CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Wednesday, 26 October 11
PWCS GLOBAL SHIPPING BENCHMARKING ANALYSIS: RECOVERY IN 2010 BUT GREAT UNCERTAINLY FOR 2011
The recovery of global trade in 2010 to the same levels as 2008 led to an improvement in the overall performance of shipping companies in 2010 compa ...
Wednesday, 26 October 11
INDIAN MARKET WAS REMAINED TIGHT THE WHOLE LAST WEEK - BRS
The market once more seems to be at a crossroads. The indices last week remained fairly stable (except for the Panamax sector), ending the week as f ...
Tuesday, 25 October 11
DRY BULK MARKET STEADY, ANALYSTS LOOKING FOR ADDED PRESSURE ON THE MARKET - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The dry bulk market was unchanged on Monday, with the industry’s benchmark, the BDI (Baltic Dry Index) ending the session at 2,153 points, exa ...
Monday, 24 October 11
NEW HEAD OF INDONESIA'S MINING MINISTRY GETS RAKED OVER THE COALS - JOSEPH KIRSCHKE
COALspot.com - Following Indonesia’s presidential cabinet shakeup last week, many are questioning the qualifications of Energy and Mineral Res ...
Monday, 24 October 11
CHINA QINHUANGDAO COAL PRICE RISES TO HIGHEST IN THREE YEARS - BUSINESSWEEK
Business week reported that, China’s power-station coal price rose to the highest level in three years as power stations and central heating p ...
|
|
|
Showing 5011 to 5015 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Bank of Tokyo Mitsubishi UFJ Ltd
- GAC Shipping (India) Pvt Ltd
- GN Power Mariveles Coal Plant, Philippines
- Posco Energy - South Korea
- Global Green Power PLC Corporation, Philippines
- Essar Steel Hazira Ltd - India
- Eastern Coal Council - USA
- CNBM International Corporation - China
- Altura Mining Limited, Indonesia
- Bhoruka Overseas - Indonesia
- Power Finance Corporation Ltd., India
- Electricity Authority, New Zealand
- Formosa Plastics Group - Taiwan
- Jindal Steel & Power Ltd - India
- Kumho Petrochemical, South Korea
- GMR Energy Limited - India
- Merrill Lynch Commodities Europe
- Semirara Mining and Power Corporation, Philippines
- PTC India Limited - India
- Bahari Cakrawala Sebuku - Indonesia
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Marubeni Corporation - India
- Interocean Group of Companies - India
- Star Paper Mills Limited - India
- The University of Queensland
- ASAPP Information Group - India
- Kaltim Prima Coal - Indonesia
- Thai Mozambique Logistica
- TNB Fuel Sdn Bhd - Malaysia
- Indika Energy - Indonesia
- Pipit Mutiara Jaya. PT, Indonesia
- Central Java Power - Indonesia
- Borneo Indobara - Indonesia
- Thiess Contractors Indonesia
- Attock Cement Pakistan Limited
- Baramulti Group, Indonesia
- PNOC Exploration Corporation - Philippines
- Alfred C Toepfer International GmbH - Germany
- Global Business Power Corporation, Philippines
- Siam City Cement - Thailand
- Larsen & Toubro Limited - India
- Indonesian Coal Mining Association
- Indogreen Group - Indonesia
- Salva Resources Pvt Ltd - India
- VISA Power Limited - India
- PetroVietnam Power Coal Import and Supply Company
- Xindia Steels Limited - India
- Parry Sugars Refinery, India
- Parliament of New Zealand
- Intertek Mineral Services - Indonesia
- Rio Tinto Coal - Australia
- Eastern Energy - Thailand
- Deloitte Consulting - India
- Iligan Light & Power Inc, Philippines
- Orica Mining Services - Indonesia
- Anglo American - United Kingdom
- Leighton Contractors Pty Ltd - Australia
- Maharashtra Electricity Regulatory Commission - India
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Commonwealth Bank - Australia
- Krishnapatnam Port Company Ltd. - India
- Offshore Bulk Terminal Pte Ltd, Singapore
- London Commodity Brokers - England
- Kohat Cement Company Ltd. - Pakistan
- IHS Mccloskey Coal Group - USA
- Sarangani Energy Corporation, Philippines
- Meenaskhi Energy Private Limited - India
- Mintek Dendrill Indonesia
- Cigading International Bulk Terminal - Indonesia
- Heidelberg Cement - Germany
- Goldman Sachs - Singapore
- Kobexindo Tractors - Indoneisa
- Africa Commodities Group - South Africa
- Kalimantan Lumbung Energi - Indonesia
- AsiaOL BioFuels Corp., Philippines
- Price Waterhouse Coopers - Russia
- Tata Chemicals Ltd - India
- Meralco Power Generation, Philippines
- Toyota Tsusho Corporation, Japan
- Dalmia Cement Bharat India
- Globalindo Alam Lestari - Indonesia
- Agrawal Coal Company - India
- Ministry of Mines - Canada
- Barasentosa Lestari - Indonesia
- MS Steel International - UAE
- Kepco SPC Power Corporation, Philippines
- Metalloyd Limited - United Kingdom
- Banpu Public Company Limited - Thailand
- Bhushan Steel Limited - India
- Kartika Selabumi Mining - Indonesia
- Siam City Cement PLC, Thailand
- Karaikal Port Pvt Ltd - India
- Carbofer General Trading SA - India
- Mercator Lines Limited - India
- Ministry of Transport, Egypt
- Bukit Asam (Persero) Tbk - Indonesia
- Sical Logistics Limited - India
- Petrochimia International Co. Ltd.- Taiwan
- GVK Power & Infra Limited - India
- Samtan Co., Ltd - South Korea
- Orica Australia Pty. Ltd.
