CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Wednesday, 05 October 11
WITH CHINA ON HOLIDAY, DRY BULK MARKET REMAINS STAGNANT - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The dry bulk market has remained to healthy levels after last month’s rally, but with China going on holiday this week, things are looking sta ...
Tuesday, 04 October 11
INDONESIA RAISES COAL BENCHMARK (HBA) FOR FIRST TIME IN 4 MONTHS
COALspot.com - Indonesia raised the monthly reference price for sales in October by 2.56 percent, the first increase since June.
The Ministry of ...
Tuesday, 04 October 11
COAL MINING GROUP WANTS EXPORT TAX, NOT EXCISE - JG
One of the leading English news paper in Indonesia, The Jakarta Globe reported that, the government shall reimpose a duty on coal exports, classifyi ...
Sunday, 02 October 11
INDIAN COAL IMPORTS PICKED UP - CAPT. REDDY
COALspot.com - The BDI dropped by 1 pct and Cape index dropped by 6 pct closing at 1,899 points and 3,136 points respectively. However all other seg ...
Saturday, 01 October 11
2012 TO BE ANOTHER CHALLENGING YEAR - CEO, REMI MARITIME
Shipowners are facing another challenging year in 2012 said Mr. Leonidas Polemis CEO of Remi Maritime Corporation, urging caution towards operating ...
|
|
|
Showing 5051 to 5055 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Meralco Power Generation, Philippines
- LBH Netherlands Bv - Netherlands
- Posco Energy - South Korea
- White Energy Company Limited
- Wood Mackenzie - Singapore
- Grasim Industreis Ltd - India
- CIMB Investment Bank - Malaysia
- Chettinad Cement Corporation Ltd - India
- Trasteel International SA, Italy
- Latin American Coal - Colombia
- Bukit Asam (Persero) Tbk - Indonesia
- ICICI Bank Limited - India
- Electricity Generating Authority of Thailand
- London Commodity Brokers - England
- Star Paper Mills Limited - India
- Price Waterhouse Coopers - Russia
- Gujarat Mineral Development Corp Ltd - India
- AsiaOL BioFuels Corp., Philippines
- Toyota Tsusho Corporation, Japan
- Central Java Power - Indonesia
- Coalindo Energy - Indonesia
- Commonwealth Bank - Australia
- Videocon Industries ltd - India
- Neyveli Lignite Corporation Ltd, - India
- Kapuas Tunggal Persada - Indonesia
- Deloitte Consulting - India
- PowerSource Philippines DevCo
- GMR Energy Limited - India
- Altura Mining Limited, Indonesia
- Indogreen Group - Indonesia
- Kumho Petrochemical, South Korea
- Aditya Birla Group - India
- Formosa Plastics Group - Taiwan
- Global Business Power Corporation, Philippines
- Iligan Light & Power Inc, Philippines
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Malabar Cements Ltd - India
- Dalmia Cement Bharat India
- Petrochimia International Co. Ltd.- Taiwan
- Coal and Oil Company - UAE
- Wilmar Investment Holdings
- ASAPP Information Group - India
- SN Aboitiz Power Inc, Philippines
- Sarangani Energy Corporation, Philippines
- Baramulti Group, Indonesia
- Madhucon Powers Ltd - India
- Leighton Contractors Pty Ltd - Australia
- Sinarmas Energy and Mining - Indonesia
- GAC Shipping (India) Pvt Ltd
- Holcim Trading Pte Ltd - Singapore
- Antam Resourcindo - Indonesia
- Ministry of Mines - Canada
- Globalindo Alam Lestari - Indonesia
- Larsen & Toubro Limited - India
- Ind-Barath Power Infra Limited - India
- Krishnapatnam Port Company Ltd. - India
- Carbofer General Trading SA - India
- TeaM Sual Corporation - Philippines
- Borneo Indobara - Indonesia
- Bahari Cakrawala Sebuku - Indonesia
- Karbindo Abesyapradhi - Indoneisa
- The State Trading Corporation of India Ltd
- Siam City Cement - Thailand
- Medco Energi Mining Internasional
- Kohat Cement Company Ltd. - Pakistan
- Anglo American - United Kingdom
- Australian Commodity Traders Exchange
- Rio Tinto Coal - Australia
- VISA Power Limited - India
- India Bulls Power Limited - India
- Gujarat Sidhee Cement - India
- Bangladesh Power Developement Board
- Australian Coal Association
- Tamil Nadu electricity Board
- Parliament of New Zealand
- CNBM International Corporation - China
- PNOC Exploration Corporation - Philippines
- Renaissance Capital - South Africa
- Sree Jayajothi Cements Limited - India
- Vijayanagar Sugar Pvt Ltd - India
- Sakthi Sugars Limited - India
- The Treasury - Australian Government
- Meenaskhi Energy Private Limited - India
- Mintek Dendrill Indonesia
- Bank of Tokyo Mitsubishi UFJ Ltd
- Coastal Gujarat Power Limited - India
- Independent Power Producers Association of India
- Planning Commission, India
- Cigading International Bulk Terminal - Indonesia
- Barasentosa Lestari - Indonesia
- Power Finance Corporation Ltd., India
- Sojitz Corporation - Japan
- Orica Australia Pty. Ltd.
