CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Monday, 22 August 11
MACRO ECONOMICS - PETER SAND BIMCO / HELLENIC SHIPPING
The US is jeopardising the global recovery as job creation remains top challenge across the board. Global economy: While growth in most emerging ...


Sunday, 21 August 11
SUPRAMAX AVAILABILITY WAS TIGHT DUE TO UPCOMING RAMADAN HOLIDAYS
COALspot.com - The financial markets have been in turmoil with all major stock exchanges down and uncertainty prevails. However the shipping market ...


Sunday, 21 August 11
TUAH TURANGGA ACQUIRES DUTA NURCAHYA
Coal miner PT Tuah Turangga Agung, a wholly owned subsidiary of PT United Tractors Tbk (UNTR) via PT Pamapersada Nusantara), has agreed to acquire 6 ...


Friday, 19 August 11
INDIAS CICTL HAS ACHIEVED ONE MILLION TONS OF DISCHARGE
COALspot.com - Chettinad International Coal Terminal (CICTL) in Ennore port, a state of the art mechanized coal terminal, which was inaugurated on 28t ...


Friday, 19 August 11
AUSTRALIAS' ATH TO ACQUIRE 60% OF APUAH COAL MINE IN INDONESIA
COALspot.com - Australian listed company, Atech Holdings Limited (ATH) has entered into a conditional binding term sheet to acquire 60 percent stake ...


   1024 1025 1026 1027 1028   
Showing 5126 to 5130 news of total 6871
News by Category
Popular News
 
