CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Sunday, 28 August 11
FREIGHT MARKET COULD BE FIRM NEXT MONTH - VISTAAR
COALspot.com - The freight market continued the upward trend first half of the week . However, towards the end of the week lost momentum and the BDI ...


Saturday, 27 August 11
JAPANESE BULK CARRIER SETS RECORD ON NORTHERN SEA ROUTE - BARENTS OBSERVER
The Northern Sea Route will see its third record in less than a month when the largest ever bulk carrier to take the route leaves Murmansk next week ...


Saturday, 27 August 11
RBCT-INDIA ROUNDS FIXED AT AROUND US$ 12K - FEARNBULK
Handy Stable but very positional markets across all segments in the Atlantic: the gap between owners and charterers rate ideas is building up as o ...


Friday, 26 August 11
TUAH TURANGGA AGUNG ACQUIRES AN ADDITIONAL 40% SHARES IN BARA PRIMA AGUNG
COALspot.com - PT Tuah Turangga Agung, a subsidiary of PT United Tractors Tbk, has signed an acquisition agreement to acquire 40% of PT Bara Prima A ...


Friday, 26 August 11
INTRACO EYES US$200 MIO COAL TAKEOVER - INSIDER STORIES
Heavy equipment distributor PT Intraco Penta Tbk, that was founded by Halex Halim, is scouting a coal acquisition with the valuation above US$200 mi ...


   1021 1022 1023 1024 1025   
Showing 5111 to 5115 news of total 6871
News by Category
Popular News
 
