CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Friday, 22 March 24
CASE STUDY: DANGERS OF COAL CARGO - SKULD
Recently, a bulk cargo vessel carrying coal from South Africa to Singapore suffered a fatal accident, resulting in the deaths of three crew members ...


Friday, 22 March 24
INDONESIA APPROVES 922.14 MLN T COAL PRODUCTION QUOTA FOR 2024, ABOVE TARGET - REUTERS
Indonesia has approved coal production quotas totalling 922.14 million metric tons for 2024, Bambang Suswantono, a senior official at the mining mi ...


Friday, 22 March 24
CHINA COAL INDUSTRY GROUP EXPECTS OUTPUT GROWTH TO SLOW IN 2024 - REUTERS
China’s coal output is expected to increase 36 million metric tons, or 0.8%, to about 4.7 billion tonnes in 2024, a Chinese coal industry gro ...


Monday, 18 March 24
THREE KEY TAKEAWAYS FROM OUR EUROPE GAS MARKETS SHORT-TERM OUTLOOK Q1 2024 - WOOD MACKENZIE
European gas prices are currently back to pre-crisis levels, but with a complex series of factors affecting future supply and demand, are they set ...


Wednesday, 06 March 24
INDONESIA AIMS TO FINISH MINING OUTPUT QUOTAS APPROVAL BY END-MARCH, OFFICIAL SAYS - REUTERS
Indonesia’s has approved the mining production quotarequests from more than 120mineral companies and aims to complete the approval process th ...