Total Members : 28,621
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Russian Coal LLC
  • Kideco Jaya Agung - Indonesia
  • Cemex - Philippines
  • Shenhua Group - China
  • OPG Power Generation Pvt Ltd - India
  • Orica Australia Pty. Ltd.
  • MS Steel International - UAE
  • Asmin Koalindo Tuhup - Indonesia
  • Sinarmas Energy and Mining - Indonesia
  • Maharashtra Electricity Regulatory Commission - India
  • Thriveni
  • UBS Singapore
  • Glencore India Pvt. Ltd
  • New Zealand Coal & Carbon
  • Coeclerici Indonesia
  • Bhushan Steel Limited - India
  • Karbindo Abesyapradhi - Indoneisa
  • Petron Corporation, Philippines
  • Peabody Energy - USA
  • Antam Resourcindo - Indonesia
  • JPMorgan - India
  • Total Coal South Africa
  • TNPL - India
  • Essar Steel Hazira Ltd - India
  • Neyveli Lignite Corporation Ltd, - India
  • SMG Consultants - Indonesia
  • ASAPP Information Group - India
  • GVK Power & Infra Limited - India
  • Infraline Energy - India
  • Lafarge - France
  • Bahari Cakrawala Sebuku - Indonesia
  • Electricity Generating Authority of Thailand
  • Noble Europe Ltd - UK
  • Indonesian Coal Mining Association
  • IHS Mccloskey Coal Group - USA
  • Kaltim Prima Coal - Indonesia
  • BRS Brokers - Singapore
  • Leighton Contractors Pty Ltd - Australia
  • Cardiff University - UK
  • Pipit Mutiara Jaya. PT, Indonesia
  • Renaissance Capital - South Africa
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • KPCL - India
  • European Bulk Services B.V. - Netherlands
  • WorleyParsons
  • Bulk Trading Sa - Switzerland
  • Eastern Coal Council - USA
  • Merrill Lynch Commodities Europe
  • Berau Coal - Indonesia
  • Petrosea - Indonesia
  • Coastal Gujarat Power Limited - India
  • The State Trading Corporation of India Ltd
  • GHCL Limited - India
  • GNFC Limited - India
  • Manunggal Multi Energi - Indonesia
  • Coal Orbis AG
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • IEA Clean Coal Centre - UK
  • Vijayanagar Sugar Pvt Ltd - India
  • Indogreen Group - Indonesia
  • Simpson Spence & Young - Indonesia
  • Indian Energy Exchange, India
  • Rudhra Energy - India
  • Indorama - Singapore
  • London Commodity Brokers - England
  • Planning Commission, India
  • Global Business Power Corporation, Philippines
  • Grasim Industreis Ltd - India
  • Vitol - Bahrain
  • U S Energy Resources
  • IMC Shipping - Singapore
  • Mitra SK Pvt Ltd - India
  • Jatenergy - Australia
  • Bangkok Bank PCL
  • Cosco
  • Salva Resources Pvt Ltd - India
  • Permata Bank - Indonesia
  • Moodys - Singapore
  • CESC Limited - India
  • The University of Queensland
  • EIA - United States
  • Qatrana Cement - Jordan
  • Ince & co LLP
  • Coalindo Energy - Indonesia
  • Central Java Power - Indonesia
  • Sree Jayajothi Cements Limited - India
  • SRK Consulting
  • Arutmin Indonesia
  • Meralco Power Generation, Philippines
  • Baramulti Group, Indonesia
  • Dalmia Cement Bharat India
  • Reliance Power - India
  • Latin American Coal - Colombia
  • Wilmar Investment Holdings
  • Maruti Cements - India
  • HSBC - Hong Kong
  • Singapore Mercantile Exchange
  • CCIC - Indonesia
  • Indonesia Power. PT
  • ACC Limited - India
  • Thomson Reuters GRC
  • Jindal Steel & Power Ltd - India
  • Cigading International Bulk Terminal - Indonesia
  • Ministry of Mines - Canada
  • Tamil Nadu electricity Board
  • Rashtriya Ispat Nigam Limited - India
  • GAC Shipping (India) Pvt Ltd
  • EMO - The Netherlands
  • Indika Energy - Indonesia
  • CIMB Investment Bank - Malaysia
  • PetroVietnam
  • TANGEDCO India
  • SGS (Thailand) Limited
  • Bangladesh Power Developement Board
  • Attock Cement Pakistan Limited
  • TeaM Sual Corporation - Philippines
  • Goldman Sachs - Singapore
  • Timah Investasi Mineral - Indoneisa
  • Krishnapatnam Port Company Ltd. - India
  • SMC Global Power, Philippines
  • Kapuas Tunggal Persada - Indonesia
  • Energy Link Ltd, New Zealand
  • Indian School of Mines
  • Gujarat Sidhee Cement - India
  • San Jose City I Power Corp, Philippines
  • Global Coal Blending Company Limited - Australia
  • Idemitsu - Japan
  • SN Aboitiz Power Inc, Philippines
  • ANZ Bank - Australia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Mechel - Russia
  • Intertek Mineral Services - Indonesia
  • Chettinad Cement Corporation Ltd - India
  • Lanco Infratech Ltd - India
  • Kalimantan Lumbung Energi - Indonesia
  • Ernst & Young Pvt. Ltd.
  • Ind-Barath Power Infra Limited - India
  • Geoservices-GeoAssay Lab
  • Siam City Cement PLC, Thailand
  • Directorate General of MIneral and Coal - Indonesia
  • Mercator Lines Limited - India
  • Orica Mining Services - Indonesia
  • Fearnleys - India
  • TNB Fuel Sdn Bhd - Malaysia
  • NTPC Limited - India
  • ING Bank NV - Singapore
  • Karaikal Port Pvt Ltd - India
  • Marubeni Corporation - India
  • Uttam Galva Steels Limited - India
  • Deloitte Consulting - India
  • VISA Power Limited - India
  • Inco-Indonesia
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • McKinsey & Co - India
  • Heidelberg Cement - Germany
  • Medco Energi Mining Internasional
  • Xindia Steels Limited - India
  • Minerals Council of Australia
  • LBH Netherlands Bv - Netherlands
  • Mitsui
  • Britmindo - Indonesia
  • Gujarat Electricity Regulatory Commission - India
  • Sarangani Energy Corporation, Philippines
  • Core Mineral Indonesia
  • Kepco SPC Power Corporation, Philippines
  • Samtan Co., Ltd - South Korea
  • GMR Energy Limited - India
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Alfred C Toepfer International GmbH - Germany
  • Adaro Indonesia
  • APGENCO India
  • Tata Chemicals Ltd - India
  • IBC Asia (S) Pte Ltd
  • Parliament of New Zealand
  • Pendopo Energi Batubara - Indonesia
  • Aboitiz Power Corporation - Philippines