Total Members : 28,621
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Humpuss - Indonesia
  • Lanco Infratech Ltd - India
  • Bukit Makmur.PT - Indonesia
  • Baramulti Group, Indonesia
  • Tata Power - India
  • Argus Media - Singapore
  • Coal India Limited
  • SGS (Thailand) Limited
  • Billiton Holdings Pty Ltd - Australia
  • Rio Tinto Coal - Australia
  • Carbofer General Trading SA - India
  • Bangkok Bank PCL
  • Total Coal South Africa
  • Electricity Authority, New Zealand
  • Australian Commodity Traders Exchange
  • Vitol - Bahrain
  • Bayan Resources Tbk. - Indonesia
  • GNFC Limited - India
  • TNPL - India
  • Peabody Energy - USA
  • MEC Coal - Indonesia
  • Asian Development Bank
  • Wilmar Investment Holdings
  • Straits Asia Resources Limited - Singapore
  • Merrill Lynch Bank
  • Bangladesh Power Developement Board
  • Sakthi Sugars Limited - India
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Shree Cement - India
  • TNB Fuel Sdn Bhd - Malaysia
  • Formosa Plastics Group - Taiwan
  • Manunggal Multi Energi - Indonesia
  • Pendopo Energi Batubara - Indonesia
  • Barasentosa Lestari - Indonesia
  • Mechel - Russia
  • Essar Steel Hazira Ltd - India
  • Rudhra Energy - India
  • SN Aboitiz Power Inc, Philippines
  • McKinsey & Co - India
  • Maheswari Brothers Coal Limited - India
  • Malabar Cements Ltd - India
  • Coastal Gujarat Power Limited - India
  • Larsen & Toubro Limited - India
  • Gujarat Mineral Development Corp Ltd - India
  • Bank of China, Malaysia
  • Cargill India Pvt Ltd
  • Tanito Harum - Indonesia
  • Kumho Petrochemical, South Korea
  • Marubeni Corporation - India
  • Metalloyd Limited - United Kingdom
  • Kepco SPC Power Corporation, Philippines
  • Eastern Coal Council - USA
  • Russian Coal LLC
  • Panama Canal Authority
  • Energy Link Ltd, New Zealand
  • Moodys - Singapore
  • Latin American Coal - Colombia
  • U S Energy Resources
  • Central Electricity Authority - India
  • Sojitz Corporation - Japan
  • Vale Mozambique
  • Mjunction Services Limited - India
  • Permata Bank - Indonesia
  • OPG Power Generation Pvt Ltd - India
  • Bukit Asam (Persero) Tbk - Indonesia
  • Indika Energy - Indonesia
  • Indorama - Singapore
  • Vedanta Resources Plc - India
  • Electricity Generating Authority of Thailand
  • KPCL - India
  • Globalindo Alam Lestari - Indonesia
  • Ind-Barath Power Infra Limited - India
  • Coal and Oil Company - UAE
  • SUEK AG - Indonesia
  • Central Java Power - Indonesia
  • Therma Luzon, Inc, Philippines
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • ICICI Bank Limited - India
  • Gresik Semen - Indonesia
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • ANZ Bank - Australia
  • Samsung - South Korea
  • Kobexindo Tractors - Indoneisa
  • Vijayanagar Sugar Pvt Ltd - India
  • SMC Global Power, Philippines
  • Platts
  • Parliament of New Zealand
  • PNOC Exploration Corporation - Philippines
  • Alfred C Toepfer International GmbH - Germany
  • Savvy Resources Ltd - HongKong
  • IBC Asia (S) Pte Ltd
  • Shenhua Group - China
  • Aditya Birla Group - India
  • Price Waterhouse Coopers - Russia
  • South Luzon Thermal Energy Corporation
  • TGV SRAAC LIMITED, India
  • Indonesian Coal Mining Association
  • Australian Coal Association
  • TRAFIGURA, South Korea
  • WorleyParsons
  • Intertek Mineral Services - Indonesia
  • Geoservices-GeoAssay Lab
  • Sucofindo - Indonesia
  • IEA Clean Coal Centre - UK
  • Idemitsu - Japan
  • Makarim & Taira - Indonesia
  • Sindya Power Generating Company Private Ltd
  • Trasteel International SA, Italy
  • Jaiprakash Power Ventures ltd
  • Dalmia Cement Bharat India
  • Chamber of Mines of South Africa
  • San Jose City I Power Corp, Philippines
  • European Bulk Services B.V. - Netherlands
  • Sinarmas Energy and Mining - Indonesia
  • Lafarge - France
  • CNBM International Corporation - China
  • UBS Singapore
  • Pipit Mutiara Jaya. PT, Indonesia
  • Surastha Cement
  • Gujarat Electricity Regulatory Commission - India
  • Goldman Sachs - Singapore
  • Holcim Trading Pte Ltd - Singapore
  • GMR Energy Limited - India
  • London Commodity Brokers - England
  • GN Power Mariveles Coal Plant, Philippines
  • Core Mineral Indonesia
  • Samtan Co., Ltd - South Korea
  • Mercuria Energy - Indonesia
  • Enel Italy
  • Gupta Coal India Ltd
  • Bhatia International Limited - India
  • Gujarat Sidhee Cement - India
  • Global Business Power Corporation, Philippines
  • Star Paper Mills Limited - India
  • Wood Mackenzie - Singapore
  • Jatenergy - Australia
  • RBS Sempra - UK
  • Siam City Cement - Thailand
  • Karaikal Port Pvt Ltd - India
  • ING Bank NV - Singapore
  • AsiaOL BioFuels Corp., Philippines
  • Medco Energi Mining Internasional
  • BNP Paribas - Singapore
  • Maruti Cements - India
  • Videocon Industries ltd - India
  • SMG Consultants - Indonesia
  • Karbindo Abesyapradhi - Indoneisa
  • VISA Power Limited - India
  • JPower - Japan
  • Leighton Contractors Pty Ltd - Australia
  • Thiess Contractors Indonesia
  • Inspectorate - India
  • Parry Sugars Refinery, India
  • KPMG - USA
  • Maybank - Singapore
  • Maersk Broker
  • Grasim Industreis Ltd - India
  • Ince & co LLP
  • Ceylon Electricity Board - Sri Lanka
  • Asia Cement - Taiwan
  • Power Finance Corporation Ltd., India
  • Kohat Cement Company Ltd. - Pakistan
  • JPMorgan - India
  • Bukit Baiduri Energy - Indonesia
  • Heidelberg Cement - Germany
  • ACC Limited - India
  • Commonwealth Bank - Australia
  • Adani Power Ltd - India
  • Renaissance Capital - South Africa
  • Runge Indonesia
  • Pinang Coal Indonesia
  • Clarksons - UK
  • CESC Limited - India
  • Timah Investasi Mineral - Indoneisa
  • Barclays Capital - USA
  • Cement Manufacturers Association - India
  • Infraline Energy - India