   1 2 3 4 5   
Showing 1 to 5 news of total 6846
News by Category
Popular News
 
Total Members : 28,429
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Gupta Coal India Ltd
  • Humpuss - Indonesia
  • Samsung - South Korea
  • Simpson Spence & Young - Indonesia
  • SASOL - South Africa
  • The India Cements Ltd
  • SUEK AG - Indonesia
  • Coaltrans Conferences
  • Grasim Industreis Ltd - India
  • White Energy Company Limited
  • Bank of America
  • CESC Limited - India
  • Asian Development Bank
  • Chettinad Cement Corporation Ltd - India
  • Anglo American - United Kingdom
  • SRK Consulting
  • Interocean Group of Companies - India
  • The State Trading Corporation of India Ltd
  • Indorama - Singapore
  • UBS Singapore
  • GN Power Mariveles Coal Plant, Philippines
  • Sarangani Energy Corporation, Philippines
  • KOWEPO - South Korea
  • UOB Asia (HK) Ltd
  • Panama Canal Authority
  • Fearnleys - India
  • GAC Shipping (India) Pvt Ltd
  • Ind-Barath Power Infra Limited - India
  • Eastern Energy - Thailand
  • PLN Batubara - Indonesia
  • Tamil Nadu electricity Board
  • Sojitz Corporation - Japan
  • Metalloyd Limited - United Kingdom
  • Romanian Commodities Exchange
  • McConnell Dowell - Australia
  • Bukit Baiduri Energy - Indonesia
  • IEA Clean Coal Centre - UK
  • Cigading International Bulk Terminal - Indonesia
  • Glencore India Pvt. Ltd
  • Inspectorate - India
  • MS Steel International - UAE
  • Bangkok Bank PCL
  • Qatrana Cement - Jordan
  • TRAFIGURA, South Korea
  • Maharashtra Electricity Regulatory Commission - India
  • Commonwealth Bank - Australia
  • Directorate Of Revenue Intelligence - India
  • Adani Power Ltd - India
  • TNB Fuel Sdn Bhd - Malaysia
  • Banpu Public Company Limited - Thailand
  • Borneo Indobara - Indonesia
  • Infraline Energy - India
  • Ministry of Transport, Egypt
  • Siam City Cement PLC, Thailand
  • Standard Chartered Bank - UAE
  • BRS Brokers - Singapore
  • Renaissance Capital - South Africa
  • San Jose City I Power Corp, Philippines
  • Global Green Power PLC Corporation, Philippines
  • Altura Mining Limited, Indonesia
  • Maybank - Singapore
  • Gujarat Sidhee Cement - India
  • Riau Bara Harum - Indonesia
  • Vedanta Resources Plc - India
  • Formosa Plastics Group - Taiwan
  • Marubeni Corporation - India
  • Tata Chemicals Ltd - India
  • Kobexindo Tractors - Indoneisa
  • Attock Cement Pakistan Limited
  • Essar Steel Hazira Ltd - India
  • Kobe Steel Ltd - Japan
  • BNP Paribas - Singapore
  • Directorate General of MIneral and Coal - Indonesia
  • ASAPP Information Group - India
  • Price Waterhouse Coopers - Russia
  • Jaiprakash Power Ventures ltd
  • Cemex - Philippines
  • Electricity Authority, New Zealand
  • AsiaOL BioFuels Corp., Philippines
  • Barasentosa Lestari - Indonesia
  • Malabar Cements Ltd - India
  • Manunggal Multi Energi - Indonesia
  • Savvy Resources Ltd - HongKong
  • RBS Sempra - UK
  • Mechel - Russia
  • Shenhua Group - China
  • Kumho Petrochemical, South Korea
  • Ince & co LLP
  • Vale Mozambique
  • Thiess Contractors Indonesia
  • Bhatia International Limited - India
  • Bank of China, Malaysia
  • ING Bank NV - Singapore
  • Pipit Mutiara Jaya. PT, Indonesia
  • Bhoruka Overseas - Indonesia
  • Gujarat Mineral Development Corp Ltd - India
  • CoalTek, United States
  • Cement Manufacturers Association - India
  • Core Mineral Indonesia
  • Barclays Capital - USA
  • Electricity Generating Authority of Thailand
  • Cardiff University - UK
  • Indogreen Group - Indonesia
  • Eastern Coal Council - USA
  • GB Group - China
  • Agrawal Coal Company - India
  • PowerSource Philippines DevCo
  • The University of Queensland
  • NTPC Limited - India
  • Kapuas Tunggal Persada - Indonesia
  • SGS (Thailand) Limited
  • Indonesian Coal Mining Association
  • Noble Europe Ltd - UK
  • Global Business Power Corporation, Philippines
  • GNFC Limited - India
  • Surastha Cement
  • Merrill Lynch Bank
  • Bharathi Cement Corporation - India
  • Bukit Asam (Persero) Tbk - Indonesia
  • Binh Thuan Hamico - Vietnam
  • Orica Mining Services - Indonesia
  • McKinsey & Co - India
  • bp singapore
  • Rudhra Energy - India
  • Permata Bank - Indonesia
  • Miang Besar Coal Terminal - Indonesia
  • JPower - Japan
  • Geoservices-GeoAssay Lab
  • Maruti Cements - India
  • Rashtriya Ispat Nigam Limited - India
  • Heidelberg Cement - Germany
  • India Bulls Power Limited - India
  • IHS Mccloskey Coal Group - USA
  • Toyota Tsusho Corporation, Japan
  • Rio Tinto Coal - Australia
  • Shree Cement - India
  • Singapore Mercantile Exchange
  • TeaM Sual Corporation - Philippines
  • Mercator Lines Limited - India
  • Peabody Energy - USA
  • Sindya Power Generating Company Private Ltd
  • Wilmar Investment Holdings
  • Ministry of Mines - Canada
  • OPG Power Generation Pvt Ltd - India
  • EMO - The Netherlands
  • Chamber of Mines of South Africa
  • Coal and Oil Company - UAE
  • CIMB Investment Bank - Malaysia
  • Port Waratah Coal Services - Australia
  • Madhucon Powers Ltd - India
  • Economic Council, Georgia
  • Asmin Koalindo Tuhup - Indonesia
  • globalCOAL - UK
  • Coal India Limited
  • Adaro Indonesia
  • Tanito Harum - Indonesia
  • Maersk Broker
  • South Luzon Thermal Energy Corporation
  • EIA - United States
  • Total Coal South Africa
  • Cargill India Pvt Ltd
  • Deutsche Bank - India
  • Berau Coal - Indonesia
  • SMC Global Power, Philippines
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • London Commodity Brokers - England
  • SMG Consultants - Indonesia
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Meenaskhi Energy Private Limited - India
  • Neyveli Lignite Corporation Ltd, - India
  • European Bulk Services B.V. - Netherlands
  • Gujarat Electricity Regulatory Commission - India
  • ETA - Dubai
