Power Coal Import and Supply Company
- Therma Luzon, Inc, Philippines
- Australian Coal Association
- Energy Development Corp, Philippines
- Edison Trading Spa - Italy
- India Bulls Power Limited - India
- Price Waterhouse Coopers - Russia
- Baramulti Group, Indonesia
- Rashtriya Ispat Nigam Limited - India
- Offshore Bulk Terminal Pte Ltd, Singapore
- South Luzon Thermal Energy Corporation
- SN Aboitiz Power Inc, Philippines
- Eastern Energy - Thailand
- Malabar Cements Ltd - India
- AsiaOL BioFuels Corp., Philippines
- Power Finance Corporation Ltd., India
- Miang Besar Coal Terminal - Indonesia
- Metalloyd Limited - United Kingdom
- OPG Power Generation Pvt Ltd - India
- Jindal Steel & Power Ltd - India
- PTC India Limited - India
- Sical Logistics Limited - India
- CNBM International Corporation - China
- GAC Shipping (India) Pvt Ltd
- Orica Mining Services - Indonesia
- Directorate Of Revenue Intelligence - India
- Meenaskhi Energy Private Limited - India
- Ambuja Cements Ltd - India
- Attock Cement Pakistan Limited
- Global Green Power PLC Corporation, Philippines
- Global Coal Blending Company Limited - Australia
- Bank of Tokyo Mitsubishi UFJ Ltd
- Goldman Sachs - Singapore
- Port Waratah Coal Services - Australia
- The State Trading Corporation of India Ltd
- Aditya Birla Group - India
- Chettinad Cement Corporation Ltd - India
- Kepco SPC Power Corporation, Philippines
- Electricity Authority, New Zealand
- Asia Pacific Energy Resources Ventures Inc, Philippines
- Latin American Coal - Colombia
- Maharashtra Electricity Regulatory Commission - India
- IHS Mccloskey Coal Group - USA
- Semirara Mining and Power Corporation, Philippines
- Bhushan Steel Limited - India
- New Zealand Coal & Carbon
- Georgia Ports Authority, United States
- Mercator Lines Limited - India
- TeaM Sual Corporation - Philippines
- Gujarat Electricity Regulatory Commission - India
- Vizag Seaport Private Limited - India
- Gujarat Sidhee Cement - India
- Bulk Trading Sa - Switzerland
- Bukit Asam (Persero) Tbk - Indonesia
- Central Java Power - Indonesia
- Wilmar Investment Holdings
- Meralco Power Generation, Philippines
- Trasteel International SA, Italy
- San Jose City I Power Corp, Philippines
- Borneo Indobara - Indonesia
- Maheswari Brothers Coal Limited - India
- Indika Energy - Indonesia
- Tata Chemicals Ltd - India
- Tamil Nadu electricity Board
- Binh Thuan Hamico - Vietnam
- GVK Power & Infra Limited - India
- Siam City Cement PLC, Thailand
- Vedanta Resources Plc - India
- Cigading International Bulk Terminal - Indonesia
- London Commodity Brokers - England
- Altura Mining Limited, Indonesia
- Bangladesh Power Developement Board
- Antam Resourcindo - Indonesia
- LBH Netherlands Bv - Netherlands
- Sinarmas Energy and Mining - Indonesia
- GN Power Mariveles Coal Plant, Philippines
- Lanco Infratech Ltd - India
- Intertek Mineral Services - Indonesia
- CIMB Investment Bank - Malaysia
- Grasim Industreis Ltd - India
- Thai Mozambique Logistica
- Sarangani Energy Corporation, Philippines
- Economic Council, Georgia
- Bukit Makmur.PT - Indonesia
- Agrawal Coal Company - India
- SMG Consultants - Indonesia
- Coastal Gujarat Power Limited - India
- Toyota Tsusho Corporation, Japan
- Heidelberg Cement - Germany
- Wood Mackenzie - Singapore
- Petron Corporation, Philippines
- Global Business Power Corporation, Philippines
- Indo Tambangraya Megah - Indonesia
- Minerals Council of Australia
- Coal and Oil Company - UAE
- ASAPP Information Group - India
- Jaiprakash Power Ventures ltd
- Kobexindo Tractors - Indoneisa
- Timah Investasi Mineral - Indoneisa
- Bharathi Cement Corporation - India
- Ind-Barath Power Infra Limited - India
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Medco Energi Mining Internasional
- Standard Chartered Bank - UAE
- Central Electricity Authority - India
- Parry Sugars Refinery, India
- Energy Link Ltd, New Zealand
- Neyveli Lignite Corporation Ltd, - India
- Manunggal Multi Energi - Indonesia
- ICICI Bank Limited - India
- Bukit Baiduri Energy - Indonesia
- Thiess Contractors Indonesia
- GMR Energy Limited - India
- Formosa Plastics Group - Taiwan
- The University of Queensland
- Ministry of Mines - Canada
- IEA Clean Coal Centre - UK
- European Bulk Services B.V. - Netherlands
- Semirara Mining Corp, Philippines
- Romanian Commodities Exchange
- Globalindo Alam Lestari - Indonesia
- Kalimantan Lumbung Energi - Indonesia
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Sindya Power Generating Company Private Ltd
- Interocean Group of Companies - India
- Eastern Coal Council - USA
- Gujarat Mineral Development Corp Ltd - India
- Straits Asia Resources Limited - Singapore
- Jorong Barutama Greston.PT - Indonesia
- Chamber of Mines of South Africa
- Aboitiz Power Corporation - Philippines
- International Coal Ventures Pvt Ltd - India
- Kohat Cement Company Ltd. - Pakistan
- Dalmia Cement Bharat India
- Kartika Selabumi Mining - Indonesia
- Samtan Co., Ltd - South Korea
- Holcim Trading Pte Ltd - Singapore
- Electricity Generating Authority of Thailand
- Kideco Jaya Agung - Indonesia
|
| |
| |
|