  • Bank of America
  • Japan Coal Energy Center
  • Ambuja Cements Ltd - India
  • BRS Brokers - Singapore
  • IOL Indonesia
  • Indogreen Group - Indonesia
  • India Bulls Power Limited - India
  • KOWEPO - South Korea
  • Kideco Jaya Agung - Indonesia
  • Directorate Of Revenue Intelligence - India
  • Sarangani Energy Corporation, Philippines
  • DBS Bank - Singapore
  • The State Trading Corporation of India Ltd
  • CoalTek, United States
  • EMO - The Netherlands
  • Krishnapatnam Port Company Ltd. - India
  • EIA - United States
  • Cemex - Philippines
  • Kobe Steel Ltd - Japan
  • Adaro Indonesia
  • Coalindo Energy - Indonesia
  • Thai Mozambique Logistica
  • PowerSource Philippines DevCo
  • GHCL Limited - India
  • The India Cements Ltd
  • Kalimantan Lumbung Energi - Indonesia
  • Madhucon Powers Ltd - India
  • bp singapore
  • KEPCO - South Korea
  • Anglo American - United Kingdom
  • Sical Logistics Limited - India
  • Sree Jayajothi Cements Limited - India
  • Siam City Cement PLC, Thailand
  • Global Green Power PLC Corporation, Philippines
  • Coaltrans Conferences
  • LBH Netherlands Bv - Netherlands
  • World Bank
  • Meenaskhi Energy Private Limited - India
  • Singapore Mercantile Exchange
  • Xstrata Coal
  • Standard Chartered Bank - UAE
  • Arutmin Indonesia
  • Merrill Lynch Commodities Europe
  • Indian Oil Corporation Limited
  • Thailand Anthracite
  • Mintek Dendrill Indonesia
  • J M Baxi & Co - India
  • Thermax Limited - India
  • Jindal Steel & Power Ltd - India
  • Cardiff University - UK
  • HSBC - Hong Kong
  • Energy Development Corp, Philippines
  • Simpson Spence & Young - Indonesia
  • Deutsche Bank - India
  • Toyota Tsusho Corporation, Japan
  • CCIC - Indonesia
  • Independent Power Producers Association of India
  • Cebu Energy, Philippines
  • Deloitte Consulting - India
  • Xindia Steels Limited - India
  • The Treasury - Australian Government
  • Petrochimia International Co. Ltd.- Taiwan
  • Maharashtra Electricity Regulatory Commission - India
  • ASAPP Information Group - India
  • UOB Asia (HK) Ltd
  • Romanian Commodities Exchange
  • McConnell Dowell - Australia
  • Jorong Barutama Greston.PT - Indonesia
  • CIMB Investment Bank - Malaysia
  • Bharathi Cement Corporation - India
  • Neyveli Lignite Corporation Ltd, - India
  • Directorate General of MIneral and Coal - Indonesia
  • Chettinad Cement Corporation Ltd - India
  • Bulk Trading Sa - Switzerland
  • GVK Power & Infra Limited - India
  • Petrosea - Indonesia
  • Riau Bara Harum - Indonesia
  • Thomson Reuters GRC
  • Fearnleys - India
  • Antam Resourcindo - Indonesia
  • Economic Council, Georgia
  • Malco - India
  • Africa Commodities Group - South Africa
  • Mercator Lines Limited - India
  • New Zealand Coal & Carbon
  • Britmindo - Indonesia
  • Thriveni
  • PetroVietnam
  • Semirara Mining Corp, Philippines
  • ETA - Dubai
  • Global Coal Blending Company Limited - Australia
  • Oldendorff Carriers - Singapore
  • Agrawal Coal Company - India
  • TeaM Sual Corporation - Philippines
  • Orica Australia Pty. Ltd.
  • Borneo Indobara - Indonesia
  • Meralco Power Generation, Philippines
  • Bhushan Steel Limited - India
  • Semirara Mining and Power Corporation, Philippines
  • NTPC Limited - India
  • Ernst & Young Pvt. Ltd.
  • Attock Cement Pakistan Limited
  • Inco-Indonesia
  • Platou - Singapore
  • Bhoruka Overseas - Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • NALCO India
  • Interocean Group of Companies - India
  • Posco Energy - South Korea
  • Tamil Nadu electricity Board
  • IMC Shipping - Singapore
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • PLN - Indonesia
  • OCBC - Singapore
  • Iligan Light & Power Inc, Philippines
  • Minerals Council of Australia
  • Port Waratah Coal Services - Australia
  • Kapuas Tunggal Persada - Indonesia
  • Aboitiz Power Corporation - Philippines
  • Orica Mining Services - Indonesia
  • IHS Mccloskey Coal Group - USA
  • Arch Coal - USA
  • Vizag Seaport Private Limited - India
  • Banpu Public Company Limited - Thailand
  • Uttam Galva Steels Limited - India
  • Freeport Indonesia
  • Indian Energy Exchange, India
  • Coal Orbis AG
  • MS Steel International - UAE
  • Georgia Ports Authority, United States
  • Mitra SK Pvt Ltd - India
  • Reliance Power - India
  • Eastern Energy - Thailand
  • globalCOAL - UK
  • Edison Trading Spa - Italy
  • Mitsubishi Corporation
  • World Coal - UK
  • Miang Besar Coal Terminal - Indonesia
  • Ministry of Transport, Egypt
  • Kaltim Prima Coal - Indonesia
  • Kartika Selabumi Mining - Indonesia
  • GAC Shipping (India) Pvt Ltd
  • Glencore India Pvt. Ltd
  • TANGEDCO India
  • Asmin Koalindo Tuhup - Indonesia
  • Indian School of Mines
  • PetroVietnam Power Coal Import and Supply Company
  • Ministry of Finance - Indonesia
  • Qatrana Cement - Jordan
  • GB Group - China
  • Binh Thuan Hamico - Vietnam
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Salva Resources Pvt Ltd - India
  • Indonesia Power. PT
  • Cigading International Bulk Terminal - Indonesia
  • PTC India Limited - India
  • Ministry of Mines - Canada
  • The University of Queensland
  • Tata Chemicals Ltd - India
  • Altura Mining Limited, Indonesia
  • APGENCO India
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • PLN Batubara - Indonesia
  • Cosco
  • Coeclerici Indonesia
  • International Coal Ventures Pvt Ltd - India
  • Berau Coal - Indonesia
  • Noble Europe Ltd - UK
  • Indo Tambangraya Megah - Indonesia
  • Mitsui
  • White Energy Company Limited
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Bahari Cakrawala Sebuku - Indonesia
  • Credit Suisse - India
  • SRK Consulting
  • Planning Commission, India
  • SASOL - South Africa
  • Petron Corporation, Philippines