  • MEC Coal - Indonesia
  • Mintek Dendrill Indonesia
  • Xindia Steels Limited - India
  • Star Paper Mills Limited - India
  • Iligan Light & Power Inc, Philippines
  • Coeclerici Indonesia
  • Minerals Council of Australia
  • Russian Coal LLC
  • Makarim & Taira - Indonesia
  • Runge Indonesia
  • Britmindo - Indonesia
  • Salva Resources Pvt Ltd - India
  • Orica Australia Pty. Ltd.
  • Thomson Reuters GRC
  • GMR Energy Limited - India
  • PetroVietnam Power Coal Import and Supply Company
  • Jorong Barutama Greston.PT - Indonesia
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • HSBC - Hong Kong
  • Kohat Cement Company Ltd. - Pakistan
  • Petron Corporation, Philippines
  • Indian School of Mines
  • Wood Mackenzie - Singapore
  • Larsen & Toubro Limited - India
  • Mitra SK Pvt Ltd - India
  • Reliance Power - India
  • Indo Tambangraya Megah - Indonesia
  • Enel Italy
  • Petrochimia International Co. Ltd.- Taiwan
  • OCBC - Singapore
  • Therma Luzon, Inc, Philippines
  • Vizag Seaport Private Limited - India
  • Cosco
  • Parliament of New Zealand
  • GHCL Limited - India
  • Sree Jayajothi Cements Limited - India
  • Thailand Anthracite
  • Mitsubishi Corporation
  • IBC Asia (S) Pte Ltd
  • Sical Logistics Limited - India
  • Malco - India
  • Karbindo Abesyapradhi - Indoneisa
  • The Treasury - Australian Government
  • Platts
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • GVK Power & Infra Limited - India
  • Leighton Contractors Pty Ltd - Australia
  • Jatenergy - Australia
  • Trasteel International SA, Italy
  • Bulk Trading Sa - Switzerland
  • Kideco Jaya Agung - Indonesia
  • Bhushan Steel Limited - India
  • APGENCO India
  • Arutmin Indonesia
  • Arch Coal - USA
  • Clarksons - UK
  • Intertek Mineral Services - Indonesia
  • Aditya Birla Group - India
  • Bayan Resources Tbk. - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • U S Energy Resources
  • TGV SRAAC LIMITED, India
  • Edison Trading Spa - Italy
  • Deloitte Consulting - India
  • Thai Mozambique Logistica
  • Samtan Co., Ltd - South Korea
  • SN Aboitiz Power Inc, Philippines
  • Mjunction Services Limited - India
  • Vitol - Bahrain
  • Jindal Steel & Power Ltd - India
  • Carbofer General Trading SA - India
  • Petrosea - Indonesia
  • Cebu Energy, Philippines
  • IMC Shipping - Singapore
  • Australian Commodity Traders Exchange
  • Ceylon Electricity Board - Sri Lanka
  • Videocon Industries ltd - India
  • Karaikal Port Pvt Ltd - India
  • KEPCO - South Korea
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Lafarge - France
  • Indian Energy Exchange, India
  • Kepco SPC Power Corporation, Philippines
  • Uttam Galva Steels Limited - India
  • Pinang Coal Indonesia
  • ICICI Bank Limited - India
  • Freeport Indonesia
  • Central Electricity Authority - India
  • IOL Indonesia
  • CCIC - Indonesia
  • PLN - Indonesia
  • Coastal Gujarat Power Limited - India
  • Central Java Power - Indonesia
  • New Zealand Coal & Carbon
  • Indika Energy - Indonesia
  • Independent Power Producers Association of India
  • Globalindo Alam Lestari - Indonesia
  • Maheswari Brothers Coal Limited - India
  • Global Coal Blending Company Limited - Australia
  • Sakthi Sugars Limited - India
  • Gresik Semen - Indonesia
  • Xstrata Coal
  • Semirara Mining Corp, Philippines
  • Platou - Singapore
  • International Coal Ventures Pvt Ltd - India
  • Antam Resourcindo - Indonesia
  • TNPL - India
  • Kalimantan Lumbung Energi - Indonesia
  • Argus Media - Singapore
  • NALCO India
  • Posco Energy - South Korea
  • Kartika Selabumi Mining - Indonesia
  • Inco-Indonesia
  • World Bank
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • TANGEDCO India
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • J M Baxi & Co - India
  • Oldendorff Carriers - Singapore
  • Baramulti Group, Indonesia
  • Aboitiz Power Corporation - Philippines
  • ANZ Bank - Australia
  • Ernst & Young Pvt. Ltd.
  • Japan Coal Energy Center
  • KPCL - India
  • Africa Commodities Group - South Africa
  • Thermax Limited - India
  • PTC India Limited - India
  • Bahari Cakrawala Sebuku - Indonesia
  • LBH Netherlands Bv - Netherlands
  • Bukit Makmur.PT - Indonesia
  • CNBM International Corporation - China
  • Coal Orbis AG
  • Holcim Trading Pte Ltd - Singapore
  • Coalindo Energy - Indonesia
  • Krishnapatnam Port Company Ltd. - India
  • Latin American Coal - Colombia
  • Ministry of Finance - Indonesia
  • Straits Asia Resources Limited - Singapore
  • KPMG - USA
  • Merrill Lynch Commodities Europe
  • Energy Development Corp, Philippines
  • Moodys - Singapore
  • Energy Link Ltd, New Zealand
  • Thriveni
  • DBS Bank - Singapore
  • Bangladesh Power Developement Board
  • Indonesia Power. PT
  • PetroVietnam
  • Credit Suisse - India
  • Idemitsu - Japan
  • ACC Limited - India
  • Meralco Power Generation, Philippines
  • Power Finance Corporation Ltd., India
  • WorleyParsons
  • PNOC Exploration Corporation - Philippines
  • Tata Power - India
  • VISA Power Limited - India
  • Kaltim Prima Coal - Indonesia
  • Lanco Infratech Ltd - India
  • Sucofindo - Indonesia
  • Ambuja Cements Ltd - India
  • Pendopo Energi Batubara - Indonesia
  • Planning Commission, India
  • Billiton Holdings Pty Ltd - Australia
  • Siam City Cement - Thailand
  • Australian Coal Association
  • Dalmia Cement Bharat India
  • Sinarmas Energy and Mining - Indonesia
  • Medco Energi Mining Internasional
  • Vijayanagar Sugar Pvt Ltd - India
  • World Coal - UK
  • JPMorgan - India
  • Semirara Mining and Power Corporation, Philippines
  • Parry Sugars Refinery, India
  • Indian Oil Corporation Limited
  • Timah Investasi Mineral - Indoneisa
  • Asia Cement - Taiwan
  • Goldman Sachs - Singapore
  • Mercuria Energy - Indonesia
  • Georgia Ports Authority, United States
  • Mitsui