- Chettinad Cement Corporation Ltd - India
- Bulk Trading Sa - Switzerland
- Economic Council, Georgia
- Mercuria Energy - Indonesia
- Antam Resourcindo - Indonesia
- Sindya Power Generating Company Private Ltd
- Sinarmas Energy and Mining - Indonesia
- Neyveli Lignite Corporation Ltd, - India
- Planning Commission, India
- Indo Tambangraya Megah - Indonesia
- TeaM Sual Corporation - Philippines
- Karbindo Abesyapradhi - Indoneisa
- Malabar Cements Ltd - India
- Therma Luzon, Inc, Philippines
- Cement Manufacturers Association - India
- Bangladesh Power Developement Board
- SMG Consultants - Indonesia
- OPG Power Generation Pvt Ltd - India
- Standard Chartered Bank - UAE
- Medco Energi Mining Internasional
- Jorong Barutama Greston.PT - Indonesia
- Gujarat Electricity Regulatory Commission - India
- Bayan Resources Tbk. - Indonesia
- Asia Pacific Energy Resources Ventures Inc, Philippines
- Georgia Ports Authority, United States
- Simpson Spence & Young - Indonesia
- IEA Clean Coal Centre - UK
- Petron Corporation, Philippines
- Singapore Mercantile Exchange
- PowerSource Philippines DevCo
- Wood Mackenzie - Singapore
- India Bulls Power Limited - India
- Trasteel International SA, Italy
- Binh Thuan Hamico - Vietnam
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Aboitiz Power Corporation - Philippines
- Sakthi Sugars Limited - India
- Vijayanagar Sugar Pvt Ltd - India
- Holcim Trading Pte Ltd - Singapore
- Kideco Jaya Agung - Indonesia
- Central Electricity Authority - India
- New Zealand Coal & Carbon
- Mjunction Services Limited - India
- Ceylon Electricity Board - Sri Lanka
- Romanian Commodities Exchange
- Billiton Holdings Pty Ltd - Australia
- South Luzon Thermal Energy Corporation
- Directorate Of Revenue Intelligence - India
- Bhatia International Limited - India
- SN Aboitiz Power Inc, Philippines
- Ind-Barath Power Infra Limited - India
- Riau Bara Harum - Indonesia
- Chamber of Mines of South Africa
- Ambuja Cements Ltd - India
- Energy Link Ltd, New Zealand
- Maheswari Brothers Coal Limited - India
- European Bulk Services B.V. - Netherlands
- Videocon Industries ltd - India
- Oldendorff Carriers - Singapore
- Australian Coal Association
- Coalindo Energy - Indonesia
- Renaissance Capital - South Africa
- Ministry of Finance - Indonesia
- Madhucon Powers Ltd - India
- Australian Commodity Traders Exchange
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Tamil Nadu electricity Board
- Grasim Industreis Ltd - India
- Bukit Makmur.PT - Indonesia
- Vedanta Resources Plc - India
- Bharathi Cement Corporation - India
- Kapuas Tunggal Persada - Indonesia
- International Coal Ventures Pvt Ltd - India
- Indian Energy Exchange, India
- Port Waratah Coal Services - Australia
- Global Coal Blending Company Limited - Australia
- Sree Jayajothi Cements Limited - India
- Directorate General of MIneral and Coal - Indonesia
- Minerals Council of Australia
- McConnell Dowell - Australia
- Pendopo Energi Batubara - Indonesia
- Sojitz Corporation - Japan
- Savvy Resources Ltd - HongKong
- Edison Trading Spa - Italy
- Vizag Seaport Private Limited - India
- Gujarat Mineral Development Corp Ltd - India
- White Energy Company Limited
- Electricity Generating Authority of Thailand
- Latin American Coal - Colombia
- SMC Global Power, Philippines
- Energy Development Corp, Philippines
- Makarim & Taira - Indonesia
- CIMB Investment Bank - Malaysia
- Manunggal Multi Energi - Indonesia
- Timah Investasi Mineral - Indoneisa
- Rashtriya Ispat Nigam Limited - India
- The State Trading Corporation of India Ltd
- San Jose City I Power Corp, Philippines
- Bukit Baiduri Energy - Indonesia
- LBH Netherlands Bv - Netherlands
- Lanco Infratech Ltd - India
- Jaiprakash Power Ventures ltd
- ICICI Bank Limited - India
- Independent Power Producers Association of India
- Uttam Galva Steels Limited - India
- Coastal Gujarat Power Limited - India
- Miang Besar Coal Terminal - Indonesia
- Semirara Mining Corp, Philippines
- Indian Oil Corporation Limited
- Coal and Oil Company - UAE
- Aditya Birla Group - India
- Asmin Koalindo Tuhup - Indonesia
- The Treasury - Australian Government
- Gujarat Sidhee Cement - India
- Wilmar Investment Holdings
- Straits Asia Resources Limited - Singapore
|
| |
| |
|