- Vizag Seaport Private Limited - India
- Lanco Infratech Ltd - India
- Oldendorff Carriers - Singapore
- Banpu Public Company Limited - Thailand
- Directorate Of Revenue Intelligence - India
- Georgia Ports Authority, United States
- Indonesian Coal Mining Association
- European Bulk Services B.V. - Netherlands
- Edison Trading Spa - Italy
- Simpson Spence & Young - Indonesia
- Indika Energy - Indonesia
- PetroVietnam Power Coal Import and Supply Company
- Bukit Makmur.PT - Indonesia
- Agrawal Coal Company - India
- Offshore Bulk Terminal Pte Ltd, Singapore
- Sindya Power Generating Company Private Ltd
- Heidelberg Cement - Germany
- Directorate General of MIneral and Coal - Indonesia
- Salva Resources Pvt Ltd - India
- Aboitiz Power Corporation - Philippines
- Singapore Mercantile Exchange
- Xindia Steels Limited - India
- PTC India Limited - India
- Kaltim Prima Coal - Indonesia
- Asia Pacific Energy Resources Ventures Inc, Philippines
- Bhatia International Limited - India
- Timah Investasi Mineral - Indoneisa
- Kideco Jaya Agung - Indonesia
- Semirara Mining Corp, Philippines
- Bukit Baiduri Energy - Indonesia
- Mercuria Energy - Indonesia
- Siam City Cement PLC, Thailand
- OPG Power Generation Pvt Ltd - India
- GVK Power & Infra Limited - India
- International Coal Ventures Pvt Ltd - India
- Indian Oil Corporation Limited
- Maheswari Brothers Coal Limited - India
- Asmin Koalindo Tuhup - Indonesia
- Makarim & Taira - Indonesia
- Ceylon Electricity Board - Sri Lanka
- Africa Commodities Group - South Africa
- Global Coal Blending Company Limited - Australia
- New Zealand Coal & Carbon
- Jindal Steel & Power Ltd - India
- Eastern Energy - Thailand
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Bulk Trading Sa - Switzerland
- MS Steel International - UAE
- Indian Energy Exchange, India
- Petron Corporation, Philippines
- Indo Tambangraya Megah - Indonesia
- Orica Mining Services - Indonesia
- Marubeni Corporation - India
- Cement Manufacturers Association - India
- Port Waratah Coal Services - Australia
- TNB Fuel Sdn Bhd - Malaysia
- Electricity Authority, New Zealand
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Interocean Group of Companies - India
- Bharathi Cement Corporation - India
- IHS Mccloskey Coal Group - USA
- Global Green Power PLC Corporation, Philippines
- Merrill Lynch Commodities Europe
- Economic Council, Georgia
- Goldman Sachs - Singapore
- Riau Bara Harum - Indonesia
- Ministry of Transport, Egypt
- Thiess Contractors Indonesia
- South Luzon Thermal Energy Corporation
- Mercator Lines Limited - India
- Alfred C Toepfer International GmbH - Germany
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Bhoruka Overseas - Indonesia
- Vedanta Resources Plc - India
- Romanian Commodities Exchange
- Tata Chemicals Ltd - India
- Ambuja Cements Ltd - India
- Miang Besar Coal Terminal - Indonesia
- Savvy Resources Ltd - HongKong
- Kartika Selabumi Mining - Indonesia
- GN Power Mariveles Coal Plant, Philippines
- Straits Asia Resources Limited - Singapore
- Rashtriya Ispat Nigam Limited - India
- Thai Mozambique Logistica
- SMG Consultants - Indonesia
- Bayan Resources Tbk. - Indonesia
- Mjunction Services Limited - India
- The University of Queensland
- Minerals Council of Australia
- Pipit Mutiara Jaya. PT, Indonesia
- Attock Cement Pakistan Limited
- Eastern Coal Council - USA
- Therma Luzon, Inc, Philippines
- Uttam Galva Steels Limited - India
- Maharashtra Electricity Regulatory Commission - India
- Central Electricity Authority - India
- Binh Thuan Hamico - Vietnam
- McConnell Dowell - Australia
- Manunggal Multi Energi - Indonesia
- Kalimantan Lumbung Energi - Indonesia
- Ministry of Finance - Indonesia
- Semirara Mining and Power Corporation, Philippines
- Kepco SPC Power Corporation, Philippines
- Standard Chartered Bank - UAE
- Sical Logistics Limited - India
- Samtan Co., Ltd - South Korea
- Essar Steel Hazira Ltd - India
- IEA Clean Coal Centre - UK
- Karaikal Port Pvt Ltd - India
- Kobexindo Tractors - Indoneisa
- Jaiprakash Power Ventures ltd
- Billiton Holdings Pty Ltd - Australia
- Metalloyd Limited - United Kingdom
- Chamber of Mines of South Africa
- Jorong Barutama Greston.PT - Indonesia
- Gujarat Electricity Regulatory Commission - India
- Energy Link Ltd, New Zealand
- Energy Development Corp, Philippines
- Bhushan Steel Limited - India
- Pendopo Energi Batubara - Indonesia
- San Jose City I Power Corp, Philippines
- SMC Global Power, Philippines
- Parry Sugars Refinery, India
- Intertek Mineral Services - Indonesia
|
| |
| |
|