  • Altura Mining Limited, Indonesia
  • Enel Italy
  • Thermax Limited - India
  • Surastha Cement
  • KPMG - USA
  • Bank of China, Malaysia
  • Credit Suisse - India
  • Videocon Industries ltd - India
  • Maheswari Brothers Coal Limited - India
  • Jaiprakash Power Ventures ltd
  • Central Electricity Authority - India
  • PowerSource Philippines DevCo
  • AsiaOL BioFuels Corp., Philippines
  • Economic Council, Georgia
  • CNBM International Corporation - China
  • Anglo American - United Kingdom
  • Ministry of Finance - Indonesia
  • ICICI Bank Limited - India
  • Vizag Seaport Private Limited - India
  • Banpu Public Company Limited - Thailand
  • GB Group - China
  • PetroVietnam Power Coal Import and Supply Company
  • Ceylon Electricity Board - Sri Lanka
  • Trasteel International SA, Italy
  • Platou - Singapore
  • World Coal - UK
  • Binh Thuan Hamico - Vietnam
  • The Treasury - Australian Government
  • Jorong Barutama Greston.PT - Indonesia
  • Adani Power Ltd - India
  • Eastern Energy - Thailand
  • Australian Commodity Traders Exchange
  • Tanito Harum - Indonesia
  • MEC Coal - Indonesia
  • Maersk Broker
  • Chamber of Mines of South Africa
  • The India Cements Ltd
  • White Energy Company Limited
  • Bayan Resources Tbk. - Indonesia
  • Argus Media - Singapore
  • Energy Development Corp, Philippines
  • Edison Trading Spa - Italy
  • Bhatia International Limited - India
  • Power Finance Corporation Ltd., India
  • Indo Tambangraya Megah - Indonesia
  • Inspectorate - India
  • Humpuss - Indonesia
  • Oldendorff Carriers - Singapore
  • Mercuria Energy - Indonesia
  • Indian Oil Corporation Limited
  • Coaltrans Conferences
  • PLN Batubara - Indonesia
  • Maybank - Singapore
  • Barasentosa Lestari - Indonesia
  • Miang Besar Coal Terminal - Indonesia
  • Star Paper Mills Limited - India
  • Mjunction Services Limited - India
  • World Bank
  • Iligan Light & Power Inc, Philippines
  • Cement Manufacturers Association - India
  • Malabar Cements Ltd - India
  • Deutsche Bank - India
  • Japan Coal Energy Center
  • KOWEPO - South Korea
  • Aditya Birla Group - India
  • Clarksons - UK
  • PLN - Indonesia
  • India Bulls Power Limited - India
  • Coal and Oil Company - UAE
  • Bank of America
  • Commonwealth Bank - Australia
  • Sucofindo - Indonesia
  • PTC India Limited - India
  • J M Baxi & Co - India
  • Rio Tinto Coal - Australia
  • Electricity Authority, New Zealand
  • Larsen & Toubro Limited - India
  • Sindya Power Generating Company Private Ltd
  • Kobexindo Tractors - Indoneisa
  • Port Waratah Coal Services - Australia
  • Xstrata Coal
  • NALCO India
  • Bukit Makmur.PT - Indonesia
  • Meenaskhi Energy Private Limited - India
  • Directorate Of Revenue Intelligence - India
  • Runge Indonesia
  • SUEK AG - Indonesia
  • Thiess Contractors Indonesia
  • Metalloyd Limited - United Kingdom
  • Globalindo Alam Lestari - Indonesia
  • Parry Sugars Refinery, India
  • Vedanta Resources Plc - India
  • Shree Cement - India
  • Asian Development Bank
  • Agrawal Coal Company - India
  • Thailand Anthracite
  • globalCOAL - UK
  • TRAFIGURA, South Korea
  • RBS Sempra - UK
  • UOB Asia (HK) Ltd
  • Kohat Cement Company Ltd. - Pakistan
  • OCBC - Singapore
  • Independent Power Producers Association of India
  • Toyota Tsusho Corporation, Japan
  • Cebu Energy, Philippines
  • Price Waterhouse Coopers - Russia
  • South Luzon Thermal Energy Corporation
  • Bhoruka Overseas - Indonesia
  • BNP Paribas - Singapore
  • Sojitz Corporation - Japan
  • JPower - Japan
  • CoalTek, United States
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Riau Bara Harum - Indonesia
  • Bharathi Cement Corporation - India
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Standard Chartered Bank - UAE
  • Therma Luzon, Inc, Philippines
  • Samsung - South Korea
  • Wood Mackenzie - Singapore
  • Gupta Coal India Ltd
  • TGV SRAAC LIMITED, India
  • Arch Coal - USA
  • Tata Power - India
  • DBS Bank - Singapore
  • Malco - India
  • Semirara Mining and Power Corporation, Philippines
  • Siam City Cement - Thailand
  • GN Power Mariveles Coal Plant, Philippines
  • Global Green Power PLC Corporation, Philippines
  • Bukit Asam (Persero) Tbk - Indonesia
  • Sakthi Sugars Limited - India
  • Platts
  • Pinang Coal Indonesia
  • Carbofer General Trading SA - India
  • Formosa Plastics Group - Taiwan
  • Makarim & Taira - Indonesia
  • Kumho Petrochemical, South Korea
  • Coal India Limited
  • bp singapore
  • Mintek Dendrill Indonesia
  • Posco Energy - South Korea
  • Georgia Ports Authority, United States
  • Savvy Resources Ltd - HongKong
  • McConnell Dowell - Australia
  • Madhucon Powers Ltd - India
  • Asia Cement - Taiwan
  • Kobe Steel Ltd - Japan
  • Holcim Trading Pte Ltd - Singapore
  • Barclays Capital - USA
  • Borneo Indobara - Indonesia
  • Australian Coal Association
  • Cargill India Pvt Ltd
  • Semirara Mining Corp, Philippines
  • Billiton Holdings Pty Ltd - Australia
  • Ambuja Cements Ltd - India
  • Thai Mozambique Logistica
  • Vale Mozambique
  • Bukit Baiduri Energy - Indonesia
  • Sical Logistics Limited - India
  • Straits Asia Resources Limited - Singapore
  • Interocean Group of Companies - India
  • ETA - Dubai
  • SASOL - South Africa
  • Petrochimia International Co. Ltd.- Taiwan
  • Africa Commodities Group - South Africa
  • PNOC Exploration Corporation - Philippines
  • Kartika Selabumi Mining - Indonesia
  • Gresik Semen - Indonesia
  • IOL Indonesia
  • Ministry of Transport, Egypt
  • KEPCO - South Korea
  • Freeport Indonesia
  • Panama Canal Authority
  • Romanian Commodities Exchange
  • Mitsubishi Corporation
  • Gujarat Mineral Development Corp Ltd - India
  • International Coal Ventures Pvt Ltd - India
  • Merrill Lynch Bank